Bishwendu Paul
- License
- S3093
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S3093 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Earthquake & Struct. Inc.
- Based in
- Oakland
- On San Francisco permits
- Apr 2004 to Oct 2026
61 permits since 2000 (engineer on 57 permits, architect on 3 permits, authorized agent-others on 2 permits): 47 completed, 5 in progress, 5 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- M N Construction (6), Teutonic Construction Inc (5), Brautovich Construction Inc. (3), Klaus Kubler Construction (3), Royal Lyon Construction (3), K C Kitchen And Bath Builder (2), Modern Craft Construction (2), A M Rocca Inc., Dollard Construction Inc., Dome Construction Corp, Donald S. Maclean, Inc, E F Mcginness And Sons, Francis Mullan Construction, G. A. Delly Deigner Contractor Ltd., Haephus Construction, Hakewill Construction Co. Inc., Hong Shink Construction, James A Mc Grath Dba: Teutonic, John Michael Brautovich, John Patrick Murphy Construction, La Joya Construction Inc, M & L Construction, Mrcc, On The Level Concrete, Pete Humphrey Carpentry Inc, Red Plum Studio, T D S Construction, Westgate Renovators Inc
- Architects
- Vincent Labiano Abello (2), David Bushnell, Glen William Jarvis, Michael Garauablia, Randolph Ruiz
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 29, 2026 | In progress filed Oct 2026, not yet issued | 3618 22nd St | exterior balcony at northeast corner is sagging. provide vertical support with steel post and diagonal brace to strength. all steel construction.Details
exterior balcony at northeast corner is sagging. provide vertical support with steel post and diagonal brace to strength. all steel construction. | $13,500 | |
| May 29, 2025 | In progress issued Jun 2025 | 3697 25th St | M N Construction | revision of structural drawings to pa #202104128307Details
revision of structural drawings to pa #202104128307 | |
| May 27, 2025 | In progress issued May 2025 | 1301 Guerrero St | M N Construction | new 8'x8' dormer with four windows. new spiral staircase. relocate bathroom in former attic (new 3rd story). 2 new skylights. repair south foundation and framing of south garage.Details
new 8'x8' dormer with four windows. new spiral staircase. relocate bathroom in former attic (new 3rd story). 2 new skylights. repair south foundation and framing of south garage. | $75,000 |
| May 16, 2025 | Completed final sign-off Aug 2025 | 37 Miguel St | K C Kitchen And Bath Builder | unit 6: revision to permit 202505136343. reconstruction of rotted/damaged stairs with waterproofing membrane. no change in configuration. work to be done on back side of both properties.Details
unit 6: revision to permit 202505136343. reconstruction of rotted/damaged stairs with waterproofing membrane. no change in configuration. work to be done on back side of both properties. | $10,000 |
| Apr 14, 2025 | Completed final sign-off Aug 2025 | 39 Miguel St | K C Kitchen And Bath Builder | revision to pa# 202503051619: reconstruction of rotted portions of existing stair with waterproofing membrane, no change in configuration.Details
revision to pa# 202503051619: reconstruction of rotted portions of existing stair with waterproofing membrane, no change in configuration. | $10,000 |
| Jun 26, 2024 | In progress issued Jun 2024 | 3697 25th St | M N Construction | revision to pa 202104128307 field condition steel beam to column connections update. ref pa 202305268720Details
revision to pa 202104128307 field condition steel beam to column connections update. ref pa 202305268720 | |
| Jun 3, 2024 | In progress issued Jun 2024 | 1301 Guerrero St | M N Construction | structural repair of garage at rear of building-dryrot-repair.Details
structural repair of garage at rear of building-dryrot-repair. | $10,000 |
| May 26, 2023 | Never finaled issued Jul 2023, no final | 3697 25th St | M N Construction, Modern Craft Construction | revision to pa 2021-0412-8307 (n) wood stairs < 30 above (e) grade; (n) retaining wall below (e) grade; (n) window wells below grade; (e) stairs to basement to be removed excavate part of rear yard 22"Details
revision to pa 2021-0412-8307 (n) wood stairs < 30 above (e) grade; (n) retaining wall below (e) grade; (n) window wells below grade; (e) stairs to basement to be removed excavate part of rear yard 22" | $10,000 |
| Jul 12, 2022 | Completed final sign-off Sep 2024 | 1100 Prague St | La Joya Construction Inc | to comply with nov# 202055379. (n) adu at ground level.Details
to comply with nov# 202055379. (n) adu at ground level. | $31,500 |
