Ryan Edward Mcnulty
- License
- C37449
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C37449 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Mbh Architects
- Based in
- New York
- On San Francisco permits
- Mar 2019 to Nov 2026
10 permits since 2000 (architect on 9 permits, engineer on 1 permit): 6 completed, 1 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- B N Builders Inc (3), Trainor Commercial Construction Inc. (3), Plant Construction Co, Lp (2), Michilli Inc
- Engineers
- Andria J. Odrowski, Brandon Elliott, Zack Kardon
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 10
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 340 Post St | scope of work includes performing selective demo & repair to allow for non-ductile concrete building voluntary structural upgrades per sf ordinance 70-25 including new structural steel reinforcement per asce 41 - 23 restorative work at ground floor, mezzanine and 2nd floor.Details
scope of work includes performing selective demo & repair to allow for non-ductile concrete building voluntary structural upgrades per sf ordinance 70-25 including new structural steel reinforcement per asce 41 - 23 restorative work at ground floor, mezzanine and 2nd floor. | $150,000 | |
| May 27, 2026 | Completed final sign-off Aug 2026 | 340 Post St | Plant Construction Co, Lp | revision to pa# 202603127491: in response to district inspector comments - no change to scope. updated general notes and clarification for floor layout.Details
revision to pa# 202603127491: in response to district inspector comments - no change to scope. updated general notes and clarification for floor layout. | |
| Mar 12, 2026 | Completed final sign-off Aug 2026 | 340 Post St | Plant Construction Co, Lp | t.i. selective demo, repair, restorative work throughout interior. exterior work: at facade, 1) remove sign & patch, 2) repair (1) window sash, 3) clean & paint storefront & facade, 4) install ada push buttonsDetails
t.i. selective demo, repair, restorative work throughout interior. exterior work: at facade, 1) remove sign & patch, 2) repair (1) window sash, 3) clean & paint storefront & facade, 4) install ada push buttons | $712,000 |
| Jan 6, 2026 | Completed final sign-off Jan 2026 | 295 Bay St | B N Builders Inc | revision to bpa#: 202510016476 at the request of field inspector to document infill of storefront and floor for compliant slope.Details
revision to bpa#: 202510016476 at the request of field inspector to document infill of storefront and floor for compliant slope. | |
| Oct 27, 2025 | Completed final sign-off Apr 2026 | 295 Bay St | B N Builders Inc | interior only work. new communicating stair, new millwork, slab infill at l1 & l2.Details
interior only work. new communicating stair, new millwork, slab infill at l1 & l2. | $200,000 |
| Oct 1, 2025 | Completed final sign-off Jan 2026 | 295 Bay St | B N Builders Inc | improvements to ground floor and 2nd floor: new flooring, paint, interior wall repair, ceiling repair and replacement, stairs and ramps at existing slab steps, railing at above, new partial height walls at open workspace and meeting rooms. new millwork and appliances at ground floor. interior onlyDetails
improvements to ground floor and 2nd floor: new flooring, paint, interior wall repair, ceiling repair and replacement, stairs and ramps at existing slab steps, railing at above, new partial height walls at open workspace and meeting rooms. new millwork and appliances at ground floor. interior only | $1,500,000 |
| Oct 7, 2020 | Completed final sign-off Nov 2020 | 425 Hayes St | Trainor Commercial Construction Inc. | installation of power door actuators to provide accessible business entrance programDetails
installation of power door actuators to provide accessible business entrance program | $1,000 |
| Sep 12, 2020 | Never finaled issued Nov 2020, no final | 730 Montgomery St | Michilli Inc | installation of new drinking fountain/bottle filler stationDetails
installation of new drinking fountain/bottle filler station | $1,000 |
| Aug 15, 2019 | Never finaled issued Aug 2019, no final | 425 Hayes St | Trainor Commercial Construction Inc. | revision to 201906193894 ti - to int lighting, mep distribution fixture, finishes and non structural partitions. increase of sq by moving non structural partition to adjacent tenant. no change in occupancy or useDetails
revision to 201906193894 ti - to int lighting, mep distribution fixture, finishes and non structural partitions. increase of sq by moving non structural partition to adjacent tenant. no change in occupancy or use | |
| Mar 13, 2019 | Never finaled issued Jun 2019, no final | 425 Hayes St | Trainor Commercial Construction Inc. | t.i. construction will include new non-structural partitions, casework, fixtures anchitectural finishes. no change in occupancyDetails
t.i. construction will include new non-structural partitions, casework, fixtures anchitectural finishes. no change in occupancy | $250,000 |