Permit GraphSan Francisco building permits since 2000

Block 0246, lot 001

1275 Sacramento St

125 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 9, 2026Completed
final sign-off Sep 2026
1275 Sacramento StTruebeck Constructionrevision 202602125853- revise floor finish in kitchen serving area. relocate kitchen mop sink, revise and remove select doors, show structrual exhaust hood and framing details, replace grease interceptor and add (n) water hot piping.
Feb 12, 2026Completed
final sign-off Sep 2026
1275 Sacramento StTruebeck Constructionrenovation of commercial kitchen restrooms & entrance to the cafeteria space used by cathedral school for boys. new exit passageway & alteration to utilities serving the area to be renovated$4,000,000
Aug 25, 2025Completed
final sign-off Sep 2025
1100 California StRise Rigging Llcsupport and anchorage for (n) lighting for temporary art install . structural only$2,500
Aug 6, 2025Completed
final sign-off Sep 2025
1100 California StRise Rigging Llcinterior: install (n) temporary fabric screen to create immersive video experience$40,000
Jul 11, 2025In progress
issued Aug 2025
1100 California StDecker Electric Co Inc Electrical Contraaddition of electrical distribution, panelboards, outlets in support the of the new aura multimedia experience installation at grace cathedral$108,000
Aug 15, 2024In progress
issued Aug 2024
1100 California StBevilacqua & Sonsrevision to pa# 2023-0728-3254 one sheet revision per inspectors request add light fixtures and panic hardware
Sep 11, 2023Completed
final sign-off Aug 2025
1275 Sacramento Stinterior remodel to existing room, new door, new hardwood flrs and baseboards, new lighting & electrical at area of new work only. new wall and ceiling acoustical panels, reconfigured existing hvac & sprinkler systems. no structural work.$25,000
Jul 28, 2023Completed
final sign-off Feb 2025
1100 California StBevilacqua & Sonsreplace (e) outdated electrical distribution switchboards & panel boards with new. move (e) loads over to (n) boards. provide short circuit breaker coordination & arc flash studies & label for all (n) equipment installed.$225,000
Jul 28, 2022Completed
final sign-off Aug 2022
1275 Sacramento StSabah International Incorporatedmodify existing fire alarm system. remove and relocate 2 wall notification appliances. remove 1 wall notification ref 2022205234789$10,675
May 23, 2022Completed
final sign-off Nov 2022
1275 Sacramento StTruebeck Constructionremoval of non-structural partitions to combine 3 existing rooms into 1 new room. removal and replacement of existing finishes, fixtures and millwork. mep deferred$300,000
Apr 5, 2022Completed
final sign-off Nov 2022
1100 California Stelectrical & mechanical improvements required fro the choir house heating project consists of installing mechanical units to serve the choir wing of the building & includes five offices, restroom, choir room & sacristy$100,000
Aug 5, 2021Completed
final sign-off Sep 2021
1275 Sacramento StAllied Fire Protectionremove (1) sprinkler from top of (e) elevator$3,500
Jul 14, 2021Completed
final sign-off Aug 2022
1275 Sacramento StSabah International Incorporatedreplace(e) obsolete simplex 4030 horn/strobe f.a. system w/ new addresseable est 3 f.a system on a like for like basis.in addition, new upgrade will include a new emergency voice communication system & new automatic smoke detection upgrade throughtout.$107,000
May 18, 2021Completed
final sign-off Oct 2022
1275 Sacramento StTruebeck Constructiondeferred submittal for pa 2019-1016-4604 install nfpa 13 fire sprinkler system, connect to an existing bulk piping supplying the attic sprinkler system. all new drain piping, add new sectional control valve to existing standpipe. add new floor control valves on terrace & levels.$125,000
Apr 28, 2021Completed
final sign-off Oct 2022
1275 Sacramento StTruebeck Constructiondeferred mep work including installation of new heatpump system, new energy recovery ventilation system, new exhaust system, connect new hvac system to (e) central system. ref pa 201910164604.