| Oct 1, 2021 | Completed final sign-off Mar 2024 | 3759 16th St | M & L Construction | repair & rpelace exteriors stairs in-kind type .Details
repair & rpelace exteriors stairs in-kind type . | $10,000 |
| Apr 12, 2021 | Never finaled issued Nov 2022, no final | 3697 25th St | Klaus Kubler Construction, M N Construction, Modern Craft Construction | adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish.Details
adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish. | $115,000 |
| Feb 25, 2021 | Completed final sign-off Apr 2021 | 5305 California St | Francis Mullan Construction | revision to pa#202010176768. revise size of stair/stair landing footing size from 18" sq to 14" sq (per calculations).Details
revision to pa#202010176768. revise size of stair/stair landing footing size from 18" sq to 14" sq (per calculations). | |
| Jan 28, 2021 | Never finaled filed Jan 2021, never issued | 1301 Guerrero St | revision to pa# 202010146482. field revision at 1st floor. replace concrete foundation with slab,Details
revision to pa# 202010146482. field revision at 1st floor. replace concrete foundation with slab, | $125,000 | |
| Sep 15, 2020 | Completed final sign-off Apr 2022 | 266 Bemis St | Westgate Renovators Inc, Mrcc | dryrot repair to garage door header, change vinyl siding to stucco siding, guardrail change to 42" high rail of same kind, no changes to door/windowDetails
dryrot repair to garage door header, change vinyl siding to stucco siding, guardrail change to 42" high rail of same kind, no changes to door/window | $120,000 |
| Jun 6, 2019 | Completed final sign-off Aug 2019 | 1275 Sacramento St | Teutonic Construction Inc | remove partion walls and enlarge classroom #211, replace (e) finishes & modify existing window opening to door in classroom #208. convert storage to ada restroom.Details
remove partion walls and enlarge classroom #211, replace (e) finishes & modify existing window opening to door in classroom #208. convert storage to ada restroom. | $125,000 |
| Jan 7, 2019 | Completed final sign-off Sep 2019 | 3759 16th St | Dollard Construction Inc. | dry rot repair / retrofit to rear cantilever floor beams at 4 locationsDetails
dry rot repair / retrofit to rear cantilever floor beams at 4 locations | $10,000 |
| Sep 5, 2018 | Completed final sign-off Jan 2019 | 95 05th Av | Teutonic Construction Inc | additional structural beam/joint for new hot tubDetails
additional structural beam/joint for new hot tub | $5,000 |
| Jan 24, 2018 | Completed final sign-off Oct 2019 | 2849 Fillmore St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. to comply with 201714223.Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. to comply with 201714223. | $125,000 | |
| Oct 13, 2017 | Completed final sign-off Feb 2019 | 425 Duboce Av | seismic retrofit to basement/1st fl level with 1 car garage. shearwall, anchorbolts and foundation retrofitDetails
seismic retrofit to basement/1st fl level with 1 car garage. shearwall, anchorbolts and foundation retrofit | $118,000 | |
| Oct 12, 2017 | Completed final sign-off Nov 2017 | 75 Landers St | Klaus Kubler Construction | foundation underpinning: replacement of two post with new concrete pad in laundry area and at walkway to backyard. both locations at ground level.Details
foundation underpinning: replacement of two post with new concrete pad in laundry area and at walkway to backyard. both locations at ground level. | $14,600 |
| Aug 17, 2017 | Completed final sign-off Mar 2019 | 878 Dolores St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $118,000 | |
| Jan 23, 2017 | Completed final sign-off May 2017 | 371 Noe St | E F Mcginness And Sons | replace in kind and upgrade of deteriorated concrete stairway at front entry and planter area at front of bldg.Details
replace in kind and upgrade of deteriorated concrete stairway at front entry and planter area at front of bldg. | $12,000 |
| Nov 21, 2016 | Completed final sign-off Jun 2017 | 60 Porter St | foundation underpinningDetails
foundation underpinning | $10,000 | |
| Oct 20, 2016 | Completed final sign-off May 2019 | 1410 Montgomery St | revision to 201607152490 to comply with planning dept request for structural changes & additional demolition due to structural inadequacy.; comply with nov 201634801.Details
revision to 201607152490 to comply with planning dept request for structural changes & additional demolition due to structural inadequacy.; comply with nov 201634801. | $40,000 | |
