Permit GraphShortlistSan Francisco building permits since 2000

Thomas Mccune

License
C27491
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Kraido Design
On San Francisco permits
Sep 2008 to Dec 2019

17 permits since 2000 (architect on 17 permits): 12 completed, 2 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Bcci Construction Company (5), Build Group Inc. (2), Rossi Builders Inc. (2), Saarman Construction,Ltd. (2), Ayoob & Peery Plumbing Co Inc, Turner Construction Co
Engineers
Donald Davies

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 19, 2019Expired or cancelled
cancelled Jul 2024
888 Howard Stadd a retractable fabric canopy at an existing outdoor deck of this hotel, the space is already permitted as an outdoor place of assembly, occupancy, occupancy load, use, and egress are unchanged.
Details
Permit
201912190070

add a retractable fabric canopy at an existing outdoor deck of this hotel, the space is already permitted as an outdoor place of assembly, occupancy, occupancy load, use, and egress are unchanged.

Open the permit page

$3,000,000
Jun 20, 2018Never finaled
issued Jul 2018, no final
888 Howard StBuild Group Inc.installation of anchor bolts only for possible future fabric canopy, the canopy (if built) will be a seperate project under separate permit
Details
Permit
201806202470
Permit issued
Jul 19, 2018

installation of anchor bolts only for possible future fabric canopy, the canopy (if built) will be a seperate project under separate permit

Open the permit page

$100,000
Dec 5, 2017Completed
final sign-off Apr 2018
999 California StRossi Builders Inc.construction of one ada ramp near the entrance to the property. (voluntary barrier removal).
Details
Permit
201712055531
Permit issued
Feb 22, 2018
Final sign-off
Apr 4, 2018

construction of one ada ramp near the entrance to the property. (voluntary barrier removal).

Open the permit page

$20,000
Aug 29, 2017Completed
final sign-off Dec 2019
888 Howard StBuild Group Inc.removal and replacement in kind of 26% of insulating glass units. approx 1700 units (windows). appearance of building will be unchanged. no change in use, height, area or egress, or construction type occurs
Details
Permit
201708296308
Permit issued
Jan 16, 2018
Final sign-off
Dec 5, 2019

removal and replacement in kind of 26% of insulating glass units. approx 1700 units (windows). appearance of building will be unchanged. no change in use, height, area or egress, or construction type occurs

Open the permit page

$15,000,000
May 5, 2017Completed
final sign-off Aug 2017
888 Howard Stfor planning purposes, this is only for conversion of popos (privately owned public open space) to private open space per sf ord 90-17. no construction involved. (4th and sixth floor) n/a for maher ordinance.
Details
Permit
201705055821
Permit issued
Jul 27, 2017
Final sign-off
Aug 2, 2017

for planning purposes, this is only for conversion of popos (privately owned public open space) to private open space per sf ord 90-17. no construction involved. (4th and sixth floor) n/a for maher ordinance.

Open the permit page

Mar 3, 2015Expired or cancelled
cancelled Jan 2026
888 Howard Strenovate room 3118 to remove non-structural walls, reconfigure bathroom, add a pantry/closet and replace interior finishes. minor incidental work also related to this in room 3117 and 3018. n/a for the maher.
Details
Permit
201503039783

renovate room 3118 to remove non-structural walls, reconfigure bathroom, add a pantry/closet and replace interior finishes. minor incidental work also related to this in room 3117 and 3018. n/a for the maher.

Open the permit page

$150,000
Mar 13, 2014Completed
final sign-off May 2014
1 Nob Hill CrRossi Builders Inc.renovation of bar area in the hotel lobby 280 sf. bar unit, cabinetry, paint, wall covering. minor electreical and plumbing
Details
Permit
201403130647
Permit issued
Mar 26, 2014
Final sign-off
May 16, 2014

renovation of bar area in the hotel lobby 280 sf. bar unit, cabinetry, paint, wall covering. minor electreical and plumbing

Open the permit page

$65,000
Jan 27, 2014Completed
final sign-off May 2014
1221 Harrison StSaarman Construction,Ltd.revision to existing pa# 201310159221 reverse door hand to accomodate filed conditions.
Details
Permit
201401277148
Permit issued
Jan 28, 2014
Final sign-off
May 2, 2014

revision to existing pa# 201310159221 reverse door hand to accomodate filed conditions.