Oct 16, 2019Completed
final sign-off Oct 2022
1275 Sacramento StTruebeck Constructiontwo story horizontal addition to non-historic school bldg. interior renovation of classsroom on two flrs, new roof level restroom.$10,000,000
Aug 9, 2019Never finaled
issued Aug 2019, no final
1100 California Ststreet space
Jul 26, 2019Never finaled
issued Jul 2019, no final
1100 California Ststreet space
Jun 12, 2019Never finaled
issued Jun 2019, no final
1100 California Ststreet space
Jun 6, 2019Completed
final sign-off Aug 2019
1275 Sacramento StTeutonic Construction Incremove partion walls and enlarge classroom #211, replace (e) finishes & modify existing window opening to door in classroom #208. convert storage to ada restroom.$125,000
May 23, 2019Completed
final sign-off Nov 2019
1100 California StO'dwyer Construction Inct.i. in gift shop: including replacement of extg roll up door, replace wall finishes and carpet, relocation of extg interior non load bearing walls at storeroom, replace lighting.$10,000
Aug 15, 2018Never finaled
issued Aug 2018, no final
1100 California Ststreet space
May 11, 2018Never finaled
issued May 2018, no final
1100 California Ststreet space
Jul 7, 2017Never finaled
issued Jul 2017, no final
1275 Sacramento Ststreet space permit
Apr 21, 2017Never finaled
issued Apr 2017, no final
1100 California Ststreet space
Mar 13, 2017Never finaled
issued Mar 2017, no final
1100 California Ststreet space permit -
Jul 27, 2016Never finaled
issued Jul 2016, no final
1100 California Ststreet space
Jun 14, 2016Never finaled
issued Jun 2016, no final
1100 California Ststreet space permit
Mar 15, 2016Never finaled
issued Mar 2016, no final
1100 California Ststreet space permit
May 6, 2015Never finaled
issued May 2015, no final
1100 California Ststreet space permit
Feb 11, 2014Completed
final sign-off Apr 2014
1100 California StAaa Restaurant Fire Control/Dba Aaa Fireinstalling a pyro chem pcl 460 fire suppression system in the kitchen hood & duct. maker ordinance # 155-13 does not apply$1,000
Feb 3, 2014Completed
final sign-off Mar 2014
1100 California StMomsen Construction Dev Increvision to pa#2013-02-26-0916. equivalent facilitation hardship per ab-12 use of power door operators in lieu of level landings @ doors. compliance w/ ordinance no. 155-13 not required. excavation <50 cu.yd.$8,000
Jan 10, 2014Completed
final sign-off Apr 2014
1051 Taylor StInternational Fire Incinstall 3 pendent sprinkler heads, move 6 pendent sprinkler heads, ref pa #2013.1001.8190. compliance with ordinance #155-13 not required. excavation <50 cu.yd.$3,000
Jan 7, 2014Completed
final sign-off Apr 2014
1051 Taylor StMomsen Construction Dev Incmechanical work only. ref arch application #201310018190. n/a for the maher ordinance no. 155-13$20,000
Dec 5, 2013Never finaled
issued Dec 2013, no final
1100 California Ststreet space permit (201306129351) renewal of permit # 1309284
Nov 6, 2013Never finaled
issued Nov 2013, no final
1100 California Ststreet space
Oct 1, 2013Completed
final sign-off Apr 2014
1051 Taylor StMomsen Construction Dev Inckitchen remodel in chapter house, grace cathedral, mechanical work on sep permit, ul300 suppression system for type 1 hood, vif; fa sprinklers on sep permit. jjc$478,000
Jun 12, 2013Completed
final sign-off Jul 2013
1100 California StMomsen Construction Dev Incsaw cut stairs, remve approx 1000ft of stair for investigative reasons, depht of rebar & existing water proof conditions, investigate for dry rot, existing & egress wil not be effected under this scope of work$4,000
Apr 19, 2013Completed
final sign-off May 2013
1100 California StRed Hawk Fire & Security Ca Llc1st & 4th floor-fire alarm adds-addition of 1 smoke detectors at st floor elevator lobby, addition of 1 control relay module at the 4th floor elevator machine room for elevator fireman's hat. t.i. pa #2013.03.11.1895$1,000