| Jul 15, 2016 | Completed final sign-off May 2019 | 1410 Montgomery St | revision pa 2014-1002-7922 (s1) - change (e) poorly constructed joists to new tji joists, reconstruct 3-side walls with new 2x6 framing. front wall remains the same. no changes to shear walls and foundation & bearing walls. fire rated wall assembly changed to a new rated wall.Details
revision pa 2014-1002-7922 (s1) - change (e) poorly constructed joists to new tji joists, reconstruct 3-side walls with new 2x6 framing. front wall remains the same. no changes to shear walls and foundation & bearing walls. fire rated wall assembly changed to a new rated wall. | ||
| Jun 7, 2016 | Completed final sign-off Dec 2016 | 1976 California St | Hakewill Construction Co. Inc. | structural retrofit of existing concrete entry stairs and garage facade, rebuild in kind; maher n/aDetails
structural retrofit of existing concrete entry stairs and garage facade, rebuild in kind; maher n/a | $40,000 |
| May 10, 2016 | Completed final sign-off Oct 2016 | 294 Carl St | G. A. Delly Deigner Contractor Ltd. | revision to 2015 1019 0067: change shear wall types & lengths. replace deteriorated foundations. revise foundation anchors per field conditionsDetails
revision to 2015 1019 0067: change shear wall types & lengths. replace deteriorated foundations. revise foundation anchors per field conditions | |
| Apr 19, 2016 | Completed final sign-off Oct 2017 | 519 24th Av | Klaus Kubler Construction | soft story retrofit per sfbc chapter 34b, asce 41-06, alter/relocate of water supply entry to allow for new foundation, install new main water shut off.Details
soft story retrofit per sfbc chapter 34b, asce 41-06, alter/relocate of water supply entry to allow for new foundation, install new main water shut off. | $150,000 |
| Feb 29, 2016 | Expired or cancelled withdrawn May 2016 | 294 Carl St | revision to appl #201510190067 - remove lead painted siding, chang eshear wall types & lengths, replace some deteriorated foundations.Details
revision to appl #201510190067 - remove lead painted siding, chang eshear wall types & lengths, replace some deteriorated foundations. | ||
| Jun 3, 2015 | Completed final sign-off Dec 2015 | 3395 Balboa St | Royal Lyon Construction | seismic retrofit at garage level walls per sf ordinance 66-13.. sfbc chapter 34b and 2012 iebc appendix a-4Details
seismic retrofit at garage level walls per sf ordinance 66-13.. sfbc chapter 34b and 2012 iebc appendix a-4 | $90,864 |
| Apr 15, 2015 | Completed final sign-off Jun 2016 | 1734 Bay St | Haephus Construction | unit #102- support two joists with header & beam. n/a maher ordinance. remove walls per plans.Details
unit #102- support two joists with header & beam. n/a maher ordinance. remove walls per plans. | $4,000 |
| Mar 16, 2015 | Completed final sign-off Jun 2015 | 432 39th Av | Hong Shink Construction | remove wall between kitchen and dining room. replace kitchen cabinets & countertops, update electrical in kitchen. add new lighting, electrical under separate permit.Details
remove wall between kitchen and dining room. replace kitchen cabinets & countertops, update electrical in kitchen. add new lighting, electrical under separate permit. | $3,000 |
| Feb 4, 2015 | Completed final sign-off Sep 2015 | 773 Rhode Island St | On The Level Concrete | new foundation retaining wall under pinning to extg foundation at the s.e. corner of the basement(crawl space)Details
new foundation retaining wall under pinning to extg foundation at the s.e. corner of the basement(crawl space) | $28,000 |
| Dec 23, 2014 | Completed final sign-off Feb 2015 | 469 Douglass St | selective underpinning to existing brick foundation in vicinity of side door to street level basement behind garage in sw corner.Details
selective underpinning to existing brick foundation in vicinity of side door to street level basement behind garage in sw corner. | $3,000 | |
| Sep 11, 2014 | Completed final sign-off May 2015 | 3618 22nd St | Royal Lyon Construction | soft story seismic strengthening o ftarget story per sf ordinance 66-13, sfbc chater 34b, 2012 iebc appendix a-4.Details
soft story seismic strengthening o ftarget story per sf ordinance 66-13, sfbc chater 34b, 2012 iebc appendix a-4. | $86,200 |
| Jun 27, 2014 | Completed final sign-off Jun 2015 | 230 Gough St | Donald S. Maclean, Inc | sub-basement sidewalk replacement. structural steel, structural concrete, & concrete sidewalk wear surface. no exterior or interior work to building.Details
sub-basement sidewalk replacement. structural steel, structural concrete, & concrete sidewalk wear surface. no exterior or interior work to building. | $31,000 |
