Block 3722, lot 024
650 Howard St
- City’s use
- Commercial Retail
- Built
- 1923
- Stories
- 1
- Rooms
- 3 bathrooms
- Building
- 5,750 sq ft
- Lot
- 4,399 sq ft
- Zoning
- C3OSD
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2024 | Completed final sign-off Sep 2026 | 650 Howard St | Raytech Electric | to comply with nov 202426714. sub-sidewalk basement reinforcement.Details
to comply with nov 202426714. sub-sidewalk basement reinforcement. | $10,000 |
| Jul 14, 2014 | Never finaled issued Jul 2014, no final | 650 Howard St | street spaceDetails
street space | ||
| May 8, 2013 | Completed final sign-off Dec 2014 | 650 Howard St | Raytech Electric | change front doors. replace granite finishes. relocate exterior lighting. replace fabric awning from blue to white per plans. ** compliance of maher ordinance #155-13 not req.***Details
change front doors. replace granite finishes. relocate exterior lighting. replace fabric awning from blue to white per plans. ** compliance of maher ordinance #155-13 not req.*** | $15,000 |
| Apr 24, 2013 | Never finaled issued Apr 2013, no final | 650 Howard St | street space.Details
street space. | ||
| Feb 19, 2013 | Never finaled issued Feb 2013, no final | 650 Howard St | street spaceDetails
street space | ||
| Jan 15, 2013 | Completed final sign-off Oct 2013 | 650 Howard St | Raytech Electric | remodel bars, relocate ramp and remodel restroom to ada on ground floor per plan.Details
remodel bars, relocate ramp and remodel restroom to ada on ground floor per plan. | $20,000 |
| Oct 11, 2012 | Never finaled issued Oct 2012, no final | 650 Howard St | Raytech Electric | repair and structural upgrade of a portion of the roof and stair to roof, including repair of roof slope to drain and reconfigure stair to roof. the area of work is the south portion of the roof adjacent to the howard street facad, approx. 1,800 sf.Details
repair and structural upgrade of a portion of the roof and stair to roof, including repair of roof slope to drain and reconfigure stair to roof. the area of work is the south portion of the roof adjacent to the howard street facad, approx. 1,800 sf. | $20,000 |
| Jul 27, 2011 | Never finaled issued Jul 2011, no final | 650 Howard St | street space & sidewalk.Details
street space & sidewalk. | ||
| Feb 7, 2000 | Expired or cancelled expired Mar 2001 | 650 Howard St | remodel exterior facade w/granite & marble tiles paint & recoat (e) doorsDetails
remodel exterior facade w/granite & marble tiles paint & recoat (e) doors | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Raytech Electric (4)
- Engineers
- Sujin Sung
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.