Mike Howe
- Listed as
- architect, engineer, lessee
- Firm
- Glumac
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Jul 2025
44 permits since 2000 (engineer on 28 permits, architect on 15 permits, lessee on 1 permit): 30 completed, 1 in progress, 3 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 11, 2025 | In progress issued Aug 2025 | 1100 California St | Decker Electric Co Inc Electrical Contra | addition of electrical distribution, panelboards, outlets in support the of the new aura multimedia experience installation at grace cathedralDetails
addition of electrical distribution, panelboards, outlets in support the of the new aura multimedia experience installation at grace cathedral | $108,000 |
| Jul 28, 2023 | Completed final sign-off Feb 2025 | 1100 California St | Bevilacqua & Sons | replace (e) outdated electrical distribution switchboards & panel boards with new. move (e) loads over to (n) boards. provide short circuit breaker coordination & arc flash studies & label for all (n) equipment installed.Details
replace (e) outdated electrical distribution switchboards & panel boards with new. move (e) loads over to (n) boards. provide short circuit breaker coordination & arc flash studies & label for all (n) equipment installed. | $225,000 |
| Sep 6, 2022 | Completed final sign-off Feb 2023 | 570 Beale St | Regency General Contractors Inc | bldg 4: revision to permit 202101253240. removal of mechanical work. all proposed wall mounted heater to be removed.Details
bldg 4: revision to permit 202101253240. removal of mechanical work. all proposed wall mounted heater to be removed. | |
| Sep 6, 2022 | Completed final sign-off Feb 2023 | 160 Brannan St | Regency General Contractors Inc | bldg 3: revision to permit 202101253239. removal of mechanical work.Details
bldg 3: revision to permit 202101253239. removal of mechanical work. | |
| Apr 5, 2022 | Completed final sign-off Nov 2022 | 1100 California St | electrical & mechanical improvements required fro the choir house heating project consists of installing mechanical units to serve the choir wing of the building & includes five offices, restroom, choir room & sacristyDetails
electrical & mechanical improvements required fro the choir house heating project consists of installing mechanical units to serve the choir wing of the building & includes five offices, restroom, choir room & sacristy | $100,000 | |
| Apr 2, 2021 | Never finaled issued Jan 2023, no final | 3 Bayside Village Pl | C C I Commercial Construction & Improv | building 8, podium 3: renovations to existing leasing office and property management.Details
building 8, podium 3: renovations to existing leasing office and property management. | $1,003,000 |
| Mar 9, 2021 | Expired or cancelled cancelled Jan 2026 | 3 Bayside Village Pl | podium 3, level p1: new pool equipment room in garage. podium 3, level 1: renovation of existing courtyard.Details
podium 3, level p1: new pool equipment room in garage. podium 3, level 1: renovation of existing courtyard. | $1,920,000 | |
| Mar 5, 2021 | Expired or cancelled withdrawn Oct 2021 | 3 Bayside Village Pl | podium 2, level p1: new pool equipment room in garage. podium 2, level 1: renovation of existing courtyard.Details
podium 2, level p1: new pool equipment room in garage. podium 2, level 1: renovation of existing courtyard. | $1,040,000 | |
| Mar 4, 2021 | Expired or cancelled withdrawn Oct 2021 | 3 Bayside Village Pl | podium 1, level 1 p1: new pool equipment room in garage. podium 1, level 1: renovation of existing courtyard.Details
podium 1, level 1 p1: new pool equipment room in garage. podium 1, level 1: renovation of existing courtyard. | $1,222,145 | |
| Jan 25, 2021 | Completed final sign-off Feb 2023 | 160 Brannan St | Regency General Contractors Inc | bldg 3: update existing roof deck.Details
bldg 3: update existing roof deck. | $45,000 |
| Jan 25, 2021 | Expired or cancelled cancelled Nov 2024 | 570 Beale St | Regency General Contractors Inc | all buildings: paint exteriors building 4: remove fabric canopies at amenity. building 5: metal canopy at building corner entrance. replace corner entrance guardrail.Details
all buildings: paint exteriors building 4: remove fabric canopies at amenity. building 5: metal canopy at building corner entrance. replace corner entrance guardrail. | $100,000 |
