Permit GraphShortlistSan Francisco building permits since 2000

Ryan Beaton

License
C82786
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C82786 at the Board for Professional Engineers
Listed as
architect, engineer
On San Francisco permits
Aug 2020 to Nov 2026

19 permits since 2000 (architect on 15 permits, engineer on 4 permits): 16 completed, 3 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Evans Brothers Inc (13), Guzman Construction Group Inc., Mc Guire And Hester, Stoer Construction Inc, Treaty Construction
Architects
Adrienne Steichen, Amelia C. Mitchell, Eric Mcswain, Jennifer Devlin
Engineers
David Rossi, Ronald Zeiger

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 7 have no building type on record and are shown as other. 12 permits have no location and are not shown.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 10, 2026In progress
filed Nov 2026, not yet issued
2245 Post Stdemolish a 2 story building,no dwelling unit,no basement-type v.(holocaust center)
Details
Permit
202610139327

demolish a 2 story building,no dwelling unit,no basement-type v.(holocaust center)

Open the permit page

$160,000
Nov 10, 2026In progress
filed Nov 2026, not yet issued
2255 Post Stdemo a 2 story building,no dwelling,no basement,type v.(holocaust center)
Details
Permit
202610139328

demo a 2 story building,no dwelling,no basement,type v.(holocaust center)

Open the permit page

$160,000
Sep 25, 2023In progress
issued Sep 2024
1949 Sunnydale AvMcguire And Hestermayor ed 17-02: construction of privately owned & maintained temporary access road (west access rd) as needed to maintain busing, vehicular, & pedestrian access through sunnydale hope sf site during construction of permanent city-dedicated streets under separate sip permitted through dpw.
Details
Permit
202309257369
Permit issued
Sep 17, 2024

mayor ed 17-02: construction of privately owned & maintained temporary access road (west access rd) as needed to maintain busing, vehicular, & pedestrian access through sunnydale hope sf site during construction of permanent city-dedicated streets under separate sip permitted through dpw.

Open the permit page

$1,030,000
Jun 27, 2022Completed
final sign-off May 2023
2550 Irving StGuzman Construction Group Inc.demolish a 2 story, 2 basement, office building.
Details
Permit
202206277192
Permit issued
Nov 18, 2022
Final sign-off
May 17, 2023

demolish a 2 story, 2 basement, office building.

Open the permit page

Apr 21, 2022Completed
final sign-off Apr 2024
1701 Visitacion AvTreaty Constructionrenovation of (e) children's playground with new play equipment, safety surfacing and fencing. (e) pole light will be relocated or a (n) light installed. renovate (e) 2 bathrooms with all new fixtures.the sewer lateral will be replaced.
Details
Permit
202204212697
Permit issued
Sep 22, 2022
Final sign-off
Apr 29, 2024

renovation of (e) children's playground with new play equipment, safety surfacing and fencing. (e) pole light will be relocated or a (n) light installed. renovate (e) 2 bathrooms with all new fixtures.the sewer lateral will be replaced.

Open the permit page

$1,250,000
Sep 10, 2021Completed
final sign-off Mar 2022
1540 Sunnydale AvEvans Brothers Incbldg 14e - to demolish a 2-story, 8-residential unit, type 5 bldg.
Details
Permit
202109108162
Permit issued
Oct 14, 2021
Final sign-off
Mar 16, 2022

bldg 14e - to demolish a 2-story, 8-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off May 2022
1600 Sunnydale AvEvans Brothers Incbldg 12e - to demolish a 2-story, 8-residential unit, type 5 bldg.
Details
Permit
202109108142
Permit issued
Oct 14, 2021
Final sign-off
May 2, 2022

bldg 12e - to demolish a 2-story, 8-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off Mar 2022
1569 Sunnydale AvEvans Brothers Incbldg 20e - to demolish a 2-story, 8-residential unit, type 5 bldg.
Details
Permit
202109108168
Permit issued
Oct 14, 2021
Final sign-off
Mar 16, 2022

bldg 20e - to demolish a 2-story, 8-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off Mar 2022
1520 Sunnydale AvEvans Brothers Incbldg 16d - to demolish a 2-story, 4-residential unit, type 5 bldg.
Details
Permit
202109108164
Permit issued
Oct 14, 2021
Final sign-off
Mar 16, 2022

bldg 16d - to demolish a 2-story, 4-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off Mar 2022
1551 Sunnydale AvEvans Brothers Incbldg 25e - to demolish a 2-story, 6-residential unit, type 5 bldg.
Details
Permit
202109108170
Permit issued
Oct 14, 2021
Final sign-off
Mar 16, 2022

bldg 25e - to demolish a 2-story, 6-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off Mar 2022
1530 Sunnydale AvEvans Brothers Incbldg 15d - to demolish a 2-story, 4-residential unit, type 5 bldg.
Details
Permit
202109108163
Permit issued
Oct 14, 2021
Final sign-off
Mar 16, 2022

bldg 15d - to demolish a 2-story, 4-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off Mar 2022
170 Hahn StEvans Brothers Incbldg 17d - to demolish a 2-story, 4-residential unit, type 5 bldg.
Details
Permit
202109108165
Permit issued
Oct 14, 2021
Final sign-off
Mar 16, 2022

bldg 17d - to demolish a 2-story, 4-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off Mar 2022
1601 Sunnydale AvEvans Brothers Incbldg 24e - to demolish a 2-story, 8-residential unit, type 5 bldg.
Details
Permit
202109108169
Permit issued
Oct 14, 2021
Final sign-off
Mar 16, 2022

bldg 24e - to demolish a 2-story, 8-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off May 2022
1616 Sunnydale AvEvans Brothers Incbldg 13e - to demolish a 2-story, 8-residential unit, type 5 bldg.
Details
Permit
202109108161
Permit issued
Oct 14, 2021
Final sign-off
May 2, 2022

bldg 13e - to demolish a 2-story, 8-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off Mar 2022
1519 Sunnydale AvEvans Brothers Incbldg 27e - to demolish a 2-story, 6-residential unit, type 5 bldg.
Details
Permit
202109108171
Permit issued
Oct 14, 2021
Final sign-off
Mar 16, 2022

bldg 27e - to demolish a 2-story, 6-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off Mar 2022
1500 Sunnydale AvEvans Brothers Incbldg 18e - to demolish a 2-story, 8-residential unit, type 5 bldg.
Details
Permit
202109108166
Permit issued
Oct 14, 2021
Final sign-off
Mar 16, 2022

bldg 18e - to demolish a 2-story, 8-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off May 2022
1633 Sunnydale AvEvans Brothers Incbldg 22e - to demolish a 2-story, 6-residential unit, type 5 bldg.
Details
Permit
202109108172
Permit issued
Oct 14, 2021
Final sign-off
May 2, 2022

bldg 22e - to demolish a 2-story, 6-residential unit, type 5 bldg.

Open the permit page

$11,000
Sep 10, 2021Completed
final sign-off Mar 2022
1501 Sunnydale AvEvans Brothers Incbldg 19e - to demolish a 2-story, 8-residential unit, type 5 bldg.
Details
Permit
202109108167
Permit issued
Oct 14, 2021
Final sign-off
Mar 16, 2022

bldg 19e - to demolish a 2-story, 8-residential unit, type 5 bldg.

Open the permit page

$11,000
Aug 28, 2020Completed
final sign-off Nov 2022
345 04th StStoer Construction Incstormwater plan review. ref new construction pa# 201807194942.
Details
Permit
202008282836
Permit issued
Nov 15, 2022
Final sign-off
Nov 29, 2022

stormwater plan review. ref new construction pa# 201807194942.

Open the permit page