Back to bathroom remodel contractors
Klaus Kubler Construction
- Based in
- Pleasant Hill
- On San Francisco permits
- Apr 2016 to Apr 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 2 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 never finaled, 1 expired or cancelled. Typically 285 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2021 | Never finaled issued Nov 2022, no final | 3697 25th St | adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish.Details
adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish. | $115,000 |
| Oct 27, 2020 | Never finaled filed Oct 2020, never issued | 1301 Guerrero St | add (n) half bath at first floor.Details
add (n) half bath at first floor. | $18,500 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 1301 Guerrero St | bathroom remodel: bathroom 7l x 6.5w x8h. everything like for like. replacing tub with shower , toilet, sink. electrical switch, fan, gfi, light fixture. no floor plan change.Details
bathroom remodel: bathroom 7l x 6.5w x8h. everything like for like. replacing tub with shower , toilet, sink. electrical switch, fan, gfi, light fixture. no floor plan change. | $17,350 |
| Mar 2, 2020 | Expired or cancelled withdrawn Oct 2020 | 1301 Guerrero St | additional of new half bathroom on 1st floor. alteration to electrical system. new 200a subpanel. 2 additional 20 a circuit.Details
additional of new half bathroom on 1st floor. alteration to electrical system. new 200a subpanel. 2 additional 20 a circuit. | $35,000 |