| Jan 25, 2021 | Expired or cancelled cancelled Nov 2024 | 160 Brannan St | Regency General Contractors Inc | bldg 1, 2, 3. exterior work only, alterations to facade of existing buildings. all buildings: paint exterior. bldg 1: metal canopy at building corner entrance. bldg 3: metal with glass canopies.Details
bldg 1, 2, 3. exterior work only, alterations to facade of existing buildings. all buildings: paint exterior. bldg 1: metal canopy at building corner entrance. bldg 3: metal with glass canopies. | $100,000 |
| Dec 17, 2020 | Expired or cancelled cancelled Jan 2026 | 3 Bayside Village Pl | pavilion structure landscape upgrades to promenade and firelane.Details
pavilion structure landscape upgrades to promenade and firelane. | $2,500,000 | |
| Dec 26, 2019 | Completed final sign-off Dec 2023 | 160 Brannan St | Promax Builders Inc Dba Procraft Builder | building #3: renovation of existing amenity space om level 1.Details
building #3: renovation of existing amenity space om level 1. | $198,500 |
| Dec 26, 2019 | Completed final sign-off Dec 2023 | 570 Beale St | Promax Builders Inc Dba Procraft Builder | building #4: renovations of existing amernity spaces on level 1 in building #4.Details
building #4: renovations of existing amernity spaces on level 1 in building #4. | $198,500 |
| Feb 6, 2019 | Completed final sign-off Feb 2021 | 2 Henry Adams St | C C I Commercial Construction & Improv | renovation of tenant space (floors 1 & 2m) and lobby. includes the expansion of the existing level 1 toilet core, adding two designated ada, unisex toilet rooms. relocate stairs. no exteriors work. no refacing frams, mulions or glazing at window.Details
renovation of tenant space (floors 1 & 2m) and lobby. includes the expansion of the existing level 1 toilet core, adding two designated ada, unisex toilet rooms. relocate stairs. no exteriors work. no refacing frams, mulions or glazing at window. | $650,000 |
| Jul 20, 2016 | Completed final sign-off Nov 2016 | 580 California St | Richlen Construction | 13/f suite 1300 - t.i. project work consists of demolition of existing glazing & partitions, new work of new ceiling height partitions, doors, frames & hrdward, new millwork, power/data, & finishes throughout. sprinkler/life safety under separate permit. n/a maher ordinaDetails
13/f suite 1300 - t.i. project work consists of demolition of existing glazing & partitions, new work of new ceiling height partitions, doors, frames & hrdward, new millwork, power/data, & finishes throughout. sprinkler/life safety under separate permit. n/a maher ordina | $232,000 |
| May 28, 2015 | Completed final sign-off Aug 2016 | 1 Maritime Pz | Skyline Construction | mechanical and electrical work for t.i ref 201505045265Details
mechanical and electrical work for t.i ref 201505045265 | $200,000 |
| Feb 18, 2015 | Completed final sign-off Mar 2016 | 300 Clay St | Matrix Hg Inc | 26th flr -construct (1) interior wall w/(2) double doors, modify duct work to accomodate (1) new supply fan, replace (1) exhaust fan, replace (20 chillers w/(2) new liked kind chillers, modify piping connected to chillers, modify elect connections to chillers,install new refrigerant monitor systemDetails
26th flr -construct (1) interior wall w/(2) double doors, modify duct work to accomodate (1) new supply fan, replace (1) exhaust fan, replace (20 chillers w/(2) new liked kind chillers, modify piping connected to chillers, modify elect connections to chillers,install new refrigerant monitor system | $875,000 |
| Feb 12, 2013 | Completed final sign-off Oct 2013 | 888 Brannan St | Novo Construction Inc | 4th floor-m.e.p work associated with approved ti pa# 2012-1228-6968Details
4th floor-m.e.p work associated with approved ti pa# 2012-1228-6968 | $200,000 |
| Dec 17, 2012 | Never finaled issued Feb 2013, no final | 935 Folsom St | Webcor Construction Lp | install diesel generator in parking area of firehouse no. 1. new costruction under separate application permit #2011-07-08-9760.Details
install diesel generator in parking area of firehouse no. 1. new costruction under separate application permit #2011-07-08-9760. | $45,000 |