Mar 11, 2013Completed
final sign-off May 2013
1100 California StMomsen Construction Dev Incbarrier removeal - elevator access. increase cab size, ajust signage & buttons, adust controls & alarms.$10,080
Feb 26, 2013Completed
final sign-off Mar 2014
1100 California StMomsen Construction Dev Incwater proofing repair and related code compliance work handrails lighting under seperate permit. concrete steps.$1,250,000
Aug 2, 2012Never finaled
issued Aug 2012, no final
1275 Sacramento StStarlite Electric Inc.install 1 new horn strobe, relocate 3 horn strobes & 1 manual pull station. t.i pa# 2012-0404-7503$2,000
Jul 3, 2012Completed
final sign-off Jul 2012
1275 Sacramento StMadden Plumbing, Llcadd 2 heads and relocate 2 heads on 4th fl only$1,000
Jun 25, 2012Completed
final sign-off Sep 2012
1100 California StMomsen Construction Dev Incall work is interior no exterior work. 1. adjust 2 door swings interior 2. install grab bars/ adjust accessories in restrooms 3. adjust interior signage for ada compliance. 4. emergency evacuation signage$8,500
Jun 19, 2012Never finaled
issued Jun 2012, no final
1275 Sacramento Ststreet space
Apr 25, 2012Completed
final sign-off Jul 2012
1275 Sacramento StBirmingham Builders, Incinterior non structural demo. all work to comply with ab-017$6,000
Apr 4, 2012Completed
final sign-off Sep 2012
1275 Sacramento StBirmingham Builders, Inca reconfiguration of (e) partial corridor space converted to a learning center & the reconfiguration of (e) classroom & office. scope of work occurs only at 4th flr.only non structural demo is being proposed. the new classroom is for students inthe upper classes limited to ,3rd through 8th grade$120,000
Jun 10, 2011Never finaled
issued Jun 2011, no final
1112 Jones Ststreet space permit
Aug 20, 2010Never finaled
issued Aug 2010, no final
1275 Sacramento StStarlite Electric Inc.terrace level - remove 1 pull station. remove and relocate 1 smoke detector. install 1 strobe, intall 1 horn strobe$2,500
May 21, 2010Completed
final sign-off Sep 2010
1275 Sacramento StBirmingham Builders, Inccathedral school for boys. the project is the conversion of (e) corridor spaces to become a new office and class room. this includes the removal of one exit and redistribution to (e) exits. mep under separate permit.$19,500
May 12, 2010Never finaled
issued May 2010, no final
1100 California Ststreet space permit
Apr 5, 2010Completed
final sign-off Apr 2010
1275 Sacramento Stobtain final inspection for work approved under 2008-1107-6102. all work complete.
Apr 5, 2010Completed
final sign-off Apr 2010
1275 Sacramento Stobtain final inspection for work approved under 2008-1001-3167. all work complete.
Feb 26, 2010Completed
final sign-off Oct 2010
1100 California StMomsen Construction Dev Incstructural roof repairs, new roofing (to match existing). ada access improvements: (n) ramp to restroom & 1-h/c restroom.$225,000
Jan 11, 2010Completed
final sign-off Mar 2010
1275 Sacramento StAllied Fire Protectionadd 4 fire sprinklers at lobby windows$2,400
Nov 20, 2009Never finaled
issued Nov 2009, no final
1275 Sacramento Ststreet space
Aug 6, 2009Completed
final sign-off Aug 2009
1275 Sacramento StAllied Fire Protectionadd 4 fire sprinkelrs in a new hallway.$3,600
Jul 28, 2009Completed
final sign-off Aug 2009
1275 Sacramento Strevision to 200805091735 to add storage mezzanine in existing music room$5,902
Jun 30, 2009Completed
final sign-off Mar 2010
1275 Sacramento StSimplex Grinnellinstall 1 nac extender, 16 multi candela horn/strobes and 6 multui candela strobes wall mount$8,000
Jun 1, 2009Completed
final sign-off Jul 2009
1275 Sacramento StPlant Construction Co, Lpdemo only per ab017 of existing sacramento st exterior courtyard. removal of selective interior and exterior walls, windows, and storefronts, concrete roof parapets and fencing. ref arch app 200905057675$55,000
