Raytech Electric
- Based in
- Foster City
- On San Francisco permits
- Jun 2007 to Dec 2024
- Last 24 months
- 1 permit filed
26 permits since 2000: 17 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2024 | Completed final sign-off Sep 2026 | 650 Howard St | to comply with nov 202426714. sub-sidewalk basement reinforcement.Details
to comply with nov 202426714. sub-sidewalk basement reinforcement. | $10,000 |
| Sep 29, 2021 | Never finaled filed Sep 2021, never issued | 298 11th St | as built plan to legalize a prexisting roof top storage room. no work to be done. there are no alterations to the existing sturctural and no structural work for this project.Details
as built plan to legalize a prexisting roof top storage room. no work to be done. there are no alterations to the existing sturctural and no structural work for this project. | $1,000 |
| Jan 26, 2018 | Expired or cancelled withdrawn Aug 2019 | 90 Welsh St | to comply with nov201757402. to document the legalization of a storefront in an (e) commercial space. work was done by a previous tenant.Details
to comply with nov201757402. to document the legalization of a storefront in an (e) commercial space. work was done by a previous tenant. | $6,000 |
| Jun 21, 2017 | Never finaled issued Mar 2018, no final | 816 Larkin St | new exterior tile, exterior paint, installing a decorative security gate, remove backlit sign and restoration of existing blade sign. alteration to egress, addition of exit discharge. establish new path of egress. all wk to front, no interior wk, no incr to occ load (214) as per 200812128428.Details
new exterior tile, exterior paint, installing a decorative security gate, remove backlit sign and restoration of existing blade sign. alteration to egress, addition of exit discharge. establish new path of egress. all wk to front, no interior wk, no incr to occ load (214) as per 200812128428. | $20,000 |
| Jun 21, 2017 | Never finaled issued Jun 2017, no final | 816 Larkin St | remodel bathroom on g/f in same location, configuration. (not a t.i. improvement work).Details
remodel bathroom on g/f in same location, configuration. (not a t.i. improvement work). | $5,000 |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 875 Waller St | soft demo: demolish non-bearing walls, cabinets, tiles, floor covering,w ater damaged sheetrock in ref to pa#201602089067.Details
soft demo: demolish non-bearing walls, cabinets, tiles, floor covering,w ater damaged sheetrock in ref to pa#201602089067. | $2,500 |
| Feb 12, 2016 | Expired or cancelled expired Nov 2021 | 1031 Kearny St | to change the size of sign, electric, double faced.Details
to change the size of sign, electric, double faced. | $10,000 |
| Feb 8, 2016 | Completed final sign-off Jul 2017 | 875 Waller St | legalize uit on ground floor per ord. 43-14 add unit #5Details
legalize uit on ground floor per ord. 43-14 add unit #5 | $10,000 |
| Oct 6, 2015 | Completed final sign-off Oct 2016 | 1031 Kearny St | barrier removal. ref pa201504012579 to install left (ada).Details
barrier removal. ref pa201504012579 to install left (ada). | $38,000 |
| Apr 15, 2015 | Expired or cancelled cancelled Jan 2026 | 816 Larkin St | improvement small portion of entry. revision (e) door & minor (e) refinishing to match (e) finishes. increase in sq sf.Details
improvement small portion of entry. revision (e) door & minor (e) refinishing to match (e) finishes. increase in sq sf. | $15,000 |
| Apr 1, 2015 | Never finaled issued Apr 2015, no final | 1031 Kearny St | repair ada lift equipment & front stairway railing & handrail.Details
repair ada lift equipment & front stairway railing & handrail. | $4,000 |
| Jun 6, 2014 | Completed final sign-off Jun 2014 | 242 Columbus Av | encapsulate mechanical equipement on roof to reduce noise and rpoved sound proo wall (2 x 2 unit fan) with soundproof gypsum boardDetails
encapsulate mechanical equipement on roof to reduce noise and rpoved sound proo wall (2 x 2 unit fan) with soundproof gypsum board | $1,000 |
| Dec 17, 2013 | Completed final sign-off Jul 2014 | 391 Broadway | response to nov #200683572, work includes rebuilding of the storefront components at ground floor only. work includes new doors. glazing, exterior finish components. no new lighting, no mechanical/plumbing, no structure. exit with & exit separtion to remain.Details
response to nov #200683572, work includes rebuilding of the storefront components at ground floor only. work includes new doors. glazing, exterior finish components. no new lighting, no mechanical/plumbing, no structure. exit with & exit separtion to remain. | $40,000 |
