Back to bathroom remodel contractors
Raytech Electric
- Based in
- Foster City
- On San Francisco permits
- Jun 2007 to Dec 2024
- Last 24 months
- 1 permit filed
26 permits since 2000: 17 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 712 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2017 | Never finaled issued Jun 2017, no final | 816 Larkin St | remodel bathroom on g/f in same location, configuration. (not a t.i. improvement work).Details
remodel bathroom on g/f in same location, configuration. (not a t.i. improvement work). | $5,000 |
| May 20, 2010 | Completed final sign-off May 2012 | 550 Broadway | comply with nov 201040920. install new bathroom at 2nd floor retail and new handrails at existing stairsDetails
comply with nov 201040920. install new bathroom at 2nd floor retail and new handrails at existing stairs | $1,888 |