May 21, 2009Never finaled
issued May 2009, no final
1275 Sacramento Ststreet space only.
May 21, 2009Never finaled
issued May 2009, no final
1275 Sacramento Ststreet space only.
May 21, 2009Never finaled
issued May 2009, no final
1275 Sacramento Ststreet space only.
May 19, 2009Expired or cancelled
expired Nov 2010
1100 California StDiversified Fire Productsfire alrm t.i. elevator upgrade for diocese house. addition of 1 control relay, 2 smoke detectors.$9,040
May 19, 2009Expired or cancelled
expired Nov 2010
1100 California StDiversified Fire Productsfire alrm t.i. elevator upgrade for south tower. addition of 1 control relay. 4 smoke detectors.$14,266
May 5, 2009Completed
final sign-off Apr 2010
1275 Sacramento Strenovation of sacramento st entrance area to expand lobby/admin areas & library.$1,200,000
May 1, 2009Completed
final sign-off Aug 2009
1275 Sacramento StAllied Fire Protectionadd extension of sprinkler system to new area, 35 sprinkler heads off existing riser. (e) underground fire line udner pa #200810013167. arch ref#200805091735.$21,400
Mar 17, 2009Completed
final sign-off Mar 2009
1100 California StPlant Construction Company Lpto obtain final inspection for work approved under pa#200607065853. all work is completed.
Mar 17, 2009Completed
final sign-off Mar 2009
1100 California StPlant Construction Company Lpto obtain final inspection for work approved under pa#200607287978. all work is completed.
Mar 17, 2009Completed
final sign-off Dec 2009
1100 California StPlant Construction Company Lpto obtain final inspection for work approved under pa#200511218682. all work is completed.
Mar 17, 2009Completed
final sign-off Dec 2009
1100 California StPlant Construction Company Lpto obtain final inspection for work approved under pa#200611016581. all work is completed.
Dec 29, 2008Never finaled
issued Dec 2008, no final
1275 Sacramento Ststreet space permit only.
Dec 19, 2008Completed
final sign-off Aug 2009
1275 Sacramento StSimplex Grinnelladd 3 smoke detectors and 4 horn/strobes and 3 door holder$8,000
Dec 11, 2008Expired or cancelled
expired Mar 2010
1100 California StDiversified Fire Productsbasement fire alarm t.i. - material add requested by fire inspector - 1 smoke detectors, 2 door holders, relocate 2 horn/strobe & 1 strobe.$3,000
Nov 7, 2008Expired or cancelled
expired Mar 2010
1275 Sacramento Strevision to app #200805091735 s1. changes to foundation design
Oct 1, 2008Expired or cancelled
expired Mar 2010
1275 Sacramento StAllied Fire Protection10 feet 4" under ground fire protection pipe$4,000
Aug 4, 2008Expired or cancelled
expired Mar 2010
1100 California StDiversified Fire Productsreplace existing panel at grace cathedral, relocate horns/strobes in preschool$1,365
Jul 21, 2008Completed
final sign-off Oct 2009
1275 Sacramento Strevision to 200806053735: original permanent tieback and underpinning to be replaced with rock nail per letter by geotech treadwell rollo.
