Block 6532, lot 031
1301 Guerrero St
- City’s use
- Single Family Residential
- Built
- 1909
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 2,368 sq ft
- Lot
- 2,283 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 4, 2026 | In progress issued Mar 2026 | 1301 Guerrero St | M N Construction | revision to pa# 202305268720 to construct a 3'x5' wood framed landing above ground.Details
revision to pa# 202305268720 to construct a 3'x5' wood framed landing above ground. | $2,000 |
| Nov 13, 2025 | In progress issued Jan 2026 | 1301 Guerrero St | M N Construction | remove exterior wood stairs @ rear yard and install new guardrail.Details
remove exterior wood stairs @ rear yard and install new guardrail. | $100 |
| May 29, 2025 | In progress issued Jun 2025 | 3697 25th St | M N Construction | revision of structural drawings to pa #202104128307Details
revision of structural drawings to pa #202104128307 | |
| May 27, 2025 | In progress issued May 2025 | 1301 Guerrero St | M N Construction | new 8'x8' dormer with four windows. new spiral staircase. relocate bathroom in former attic (new 3rd story). 2 new skylights. repair south foundation and framing of south garage.Details
new 8'x8' dormer with four windows. new spiral staircase. relocate bathroom in former attic (new 3rd story). 2 new skylights. repair south foundation and framing of south garage. | $75,000 |
| Jun 26, 2024 | In progress issued Jun 2024 | 3697 25th St | M N Construction | revision to pa 202104128307 field condition steel beam to column connections update. ref pa 202305268720Details
revision to pa 202104128307 field condition steel beam to column connections update. ref pa 202305268720 | |
| Jun 3, 2024 | In progress issued Jun 2024 | 1301 Guerrero St | M N Construction | structural repair of garage at rear of building-dryrot-repair.Details
structural repair of garage at rear of building-dryrot-repair. | $10,000 |
| Nov 8, 2023 | In progress issued May 2024 | 1301 Guerrero St | M N Construction | new wood windows on north facade (7 total) ref to 202104128307Details
new wood windows on north facade (7 total) ref to 202104128307 | $14,000 |
| May 26, 2023 | Never finaled issued Jul 2023, no final | 3697 25th St | M N Construction, Modern Craft Construction | revision to pa 2021-0412-8307 (n) wood stairs < 30 above (e) grade; (n) retaining wall below (e) grade; (n) window wells below grade; (e) stairs to basement to be removed excavate part of rear yard 22"Details
revision to pa 2021-0412-8307 (n) wood stairs < 30 above (e) grade; (n) retaining wall below (e) grade; (n) window wells below grade; (e) stairs to basement to be removed excavate part of rear yard 22" | $10,000 |
| Apr 12, 2021 | Never finaled issued Nov 2022, no final | 3697 25th St | Klaus Kubler Construction, M N Construction, Modern Craft Construction | adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish.Details
adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish. | $115,000 |
| Jan 28, 2021 | Never finaled filed Jan 2021, never issued | 1301 Guerrero St | revision to pa# 202010146482. field revision at 1st floor. replace concrete foundation with slab,Details
revision to pa# 202010146482. field revision at 1st floor. replace concrete foundation with slab, | $125,000 | |
| Oct 27, 2020 | Never finaled filed Oct 2020, never issued | 1301 Guerrero St | Klaus Kubler Construction | add (n) half bath at first floor.Details
add (n) half bath at first floor. | $18,500 |
| Oct 14, 2020 | Never finaled issued Nov 2020, no final | 1301 Guerrero St | Klaus Kubler Construction, Modern Craft Construction | foundation & seismic. shear @ basement. seismic. dry rot and foundation.Details
foundation & seismic. shear @ basement. seismic. dry rot and foundation. | $5,000 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 1301 Guerrero St | Klaus Kubler Construction | bathroom remodel: bathroom 7l x 6.5w x8h. everything like for like. replacing tub with shower , toilet, sink. electrical switch, fan, gfi, light fixture. no floor plan change.Details
bathroom remodel: bathroom 7l x 6.5w x8h. everything like for like. replacing tub with shower , toilet, sink. electrical switch, fan, gfi, light fixture. no floor plan change. | $17,350 |
| Mar 2, 2020 | Expired or cancelled withdrawn Oct 2020 | 1301 Guerrero St | Klaus Kubler Construction | additional of new half bathroom on 1st floor. alteration to electrical system. new 200a subpanel. 2 additional 20 a circuit.Details
additional of new half bathroom on 1st floor. alteration to electrical system. new 200a subpanel. 2 additional 20 a circuit. | $35,000 |
| Apr 12, 2011 | Never finaled issued Apr 2011, no final | 1301 Guerrero St | J I General Contractors | reroofingDetails
reroofing | $8,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- M N Construction (9), Klaus Kubler Construction (5), Modern Craft Construction (3), J I General Contractors
- Architects
- Vincent Labiano Abello (4), Bishwendu Paul
- Engineers
- Bishwendu Paul (4), Bishwendu Paul (2), Sujin Sung, Vincent Labiano Abello
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.