Ahmad Mohazab
- License
- 17636
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect
- On San Francisco permits
- May 2005 to Aug 2011
3 permits since 2000 (architect on 3 permits): 1 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- T C B Builders Inc, Trainor Commercial Construction Inc.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 16, 2011 | Completed final sign-off Feb 2012 | 120 Stockton St | Trainor Commercial Construction Inc. | 4th floor t.i. interior non-structural work of existing bldg, new partitions & lighting.Details
4th floor t.i. interior non-structural work of existing bldg, new partitions & lighting. | $178,449 |
| Jul 27, 2010 | Never finaled issued Aug 2010, no final | 44 Montgomery St | T C B Builders Inc | ground floor - demo vinyl walls, patch & refinish, smooth paint; demo & replace with new countertops, casework & relocate casework; demo floor & refloor; demo ceiling & receiling, new equipment & relocate existing equipment.Details
ground floor - demo vinyl walls, patch & refinish, smooth paint; demo & replace with new countertops, casework & relocate casework; demo floor & refloor; demo ceiling & receiling, new equipment & relocate existing equipment. | $15,000 |
| May 5, 2005 | Never finaled issued May 2005, no final | 120 Stockton St | demo,partitions,mill work,door,column wrap,new partition,mill work,column wrap,new carpet if needed.Details
demo,partitions,mill work,door,column wrap,new partition,mill work,column wrap,new carpet if needed. | $30,000 |