Klaus Kubler Construction
- Based in
- Pleasant Hill
- On San Francisco permits
- Apr 2016 to Apr 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 2 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2021 | Never finaled issued Nov 2022, no final | 3697 25th St | adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish.Details
adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish. | $115,000 |
| Oct 27, 2020 | Never finaled filed Oct 2020, never issued | 1301 Guerrero St | add (n) half bath at first floor.Details
add (n) half bath at first floor. | $18,500 |
| Oct 14, 2020 | Never finaled issued Nov 2020, no final | 1301 Guerrero St | foundation & seismic. shear @ basement. seismic. dry rot and foundation.Details
foundation & seismic. shear @ basement. seismic. dry rot and foundation. | $5,000 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 1301 Guerrero St | bathroom remodel: bathroom 7l x 6.5w x8h. everything like for like. replacing tub with shower , toilet, sink. electrical switch, fan, gfi, light fixture. no floor plan change.Details
bathroom remodel: bathroom 7l x 6.5w x8h. everything like for like. replacing tub with shower , toilet, sink. electrical switch, fan, gfi, light fixture. no floor plan change. | $17,350 |
| Mar 2, 2020 | Expired or cancelled withdrawn Oct 2020 | 1301 Guerrero St | additional of new half bathroom on 1st floor. alteration to electrical system. new 200a subpanel. 2 additional 20 a circuit.Details
additional of new half bathroom on 1st floor. alteration to electrical system. new 200a subpanel. 2 additional 20 a circuit. | $35,000 |
| Oct 12, 2017 | Completed final sign-off Nov 2017 | 75 Landers St | foundation underpinning: replacement of two post with new concrete pad in laundry area and at walkway to backyard. both locations at ground level.Details
foundation underpinning: replacement of two post with new concrete pad in laundry area and at walkway to backyard. both locations at ground level. | $14,600 |
| Apr 19, 2016 | Completed final sign-off Oct 2017 | 519 24th Av | soft story retrofit per sfbc chapter 34b, asce 41-06, alter/relocate of water supply entry to allow for new foundation, install new main water shut off.Details
soft story retrofit per sfbc chapter 34b, asce 41-06, alter/relocate of water supply entry to allow for new foundation, install new main water shut off. | $150,000 |