Open the permit page

Oct 15, 2013Never finaled
issued Oct 2013, no final
1221 Harrison StSaarman Construction,Ltd.at main roof: extend one 42" guard rail and install new gates with alarm panic devices and sign about roof use. remove 2 extg gates. install "not an exit" signs.
Details
Permit
201310159221
Permit issued
Oct 22, 2013

at main roof: extend one 42" guard rail and install new gates with alarm panic devices and sign about roof use. remove 2 extg gates. install "not an exit" signs.

Open the permit page

$21,761
Apr 18, 2013Expired or cancelled
cancelled Mar 2020
888 Howard Stadd an exterior vestibule to an (e) building to reduce wind & air infiltration. add planter/landscaping per discussions with city planning department.
Details
Permit
201304184906

add an exterior vestibule to an (e) building to reduce wind & air infiltration. add planter/landscaping per discussions with city planning department.

Open the permit page

$150,000
Nov 3, 2010Completed
final sign-off Sep 2011
201 Spear StTurner Construction Co9th floor -project scope consists of construciton of new partitions, ceilings & finishes; mechanical, electrical, plumbing & fire protection are included in scope of work.
Details
Permit
201011034267
Permit issued
Mar 4, 2011
Final sign-off
Sep 1, 2011

9th floor -project scope consists of construciton of new partitions, ceilings & finishes; mechanical, electrical, plumbing & fire protection are included in scope of work.

Open the permit page

$1,500,000
May 15, 2009Completed
final sign-off Jun 2009
1 Market StBcci Construction Company22nd floor demolition including removal of existing interior tenant improvements per ab -017. life safety & sprinkelrs to remain operational.
Details
Permit
200905158459
Permit issued
May 15, 2009
Final sign-off
Jun 11, 2009

22nd floor demolition including removal of existing interior tenant improvements per ab -017. life safety & sprinkelrs to remain operational.

Open the permit page

$49,500
May 7, 2009Completed
final sign-off Oct 2009
1 Market StBcci Construction Company21st floor tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.)
Details
Permit
200905077889
Permit issued
May 7, 2009
Final sign-off
Oct 21, 2009

21st floor tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.)

Open the permit page

$175,000
May 7, 2009Completed
final sign-off Dec 2009
1 Market StBcci Construction Company20th floor - tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.)
Details
Permit
200905077893
Permit issued
May 28, 2009
Final sign-off
Dec 22, 2009

20th floor - tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.)

Open the permit page

$400,000
May 7, 2009Completed
final sign-off Oct 2009
1 Market StBcci Construction Company22nd floor tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.)
Details
Permit
200905077892
Permit issued
May 19, 2009
Final sign-off
Oct 15, 2009

22nd floor tenant improvement including hardwall alteration replacement of doors, relocate partitions, new lighting & finishes, (mech, elec, life safety & sprikelr under separate permit.)

Open the permit page

$1,200,000
Apr 2, 2009Completed
final sign-off Dec 2009
1 Market StBcci Construction Companystructural work on 22nd floor to support a high density file system. work will be done on the floor deck from the 21st floor ceiling. new anchors for new shelves at 20th floor. disabled access deferred to future t.i. permit.
Details
Permit
200904025399
Permit issued
Apr 2, 2009
Final sign-off
Dec 22, 2009

structural work on 22nd floor to support a high density file system. work will be done on the floor deck from the 21st floor ceiling. new anchors for new shelves at 20th floor. disabled access deferred to future t.i. permit.

Open the permit page

$54,000
Sep 24, 2008Completed
final sign-off Oct 2008
201 Spear StAyoob & Peery Plumbing Co Incat 9th fl: relocate fire sprinkler heads per t.i. total 2 relocated.
Details
Permit
200809242488
Permit issued
Sep 24, 2008
Final sign-off
Oct 7, 2008

at 9th fl: relocate fire sprinkler heads per t.i. total 2 relocated.

Open the permit page

$500