| Jun 13, 2012 | Completed final sign-off Nov 2012 | 201 Mission St | Richlen Construction | t.i.- 12/fl: new/reloc lighting&basic elec. hvac:35 new supplys. 27 new interior return airgrills, vav boxes, 2-5 ion ac unit w/thermostat. plumbing:drinking fountain, plumbing. restroom: 2 new ada toilets, cosmetic renovates new finishes thruout. sprinklers and fire alarmDetails
t.i.- 12/fl: new/reloc lighting&basic elec. hvac:35 new supplys. 27 new interior return airgrills, vav boxes, 2-5 ion ac unit w/thermostat. plumbing:drinking fountain, plumbing. restroom: 2 new ada toilets, cosmetic renovates new finishes thruout. sprinklers and fire alarm | $920,000 |
| Jan 13, 2012 | Expired or cancelled cancelled Jul 2016 | 2041 Larkin St | an unmanned telecomunt facility consisting of adding 3 (n) rbs cabinets.(n) purcell cabinet.(n) 26" dc power rack. (n) 19" rack w/ 6601 rbs equit. (n) battery rack inside (n) 11'-11"x11'-4" at&t 2nd fl lease area. add't 6 (n) a&t antennas inside (e) steeple behind (n) frp screens. paint to match (e)Details
an unmanned telecomunt facility consisting of adding 3 (n) rbs cabinets.(n) purcell cabinet.(n) 26" dc power rack. (n) 19" rack w/ 6601 rbs equit. (n) battery rack inside (n) 11'-11"x11'-4" at&t 2nd fl lease area. add't 6 (n) a&t antennas inside (e) steeple behind (n) frp screens. paint to match (e) | $125,000 | |
| Feb 19, 2009 | Expired or cancelled cancelled Jan 2026 | 640 Sutter St | Turner Construction Co | revision to pa# 2006-0817-9733-revise egress signage per field walk-through with fire marshall (mike estevez) and revision to egress path for floors 4m & 5Details
revision to pa# 2006-0817-9733-revise egress signage per field walk-through with fire marshall (mike estevez) and revision to egress path for floors 4m & 5 | $2,000 |
| Jan 23, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 10th floor-mechanical & electrical work associated with approved pa# 2009-0107-9681 including relocation of air outlets, adjusting cfm, 1 vav box, minor demo, relocation & installation of new lighting fixtures & controls. ls under seperate permitDetails
10th floor-mechanical & electrical work associated with approved pa# 2009-0107-9681 including relocation of air outlets, adjusting cfm, 1 vav box, minor demo, relocation & installation of new lighting fixtures & controls. ls under seperate permit | $88,425 |
| Jan 23, 2009 | Completed final sign-off Aug 2009 | 211 Main St | Bcci Construction Company | 11th floor-mechanical & electrical work associated with approved pa# 2009-0107-9680 including relocation of air outlets, adjusting cfm, 1 vav box, minor demo, relocation & installation of lighting fixtures & controls. ls under seperate permitDetails
11th floor-mechanical & electrical work associated with approved pa# 2009-0107-9680 including relocation of air outlets, adjusting cfm, 1 vav box, minor demo, relocation & installation of lighting fixtures & controls. ls under seperate permit | $107,050 |
| Feb 13, 2008 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | elevator replacement at 2nd street serving all floors to roof. addition of roof deck 439 sq ft, new roof (see roof consult dwgs under seperate permit). new store front at 2nd & stanford elevatorsDetails
elevator replacement at 2nd street serving all floors to roof. addition of roof deck 439 sq ft, new roof (see roof consult dwgs under seperate permit). new store front at 2nd & stanford elevators | $1,250,000 |
| Nov 19, 2007 | Completed final sign-off Sep 2008 | 4 Embarcadero Center | Field Construction Inc. | architectural permit #1136279 issued 10/17/2007 ap# 2007-1006-5597 mechanical electrical, plumbing minor revisions to mep to accomidate architectural partitions layout at 20th floor.Details
architectural permit #1136279 issued 10/17/2007 ap# 2007-1006-5597 mechanical electrical, plumbing minor revisions to mep to accomidate architectural partitions layout at 20th floor. | $50,000 |
| Nov 7, 2007 | Never finaled issued Nov 2007, no final | 1 Post St | Lem Construction Inc. | 9th floor-add one heat pump in an equipment closet on 9th floor near south stairs.Details
9th floor-add one heat pump in an equipment closet on 9th floor near south stairs. | $40,000 |
| Aug 9, 2007 | Completed final sign-off Oct 2007 | 4 Embarcadero Center | Bcci Construction Company | 38th floor-mechanical and electrical permit for 38th floor. for adding ac-unitDetails
38th floor-mechanical and electrical permit for 38th floor. for adding ac-unit | $9,000 |
| