Kris W. Johnson
- Listed as
- architect, engineer
- Firm
- Gfds Engineers
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Sep 2026
13 permits since 2000 (engineer on 12 permits, architect on 1 permit): 1 completed, 9 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 2460 Lyon St | Louis Ptak Construction Inc | construction on 1 new adu including rear yard concrete piers and retaining walls, renovation of garden terrance, enclosed pool hall, exterior stairs for adu access and new perimeter iron fence.Details
construction on 1 new adu including rear yard concrete piers and retaining walls, renovation of garden terrance, enclosed pool hall, exterior stairs for adu access and new perimeter iron fence. | $925,000 |
| Jan 14, 2026 | In progress issued Aug 2026 | 535 Pacific Av | Plant Construction Co, Lp | ext envelope,door and enclosure improvements.replace (3) main entrance doors, aluminum, steel fire-rated windows. replace (2) (e) skylights and add (1) new skylight, new shaft enclosure adj to stair enclosure at roof . retrofit (4) ext balconies, including installation of (n) metal guardrails.Details
ext envelope,door and enclosure improvements.replace (3) main entrance doors, aluminum, steel fire-rated windows. replace (2) (e) skylights and add (1) new skylight, new shaft enclosure adj to stair enclosure at roof . retrofit (4) ext balconies, including installation of (n) metal guardrails. | $100,000 |
| Nov 17, 2025 | In progress issued Feb 2026 | 2790 Broadway | Moroso Construction Inc | revision 202403228398 and ref 202501158399; construction field changes include in-kind replacement of conservatory structure strengthening of (e) shear wall.Details
revision 202403228398 and ref 202501158399; construction field changes include in-kind replacement of conservatory structure strengthening of (e) shear wall. | $11,250 |
| Aug 20, 2025 | In progress issued Jan 2026 | 1948 Great Hy | Matarozzi/Pelsinger Builders Inc. | new 374sf studio converted into adu on g/f of (e) duplex - under state adu. legalize (e) kitchen and bathroom, no layout changes. no exterior changes.Details
new 374sf studio converted into adu on g/f of (e) duplex - under state adu. legalize (e) kitchen and bathroom, no layout changes. no exterior changes. | $15,777 |
| May 5, 2025 | In progress issued Nov 2025 | 3355 Pacific Av | Fma Builders | revision 202108236937 and ref 202404059401- changes to interior layout infill enclose under (e) deck, in kind replacment of windows, doors, siding, and roof deck add rooftop mechanical screening, reconfigure side yard walkway mech for future battery storage systemDetails
revision 202108236937 and ref 202404059401- changes to interior layout infill enclose under (e) deck, in kind replacment of windows, doors, siding, and roof deck add rooftop mechanical screening, reconfigure side yard walkway mech for future battery storage system | $100,001 |
| Oct 10, 2024 | In progress issued Dec 2025 | 100 Columbus Av | Plant Construction Co, Lp | revision to pa# 202402055285 & 202312273130, elimination of battery vault at utility garden area and addition of subterranean vault at pavillion basement level with associated changes to foundation and shoring.Details
revision to pa# 202402055285 & 202312273130, elimination of battery vault at utility garden area and addition of subterranean vault at pavillion basement level with associated changes to foundation and shoring. | |
| Feb 5, 2024 | In progress issued Sep 2024 | 100 Columbus Av | Plant Construction Co, Lp | erect a one-story building plus basement, to include employee assembly room, kitchen, single-accomodation restrooms & support spaces. provide exterior enclosure around utility equipment. hardscape and landscape improvements and solar voltaic system on roof of 100 columbus st. under separate permits.Details
erect a one-story building plus basement, to include employee assembly room, kitchen, single-accomodation restrooms & support spaces. provide exterior enclosure around utility equipment. hardscape and landscape improvements and solar voltaic system on roof of 100 columbus st. under separate permits. | $2,100,000 |
| Sep 12, 2023 | In progress issued Jun 2024 | 831 Montgomery St | Plant Construction Co, Lp | alt at 831 montgomery to accommodate bldg merger to 809 montgomery. provide openings btw bldgs for circulation. provide alt to incl studio, meeting spaces, toilet/shower rm. demo (e) annex bldg on w façade. (n) ext egress stair from basement to grade, roof, skylights, & mech. eqpmt, int egress stairDetails
alt at 831 montgomery to accommodate bldg merger to 809 montgomery. provide openings btw bldgs for circulation. provide alt to incl studio, meeting spaces, toilet/shower rm. demo (e) annex bldg on w façade. (n) ext egress stair from basement to grade, roof, skylights, & mech. eqpmt, int egress stair | $2,500,000 |
| Sep 12, 2023 | In progress issued Jun 2024 | 809 Montgomery St | Plant Construction Co, Lp | alt at 831 montgomery to accommodate bldg merger to 809 montgomery. provide openings btw bldgs for circulation. provide alt to incl studio, meeting spaces, toilet/shower rm. demo (e) annex bldg on w façade. (n) ext egress stair from basement to grade, roof, skylights, & mech. eqpmt, int egress stairDetails
alt at 831 montgomery to accommodate bldg merger to 809 montgomery. provide openings btw bldgs for circulation. provide alt to incl studio, meeting spaces, toilet/shower rm. demo (e) annex bldg on w façade. (n) ext egress stair from basement to grade, roof, skylights, & mech. eqpmt, int egress stair | $2,500,000 |
| Jun 21, 2023 | Never finaled issued Jul 2023, no final | 2700 Jackson St | Clayton Timbrell & Co | replacement of (e) property line fence, 10ft, along north property line.Details
replacement of (e) property line fence, 10ft, along north property line. | $30,000 |
| Feb 7, 2020 | Expired or cancelled withdrawn Oct 2020 | 890 El Camino Del Mar | North Bay Construction | rev to p#201904248783: move (e) conc stair towards the street 6ft; move elevator vestibule door.Details
rev to p#201904248783: move (e) conc stair towards the street 6ft; move elevator vestibule door. | $10,000 |
| Mar 2, 2010 | Completed final sign-off Feb 2011 | 3962 19th St | Saturn Construction Co | unit 3962 at 3rd floor. remodel of (e) unit. work includes renovation of kitch and bathrm, add new bathroom, 3 skylights. upgrade 2 (e) windows in lightwell. new radiant heating system. no expansion of envelope.Details
unit 3962 at 3rd floor. remodel of (e) unit. work includes renovation of kitch and bathrm, add new bathroom, 3 skylights. upgrade 2 (e) windows in lightwell. new radiant heating system. no expansion of envelope. | $250,000 |
| Nov 2, 2004 | Expired or cancelled expired Mar 2010 | 317 Eureka St | Cairn Construction | (n) foundation to replace (e) in area of permitted addition. change in header size at 2nd floor /Details
(n) foundation to replace (e) in area of permitted addition. change in header size at 2nd floor / | $3,000 |