| Apr 9, 2014 | Completed final sign-off Apr 2014 | 62 Webster St | Royal Lyon Construction | rev. to pa#201306200049 install 2 cbx 8.2 metal chanel instead of 3. install 1 x 1 footing and 4 x 4 post to support the existing joist.Details
rev. to pa#201306200049 install 2 cbx 8.2 metal chanel instead of 3. install 1 x 1 footing and 4 x 4 post to support the existing joist. | |
| Nov 14, 2013 | Completed final sign-off Mar 2015 | 1362 South Van Ness Av | Teutonic Construction Inc | brick foundation replacement and retrofit: voluntary crawl space shear strengthening.Details
brick foundation replacement and retrofit: voluntary crawl space shear strengthening. | $62,000 |
| Oct 21, 2013 | Completed final sign-off Jan 2014 | 89 Martha Av | John Patrick Murphy Construction | replace old failing unreinforced brick retaining wall at rear of property. build 25' long concrete retaining wall to engineer specsDetails
replace old failing unreinforced brick retaining wall at rear of property. build 25' long concrete retaining wall to engineer specs | $14,000 |
| Jul 25, 2013 | Completed final sign-off Nov 2013 | 1981 Pacific Av | Brautovich Construction Inc. | in kind replacement of entry stairs, replace existing brick porch surface with tile.Details
in kind replacement of entry stairs, replace existing brick porch surface with tile. | $10,000 |
| Jan 17, 2013 | Completed final sign-off Aug 2013 | 184 Yerba Buena Av | revision to pa# 201209149779. repair wet rot/replace support/replace deck rot repair while replacing windows (4) noticed rot removed stucco & noticed wet rot of support & dect rot. looking to repair & replace damaged wood - in kind, same location. cec 151-c.Details
revision to pa# 201209149779. repair wet rot/replace support/replace deck rot repair while replacing windows (4) noticed rot removed stucco & noticed wet rot of support & dect rot. looking to repair & replace damaged wood - in kind, same location. cec 151-c. | ||
| Jan 7, 2013 | Completed final sign-off Jan 2014 | 764 24th Av | Red Plum Studio | infill addition - new bathroom & family room @ ground floor.Details
infill addition - new bathroom & family room @ ground floor. | $45,000 |
| Jun 12, 2012 | Completed final sign-off Feb 2013 | 85 Buena Vista Tr | Teutonic Construction Inc | renovation of existing ground floor level garage & bedroom area, including new bathroom & laundry area, structural, mechanical, electrical & plumbing upgrades. install new washer & dryer at third floor level. remove (e) conc. stair @ rear yard & replace with new expanded stair & landing.Details
renovation of existing ground floor level garage & bedroom area, including new bathroom & laundry area, structural, mechanical, electrical & plumbing upgrades. install new washer & dryer at third floor level. remove (e) conc. stair @ rear yard & replace with new expanded stair & landing. | $200,000 |
| Apr 6, 2012 | Completed final sign-off Sep 2012 | 977 Dolores St | Brautovich Construction Inc. | voluntary foundation upgrade and structural strengthening.Details
voluntary foundation upgrade and structural strengthening. | $40,000 |
| Sep 12, 2011 | Completed final sign-off Jan 2012 | 85 Buena Vista Tr | Teutonic Construction Inc | enlarge existing 2nd floor maste bathroom by 23". no exterior work.Details
enlarge existing 2nd floor maste bathroom by 23". no exterior work. | $15,000 |
| Mar 11, 2011 | Completed final sign-off Sep 2011 | 917 Broderick St | T D S Construction | small bedroom on left side of (e) living rm, put up 1 wall, 1 door. put door to join room with (e) closet - enlarge window on primary facade. create 1/2 bathrm in (e) closet, create breakfast nook by opening kitchen wall & adding wall in (e) office to create small pantryDetails
small bedroom on left side of (e) living rm, put up 1 wall, 1 door. put door to join room with (e) closet - enlarge window on primary facade. create 1/2 bathrm in (e) closet, create breakfast nook by opening kitchen wall & adding wall in (e) office to create small pantry | $20,000 |
| Sep 23, 2010 | Never finaled issued Oct 2010, no final | 1500 Owens St | Dome Construction Corp | modification of existing parapet guardrail for code compliance. the exisitng rail is too low.Details
modification of existing parapet guardrail for code compliance. the exisitng rail is too low. | $30,000 |
| Sep 8, 2010 | Completed final sign-off Apr 2011 | 11 High St | A M Rocca Inc. | repair common area decks per attached plans, repair in kind (7 total).Details
