Sujin Sung
- License
- C78186
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C78186 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Sujin Sung Engineering
- Based in
- Oakland
- On San Francisco permits
- Oct 2020 to Dec 2025
10 permits since 2000 (engineer on 10 permits): 4 completed, 2 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Andrew Gallagher Construction (2), Over The Woodsman Builder Inc (2), Cs Construction Co, Klaus Kubler Construction, Raytech Electric, Salcedo's General Builder
- Architects
- Emily Jones (2), Atul Pathare
- Authorized agents
- Andrew Martin Gallagher
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 5
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 1, 2025 | In progress issued Jun 2026 | 2722 Irving St | Over The Woodsman Builder Inc | proposed to convert basement space into a 468 sf jadu, the jadu will consist of a kitchenette, entertainment area, bedroom, one bathroom, and a laundry area. the existing single-family house main floor and second floor are not included in the scope of work.Details
proposed to convert basement space into a 468 sf jadu, the jadu will consist of a kitchenette, entertainment area, bedroom, one bathroom, and a laundry area. the existing single-family house main floor and second floor are not included in the scope of work. | $220,000 |
| Oct 30, 2025 | In progress issued Jun 2026 | 624 Hearst Av | remodel existing kitchen. remodel 2 existing bathrooms. partial rebuild of interior stair to basement. add new deck of 290 sq ft and new stairs at rear of house. replace existing windows. elect, plmg, & mech upgrades.Details
remodel existing kitchen. remodel 2 existing bathrooms. partial rebuild of interior stair to basement. add new deck of 290 sq ft and new stairs at rear of house. replace existing windows. elect, plmg, & mech upgrades. | $65,000 | |
| Aug 29, 2025 | Expired or cancelled cancelled Sep 2025 | 2722 Irving St | proposing to convert basement space into a 468 sf aud. the jadu will consist of a kitchenette, entertainment area, bedroom, one bathroom, and a laundry area. the existing single-family house main floor and 2nd floor are not included in the scope of work.Details
proposing to convert basement space into a 468 sf aud. the jadu will consist of a kitchenette, entertainment area, bedroom, one bathroom, and a laundry area. the existing single-family house main floor and 2nd floor are not included in the scope of work. | $222,000 | |
| Feb 25, 2025 | Completed final sign-off Sep 2026 | 328 Mount Vernon Av | Over The Woodsman Builder Inc | ab1114:construction of a 400-square-foot one bed adu on ground/basement level of(e)sfd w/ full bath, kitchen & dining area w/ access to the rear yard.it will be equipped with(n) electric appliances, water heater & mini split heat pump system.surface renovations to the main level kitchen & bath.Details
ab1114:construction of a 400-square-foot one bed adu on ground/basement level of(e)sfd w/ full bath, kitchen & dining area w/ access to the rear yard.it will be equipped with(n) electric appliances, water heater & mini split heat pump system.surface renovations to the main level kitchen & bath. | $250,000 |
| Dec 3, 2024 | Completed final sign-off Sep 2026 | 650 Howard St | Raytech Electric | to comply with nov 202426714. sub-sidewalk basement reinforcement.Details
to comply with nov 202426714. sub-sidewalk basement reinforcement. | $10,000 |
| Jul 25, 2022 | Completed final sign-off Jun 2024 | 581 Capp St | Andrew Gallagher Construction | replace existing foundation and slab on grade for structural drwawings.Details
replace existing foundation and slab on grade for structural drwawings. | $95,450 |
| May 4, 2022 | Expired or cancelled expired Aug 2026 | 824 Baker St | Salcedo's General Builder | voluntary seismic retrofit at crawl space.Details
voluntary seismic retrofit at crawl space. | $80,000 |
| Feb 22, 2022 | Expired or cancelled cancelled Jan 2026 | 571 Wildwood Wy | Cs Construction Co | interior remodel of 2 bathrooms and the addition of a powder room. kitchen and bedrooms remodel. revised back exterior deck shape and size.Details
interior remodel of 2 bathrooms and the addition of a powder room. kitchen and bedrooms remodel. revised back exterior deck shape and size. | $275,000 |
| Nov 10, 2021 | Completed final sign-off Jun 2024 | 581 Capp St | Andrew Gallagher Construction | addition, restoration & interior renovation. capp st (west) historic facade restoration, replace single-pane wd wndws w/ (n) wd wndws to match historic. exterior restoration to match wd siding-details-doors-stoop-iron work. demo (e) 2-stry rear addition. construct (n) 3-stry addition at rear.Details
addition, restoration & interior renovation. capp st (west) historic facade restoration, replace single-pane wd wndws w/ (n) wd wndws to match historic. exterior restoration to match wd siding-details-doors-stoop-iron work. demo (e) 2-stry rear addition. construct (n) 3-stry addition at rear. | $800,000 |
| Oct 27, 2020 | Never finaled filed Oct 2020, never issued | 1301 Guerrero St | Klaus Kubler Construction | add (n) half bath at first floor. | $18,500 |