Jul 11, 2008Completed
final sign-off Sep 2008
1100 California Stexpand existing preschool restroom at ground floor, ada improvements, new interior window, new folding partition in e class rooms, reconfigure kitchen counter$23,900
Jun 24, 2008Expired or cancelled
cancelled Jan 2026
1100 California StO'dwyer Construction Incremodel bathroom to bring it up to ada codes. removal of non structural wall to make playroom bigger. install interior window in new playroom to office. change kitchen counter. new folding partition at preschool classroom.$23,900
Jun 18, 2008Never finaled
issued Jun 2008, no final
1275 Sacramento Ststreet space
Jun 5, 2008Completed
final sign-off Oct 2009
1275 Sacramento Stunderpinning and permanent tiebacks for proposed excavation. no work on adjacent property or in the public right of way.$125,000
May 9, 2008Completed
final sign-off Apr 2010
1275 Sacramento St2365 sf addition to existing building, new classrooms and remodel of existing jones st entrance.$3,000,000
Jul 11, 2007Never finaled
issued Jul 2007, no final
1100 California Ststreet space permit
May 23, 2007Completed
final sign-off Dec 2007
1100 California StMomsen Construction Dev Incinstall ada access ramp/comply with title 24 requirements. barrier romovalwork onlyl.$15,000
Apr 23, 2007Never finaled
issued Apr 2007, no final
1100 California Ststreet space & sidewalk
Jan 16, 2007Never finaled
issued Jan 2007, no final
1100 California Ststreet space
Nov 1, 2006Expired or cancelled
expired Feb 2009
1100 California StPlant Construction Company Lpalteration to pa# 2006/05/11/1346 to include ceiling plan with fabric baffels & acoustic ceiling. fire rated door added @ cathedtal level.
Oct 20, 2006Never finaled
issued Oct 2006, no final
1100 California Ststreet space
Oct 12, 2006Never finaled
issued Oct 2006, no final
1112 Jones Ststreet space
Oct 2, 2006Expired or cancelled
expired Feb 2009
1112 Jones StMomsen Construction Dev Incthis application removes the adjustment of doors, # 5 (cover sheet). this is an administrative amendment to application # 200606143973. this amendment is to adjust the p.a. requirements, meeting the 20% rule 1134 b.2.1.
Jul 28, 2006Expired or cancelled
expired Feb 2009
1100 California StDecker Electric Co Inc Electrical Contragrace corridor remodel g/f. adding 8 horn strobes per diversifield fire reports drawings fa-1, fa-2 fa-3a$4,000
Jul 6, 2006Expired or cancelled
expired Feb 2009
1100 California StDpw Inc.modification of existin sprinkler system for 1st floor corrodor$8,000
Jun 16, 2006Never finaled
issued Jun 2006, no final
1112 Jones StMomsen Construction Dev Incre-roofing. 2 part unmodified urethane. 60 mils new concrete. 40 miles recoat type b. 60 mils epdm waterproof barrer. standing seam 16 oz lead coated copper. match prosile on cathdral. replace (e) lead roof with lead coated copper. (all non-structural work)$50,000
Jun 14, 2006Completed
final sign-off Nov 2006
1112 Jones StMomsen Construction Dev Incstructural roof repairs. new roofing (to match existing). ada upgrade.$99,230
Jun 9, 2006Never finaled
issued Jun 2006, no final
1100 California Ststreet space
Jun 1, 2006Completed
final sign-off Sep 2006
1100 California StPlant Construction Co, Lprevision to existing permit to relocate presure refief damper & related fire smoke
May 11, 2006Expired or cancelled
expired Feb 2009
1100 California Ststair & corridor upgrade. lower level.$95,000
Apr 17, 2006Never finaled
issued Apr 2006, no final
1100 California Ststreet space permit
Apr 10, 2006Completed
final sign-off Sep 2006
1100 California StFire Safety Supply Incinstall fire suppression system in new kitchen hood. kitchen located in basement$2,200
Mar 16, 2006Never finaled