repair common area decks per attached plans, repair in kind (7 total). | $110,000 |
| Jun 24, 2010 | Completed final sign-off Aug 2010 | 1230 Washington St | foundation repair, underpinning, structural stengthening of crawl space, cripple walls.Details
foundation repair, underpinning, structural stengthening of crawl space, cripple walls. | $40,000 | |
| Sep 4, 2009 | Completed final sign-off Jun 2010 | 907 Fulton St | remodel existing kitchen and bath. convert closet and pantry to new bath, add closet in existing bedroom, convert living rm to bedroom and add new closet. add new electric wiring throughout apt. relocate and replace existing water heater and furnace.Details
remodel existing kitchen and bath. convert closet and pantry to new bath, add closet in existing bedroom, convert living rm to bedroom and add new closet. add new electric wiring throughout apt. relocate and replace existing water heater and furnace. | $40,000 | |
| Sep 3, 2009 | Completed final sign-off Nov 2009 | 60 Darrell Pl | Brautovich Construction Inc. | voluntary structural strengthening (e) basement and crawlspace.Details
voluntary structural strengthening (e) basement and crawlspace. | $12,000 |
| Apr 17, 2009 | Completed final sign-off Dec 2009 | 903 Fulton St | reconstruct existing exterior stair in the same configuration and construction as the existing stair.Details
reconstruct existing exterior stair in the same configuration and construction as the existing stair. | $7,500 | |
| Mar 27, 2009 | Completed final sign-off Jul 2009 | 426 Elizabeth St | to comply w/ 3-r report #cc-5429, replace missing post in garage, repair exterior stairway, repair rear deck at 428 elizabeth st.Details
to comply w/ 3-r report #cc-5429, replace missing post in garage, repair exterior stairway, repair rear deck at 428 elizabeth st. | $30,000 | |
| Jan 12, 2009 | Completed final sign-off May 2009 | 479 29th St | rear cottage:dry rot & termite repair. replace 1 beam with new beam at 1st fl. replace 4 posts with four new posts at basement. 2 new footing below 2 new posts.replace wall studs, sill, and top plate at dry rot and termite damaged studs. replace exterior dryrotted siding.Details
rear cottage:dry rot & termite repair. replace 1 beam with new beam at 1st fl. replace 4 posts with four new posts at basement. 2 new footing below 2 new posts.replace wall studs, sill, and top plate at dry rot and termite damaged studs. replace exterior dryrotted siding. | $3,000 | |
| Aug 28, 2008 | Completed final sign-off Dec 2008 | 1981 Pacific Av | John Michael Brautovich | structural strengthening in garage areaDetails
structural strengthening in garage area | $20,000 |
| Dec 4, 2007 | Expired or cancelled expired Mar 2009 | 397 Park St | retaining wall removed and rebuilt. same heigh & location as existing structure. retaining wall max. 6'6" tall with 6' fence on top.Details
retaining wall removed and rebuilt. same heigh & location as existing structure. retaining wall max. 6'6" tall with 6' fence on top. | $20,000 | |
| Nov 6, 2006 | Completed final sign-off Oct 2007 | 80 Surrey St | Pete Humphrey Carpentry Inc | change in size of follor joists enabled by reduction of span by addition of load bearing wall . change in joist direction. minor clarifications of strapping post caps. revision to appl#200507208138.Details
change in size of follor joists enabled by reduction of span by addition of load bearing wall . change in joist direction. minor clarifications of strapping post caps. revision to appl#200507208138. | |
| Aug 24, 2005 | Never finaled issued Aug 2005, no final | 436 Elizabeth St | rev.to appl#200311200776 to show as built per nov.Details
rev.to appl#200311200776 to show as built per nov. | $5,000 | |
| Jan 25, 2005 | Completed final sign-off Dec 2005 | 383 27th St | James A Mc Grath Dba: Teutonic | replace/repair (e) foundation, voluntary upgradeDetails
replace/repair (e) foundation, voluntary upgrade | $35,000 |
| Oct 19, 2004 | Expired or cancelled expired Jan 2006 | 3036 Market St | to add full bathroom to third floor to service bedrooms. (e) dormer not to exceed 8'0"x8'0". addititDetails
to add full bathroom to third floor to service bedrooms. (e) dormer not to exceed 8'0"x8'0". additit | $12,000 | |
| Apr 14, 2004 | Expired or cancelled expired Jan 2008 | 343 Paul Av | enclose existing stair, extend bldg line to front property line with roof, provide handicape restroom in back in 1st floor.Details
enclose existing stair, extend bldg line to front property line with roof, provide handicape restroom in back in 1st floor. | $35,000 |