Block 1610, lot 033
3395 Balboa St
- City’s use
- Multi-Family Residential
- Built
- 1961
- Stories
- 3
- Units
- 8
- Rooms
- 12 bathrooms
- Building
- 7,575 sq ft
- Lot
- 3,323 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 16, 2025 | Completed final sign-off Sep 2025 | 3395 Balboa St | Firelectric | full upgrade of fire alarm system as per sffd 1103.7.6.1 and ab-3.08, for low frequency sounders in all sleeping areas.Details
full upgrade of fire alarm system as per sffd 1103.7.6.1 and ab-3.08, for low frequency sounders in all sleeping areas. | $27,500 |
| Jun 1, 2023 | Completed final sign-off Oct 2023 | 3395 Balboa St | Royal Lyon Construction | replace exterior windows- total 3- street facing. aluminum clad or wood of fibrexDetails
replace exterior windows- total 3- street facing. aluminum clad or wood of fibrex | $6,000 |
| Sep 22, 2020 | Completed final sign-off Nov 2020 | 3395 Balboa St | T T K Construction Inc | apt 3: remodel kitchen & bathroom. change electrical panel from closet to hallway.Details
apt 3: remodel kitchen & bathroom. change electrical panel from closet to hallway. | $18,000 |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 3395 Balboa St | T T K Construction Inc | replace master bathroom, bath top and faucet, tile. replace kitchen cabinet, tile, relocation electrical from closet to hallway. replace some locations 5'x 8', 7'x 12' kitchenDetails
replace master bathroom, bath top and faucet, tile. replace kitchen cabinet, tile, relocation electrical from closet to hallway. replace some locations 5'x 8', 7'x 12' kitchen | $18,000 |
| Sep 25, 2017 | Completed final sign-off Oct 2017 | 3395 Balboa St | J L Construction Inc | remodel kitchenDetails
remodel kitchen | $14,000 |
| Jul 12, 2017 | Completed final sign-off Aug 2017 | 3395 Balboa St | Firelectric | fire alarm system upgrade & installation.Details
fire alarm system upgrade & installation. | $23,000 |
| Nov 16, 2015 | Completed final sign-off Dec 2015 | 3395 Balboa St | Bay Area Overhead Door Co. | replace 5 garage doors in existing opennings.Details
replace 5 garage doors in existing opennings. | $6,100 |
| Jun 3, 2015 | Completed final sign-off Dec 2015 | 3395 Balboa St | Royal Lyon Construction | seismic retrofit at garage level walls per sf ordinance 66-13.. sfbc chapter 34b and 2012 iebc appendix a-4Details
seismic retrofit at garage level walls per sf ordinance 66-13.. sfbc chapter 34b and 2012 iebc appendix a-4 | $90,864 |
| Apr 10, 2014 | Completed final sign-off May 2014 | 3395 Balboa St | J L Construction Inc | apt #1. remodel kitchen and 2 bathrooms. no new windows or doors.Details
apt #1. remodel kitchen and 2 bathrooms. no new windows or doors. | $18,000 |
| Mar 3, 2014 | Completed final sign-off Apr 2014 | 3395 Balboa St | J L Construction Inc | work in unit #7: remodel kitchen and bathroom - no new windows and doors.Details
work in unit #7: remodel kitchen and bathroom - no new windows and doors. | $10,000 |
| Apr 12, 2011 | Completed final sign-off Apr 2011 | 3395 Balboa St | Bay Area Overhead Door Co. | replace garage door, visable from street, no structural changes, metal sectional in kind door.Details
replace garage door, visable from street, no structural changes, metal sectional in kind door. | $1,414 |
| Nov 2, 2010 | Completed final sign-off Nov 2010 | 3395 Balboa St | J L Construction Inc | replace hardie plank siding over the south wall extg wood sidings about 750 sq ft plus or minus and painted. not facing the street.Details
replace hardie plank siding over the south wall extg wood sidings about 750 sq ft plus or minus and painted. not facing the street. | $7,000 |
| Feb 28, 2007 | Completed final sign-off Jun 2007 | 3395 Balboa St | Shiu's Construction Co | unit #2- install a 42" guardrail at the roof deck in the light court @ (e) light well deck. repair of deck less than 50% repair/replace. in kind.Details
unit #2- install a 42" guardrail at the roof deck in the light court @ (e) light well deck. repair of deck less than 50% repair/replace. in kind. | $1,000 |
| Dec 27, 2006 | Completed final sign-off Jan 2007 | 3395 Balboa St | Shiu's Construction Co | unit #2 - repair shower room. replace shoer base, faucets, cultured marble, toilet, sink and floor tile. no structural work. no new lighting.Details
unit #2 - repair shower room. replace shoer base, faucets, cultured marble, toilet, sink and floor tile. no structural work. no new lighting. | $5,000 |
| Aug 2, 2006 | Completed final sign-off Sep 2006 | 3395 Balboa St | Shiu's Construction Co | remodel kitchen-apt #4. replace (e) cabinets, faucets, garbage disposal and light fixture.Details
remodel kitchen-apt #4. replace (e) cabinets, faucets, garbage disposal and light fixture. | $10,000 |
| Jun 1, 2006 | Completed final sign-off Jul 2006 | 3395 Balboa St | Shiu's Construction Co | remodel master bathroom. replace bath tub sink, toilet and floortile. remodel second bathoom. replace lavatory toilet & floor tile. remodel kitchen. replace (e) cabinets faucet, sink, light fixture and coutertop. no changes to partitions or windows.Details
remodel master bathroom. replace bath tub sink, toilet and floortile. remodel second bathoom. replace lavatory toilet & floor tile. remodel kitchen. replace (e) cabinets faucet, sink, light fixture and coutertop. no changes to partitions or windows. | $20,000 |
| Nov 2, 2005 | Completed final sign-off Nov 2005 | 3395 Balboa St | Maap Corp Dba Save Energy Co | replace 24 windows in kind no structural changes 20 visible from the street trim detail to remain as is w/u factor on manufacture's lable. same for sameDetails
replace 24 windows in kind no structural changes 20 visible from the street trim detail to remain as is w/u factor on manufacture's lable. same for same | $17,895 |
| Sep 7, 2005 | Completed final sign-off Oct 2005 | 3395 Balboa St | Shiu's Construction Co | shower room. change lavatory sink. toilet. shower base.Details
shower room. change lavatory sink. toilet. shower base. | $10,000 |
| Jul 28, 2005 | Completed final sign-off Aug 2005 | 3395 Balboa St | Shiu's Construction Co | replace the tile & lavatory sink, bathtub in apartment #8 to comply with nov #200562065Details
replace the tile & lavatory sink, bathtub in apartment #8 to comply with nov #200562065 | $9,000 |
| Mar 7, 2005 | Completed final sign-off Mar 2005 | 3395 Balboa St | City Construction Co | remove extg aluminum windows and replace with new double paned vinyl wndws to match extgDetails
remove extg aluminum windows and replace with new double paned vinyl wndws to match extg | $8,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.