Thomas Mccune
- Listed as
- architect
- Firm
- Kraido Design
- On San Francisco permits
- Sep 2008 to Dec 2019
17 permits since 2000 (architect on 17 permits): 12 completed, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2019 | Expired or cancelled cancelled Jul 2024 | 888 Howard St | add a retractable fabric canopy at an existing outdoor deck of this hotel, the space is already permitted as an outdoor place of assembly, occupancy, occupancy load, use, and egress are unchanged.Details
add a retractable fabric canopy at an existing outdoor deck of this hotel, the space is already permitted as an outdoor place of assembly, occupancy, occupancy load, use, and egress are unchanged. | $3,000,000 | |
| Jun 20, 2018 | Never finaled issued Jul 2018, no final | 888 Howard St | Build Group Inc. | installation of anchor bolts only for possible future fabric canopy, the canopy (if built) will be a seperate project under separate permitDetails
installation of anchor bolts only for possible future fabric canopy, the canopy (if built) will be a seperate project under separate permit | $100,000 |
| Dec 5, 2017 | Completed final sign-off Apr 2018 | 999 California St | Rossi Builders Inc. | construction of one ada ramp near the entrance to the property. (voluntary barrier removal).Details
construction of one ada ramp near the entrance to the property. (voluntary barrier removal). | $20,000 |
| Aug 29, 2017 | Completed final sign-off Dec 2019 | 888 Howard St | Build Group Inc. | removal and replacement in kind of 26% of insulating glass units. approx 1700 units (windows). appearance of building will be unchanged. no change in use, height, area or egress, or construction type occursDetails
removal and replacement in kind of 26% of insulating glass units. approx 1700 units (windows). appearance of building will be unchanged. no change in use, height, area or egress, or construction type occurs | $15,000,000 |
| May 5, 2017 | Completed final sign-off Aug 2017 | 888 Howard St | for planning purposes, this is only for conversion of popos (privately owned public open space) to private open space per sf ord 90-17. no construction involved. (4th and sixth floor) n/a for maher ordinance.Details
for planning purposes, this is only for conversion of popos (privately owned public open space) to private open space per sf ord 90-17. no construction involved. (4th and sixth floor) n/a for maher ordinance. | ||
| Mar 3, 2015 | Expired or cancelled cancelled Jan 2026 | 888 Howard St | renovate room 3118 to remove non-structural walls, reconfigure bathroom, add a pantry/closet and replace interior finishes. minor incidental work also related to this in room 3117 and 3018. n/a for the maher.Details
renovate room 3118 to remove non-structural walls, reconfigure bathroom, add a pantry/closet and replace interior finishes. minor incidental work also related to this in room 3117 and 3018. n/a for the maher. | $150,000 | |
| Mar 13, 2014 | Completed final sign-off May 2014 | 1 Nob Hill Cr | Rossi Builders Inc. | renovation of bar area in the hotel lobby 280 sf. bar unit, cabinetry, paint, wall covering. minor electreical and plumbingDetails
renovation of bar area in the hotel lobby 280 sf. bar unit, cabinetry, paint, wall covering. minor electreical and plumbing | $65,000 |
| Jan 27, 2014 | Completed final sign-off May 2014 | 1221 Harrison St | Saarman Construction,Ltd. | revision to existing pa# 201310159221 reverse door hand to accomodate filed conditions.Details
revision to existing pa# 201310159221 reverse door hand to accomodate filed conditions. | |
| Oct 15, 2013 | Never finaled issued Oct 2013, no final | 1221 Harrison St | Saarman Construction,Ltd. | at main roof: extend one 42" guard rail and install new gates with alarm panic devices and sign about roof use. remove 2 extg gates. install "not an exit" signs.Details
at main roof: extend one 42" guard rail and install new gates with alarm panic devices and sign about roof use. remove 2 extg gates. install "not an exit" signs. | $21,761 |
| Apr 18, 2013 | Expired or cancelled cancelled Mar 2020 | 888 Howard St | add an exterior vestibule to an (e) building to reduce wind & air infiltration. add planter/landscaping per discussions with city planning department.Details
add an exterior vestibule to an (e) building to reduce wind & air infiltration. add planter/landscaping per discussions with city planning department. | $150,000 | |
| Nov 3, 2010 | Completed final sign-off Sep 2011 | 201 Spear St | Turner Construction Co | 9th floor -project scope consists of construciton of new partitions, ceilings & finishes; mechanical, electrical, plumbing & fire protection are included in scope of work.Details
9th floor -project scope consists of construciton of new partitions, ceilings & finishes; mechanical, electrical, plumbing & fire protection are included in scope of work. | $1,500,000 |
| May 15, 2009 | Completed final sign-off Jun 2009 | 1 Market St | Bcci Construction Company | 22nd floor demolition including removal of existing interior tenant improvements per ab -017. life safety & sprinkelrs to remain operational.Details
22nd floor demolition including removal of existing interior tenant improvements per ab -017. life safety & sprinkelrs to remain operational. | $49,500 |
| May 7, 2009 | Completed final sign-off Dec 2009 | 1 Market St | Bcci Construction Company | 20th floor - tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.)Details
20th floor - tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.) | $400,000 |
| May 7, 2009 | Completed final sign-off Oct 2009 | 1 Market St | Bcci Construction Company | 22nd floor tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.)Details
22nd floor tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.) | $1,200,000 |
| May 7, 2009 | Completed final sign-off Oct 2009 | 1 Market St | Bcci Construction Company | 21st floor tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.)Details
21st floor tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.) | $175,000 |
| Apr 2, 2009 | Completed final sign-off Dec 2009 | 1 Market St | Bcci Construction Company | structural work on 22nd floor to support a high density file system. work will be done on the floor deck from the 21st floor ceiling. new anchors for new shelves at 20th floor. disabled access deferred to future t.i. permit.Details
structural work on 22nd floor to support a high density file system. work will be done on the floor deck from the 21st floor ceiling. new anchors for new shelves at 20th floor. disabled access deferred to future t.i. permit. | $54,000 |
| Sep 24, 2008 | Completed final sign-off Oct 2008 | 201 Spear St | Ayoob & Peery Plumbing Co Inc | at 9th fl: relocate fire sprinkler heads per t.i. total 2 relocated.Details
at 9th fl: relocate fire sprinkler heads per t.i. total 2 relocated. | $500 |