issued Mar 2006, no final
1100 California Ststreetspace
Feb 17, 2006Completed
final sign-off Sep 2006
1100 California StDecker Electric Co Inc Electrical Contrakitchen fire alarm: 1 horn/strobe, 1 duct detector, 1 smoke detector, 2 door holders, 2 control relay connect ansul per dfp drawings fa-1, fa-2, fa-3 dated 1/6/06$5,000
Feb 17, 2006Completed
final sign-off Sep 2006
1100 California StDecker Electric Co Inc Electrical Contragrace cathedral auditorium - 8 horn strobe per dfp drawings fa-1, fa-2, fa-3 dated 1/6/06$4,000
Jan 19, 2006Completed
final sign-off Sep 2006
1100 California StAllied Fire Protectionrelocate 8 fire sprinklers-basement.$1,650
Dec 8, 2005Never finaled
issued Dec 2005, no final
1100 California Ststreet space
Nov 30, 2005Completed
final sign-off Sep 2006
1100 California Stremodel of kitchen adjacent to multi-purpose room. exterior duct termination approx. 1'x 2'x 3'.$92,000
Nov 21, 2005Expired or cancelled
expired Feb 2009
1100 California Strenovation of multi purpose room on 1st level. new mechanical and electrical. new finish work. no exterior work.$850,000
Nov 18, 2005Completed
final sign-off Sep 2006
1275 Sacramento Stinterior non strutural delmolition in lower level multi purpose room$12,000
Apr 21, 2004Completed
final sign-off Aug 2004
1275 Sacramento Stscience classroom renovation: all new finishes, plumbing, electrical, fixtures & cabinets.$100,000
Aug 6, 2003Completed
final sign-off Sep 2003
1100 California StDecker Electric Co Inc Electrical Contrainstall 9 horn strobes/2 pull stations/1 booster panel for gym renovation tie into the extg$7,000
Jul 1, 2003Never finaled
issued Jul 2003, no final
1100 California Ststreet space
May 27, 2003Completed
final sign-off Jul 2003
1100 California StPlant Constructioninterior demolition includig acoustical ceiling, non bearing partitions and wood floor. alteration$12,000
May 19, 2003Completed
final sign-off Sep 2003
1100 California StPlant Constructioninterior renovation of existing gymnasium including new lighting, new interior finishes, replace$385,000
Sep 12, 2001Completed
final sign-off Oct 2001
1100 California StHathaway Dinwiddie Co.renewal of pa #200009251399
Sep 12, 2001Completed
final sign-off Oct 2001
1100 California StHathaway Dinwiddie Co.renewal for app #200110122869
Sep 10, 2001Expired or cancelled
expired Jan 2002
1112 Jones Stsidewalk repair
Jan 16, 2001Expired or cancelled
expired Jul 2001
1100 California StWilliam P Young Construction Incconstruct flower box piers for lightpoles per attached drwng s1 specs to reinforce centrl flatwork$22,000
Oct 12, 2000Expired or cancelled
expired Apr 2001
1100 California StHathaway Dinwiddie Co.add enclosure at entry door. revision to 2000/04/04/6361.$6,000
Sep 25, 2000Expired or cancelled
expired Jan 2001
1100 California StDecker Electric Co Inc Electrical Contraadd devices to existing life safety system ground floor$4,500
Jun 30, 2000Expired or cancelled
expired Dec 2000
1100 California Strelocate (42) add (3) fire sprinklers/basement pipe schedule
May 23, 2000Expired or cancelled
expired May 2002
1100 California Ststreet space permit
May 3, 2000Completed
final sign-off Sep 2000
1275 Sacramento StPlant Construction Co, Lpone stop: install new cabinets, new lighting for art classroom$200,000
Apr 4, 2000Completed
final sign-off Oct 2001
1100 California StHathaway Dinwiddie Constr**See 729664***one stop interior remodel of conference room, classrooms and gift shop$700,000
Mar 7, 2000Completed
final sign-off Jul 2001
1100 California St
Feb 23, 2000Completed
final sign-off Jul 2001
1100 California StMomsen Construction Dev Increplace damaged sheet metal & concrete roof, clean, repair & seal ext wall surface$1,000,000