Permit GraphShortlistSan Francisco building permits since 2000

Raytech Electric

Contractor license
792873
State license record
Based in
Foster City
On San Francisco permits
Jun 2007 to Dec 2024
Last 24 months
1 permit filed

26 permits since 2000: 17 completed, 6 never finaled, 3 expired or cancelled.

Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllStairs 4Kitchen remodel 2Bathroom remodel 2

2 kitchen remodel permits: 2 completed. Typically 3 days from filing to permit and 48 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 16, 2010Completed
final sign-off Mar 2011
210 Columbus Avinstall (n) prep sink, (n) ventless cooktop & install (n) fans for in & out fresh air, re-do floors in kitchen area.
Details
Permit
201012166882
Status
complete
Filed
Dec 16, 2010
Permit issued
Dec 22, 2010
Final sign-off
Mar 3, 2011
Declared cost
$16,000
Address
210 Columbus Av

install (n) prep sink, (n) ventless cooktop & install (n) fans for in & out fresh air, re-do floors in kitchen area.

Open the permit page

$16,000
Jun 15, 2007Completed
final sign-off Jul 2007
412 Broadwaybarracade wall for temporary use of kitchen
Details
Permit
200706154045
Status
complete
Filed
Jun 15, 2007
Permit issued
Jun 15, 2007
Final sign-off
Jul 9, 2007
Declared cost
$1,000
Address
412 Broadway

barracade wall for temporary use of kitchen

Open the permit page

$1,000