| May 8, 2013 | Completed final sign-off Dec 2014 | 650 Howard St | change front doors. replace granite finishes. relocate exterior lighting. replace fabric awning from blue to white per plans. ** compliance of maher ordinance #155-13 not req.***Details
change front doors. replace granite finishes. relocate exterior lighting. replace fabric awning from blue to white per plans. ** compliance of maher ordinance #155-13 not req.*** | $15,000 |
| Jan 15, 2013 | Completed final sign-off Oct 2013 | 650 Howard St | remodel bars, relocate ramp and remodel restroom to ada on ground floor per plan.Details
remodel bars, relocate ramp and remodel restroom to ada on ground floor per plan. | $20,000 |
| Oct 11, 2012 | Never finaled issued Oct 2012, no final | 650 Howard St | repair and structural upgrade of a portion of the roof and stair to roof, including repair of roof slope to drain and reconfigure stair to roof. the area of work is the south portion of the roof adjacent to the howard street facad, approx. 1,800 sf.Details
repair and structural upgrade of a portion of the roof and stair to roof, including repair of roof slope to drain and reconfigure stair to roof. the area of work is the south portion of the roof adjacent to the howard street facad, approx. 1,800 sf. | $20,000 |
| Mar 9, 2012 | Completed final sign-off Aug 2012 | 2255 Polk St | for change of use.non structural remodel, new interior finishes floor. finish, lighting, cabinetry, electrical for appliances, entry door upgrade power assist. plumbing for new sink locations.Details
for change of use.non structural remodel, new interior finishes floor. finish, lighting, cabinetry, electrical for appliances, entry door upgrade power assist. plumbing for new sink locations. | $25,000 |
| Nov 17, 2011 | Completed final sign-off Jul 2012 | 412 Broadway | structural revision under bpa# 201109164804 per plan.Details
structural revision under bpa# 201109164804 per plan. | $3,000 |
| Oct 3, 2011 | Completed final sign-off Jul 2012 | 412 Broadway | modify existing hvac/plumbing system in bar, locker rooms and employee toilet area.Details
modify existing hvac/plumbing system in bar, locker rooms and employee toilet area. | $5,000 |
| Sep 16, 2011 | Completed final sign-off Jul 2012 | 412 Broadway | construct opening on 2/fl of night club to first floor below per plan. no change of use. reduction in occupant load for second floor - occupant load verification. plumbing, eectrical, fire sprinkler and fire alarm under seperate permits. separate assembly permit from fire department required.Details
construct opening on 2/fl of night club to first floor below per plan. no change of use. reduction in occupant load for second floor - occupant load verification. plumbing, eectrical, fire sprinkler and fire alarm under seperate permits. separate assembly permit from fire department required. | $150,000 |
| Jun 30, 2011 | Completed final sign-off Dec 2011 | 330 Mission Bay Blvd North | #117 - furring out wall 7'x4', reduce opening size, steel studs only @ living room only.Details
#117 - furring out wall 7'x4', reduce opening size, steel studs only @ living room only. | $300 |
| Dec 16, 2010 | Completed final sign-off Mar 2011 | 210 Columbus Av | install (n) prep sink, (n) ventless cooktop & install (n) fans for in & out fresh air, re-do floors in kitchen area.Details
install (n) prep sink, (n) ventless cooktop & install (n) fans for in & out fresh air, re-do floors in kitchen area. | $16,000 |
| May 20, 2010 | Completed final sign-off May 2012 | 550 Broadway | comply with nov 201040920. install new bathroom at 2nd floor retail and new handrails at existing stairsDetails
comply with nov 201040920. install new bathroom at 2nd floor retail and new handrails at existing stairs | $1,888 |
| Dec 12, 2008 | Completed final sign-off Jul 2009 | 816 Larkin St | interior work only-add 2nd means of exit with new stairs to basement, upgrade restrooms for accessibility, add lockersDetails
interior work only-add 2nd means of exit with new stairs to basement, upgrade restrooms for accessibility, add lockers | $20,000 |
| Mar 6, 2008 | Completed final sign-off Feb 2009 | 412 Broadway | repair of damages resulted from rockslide. wall, floor & ceiling repair. structure to be repaired as necesssary, return to (e) conditionsDetails
repair of damages resulted from rockslide. wall, floor & ceiling repair. structure to be repaired as necesssary, return to (e) conditions | $50,000 |
| Jun 15, 2007 | Completed final sign-off Jul 2007 | 412 Broadway | barracade wall for temporary use of kitchenDetails
barracade wall for temporary use of kitchen | $1,000 |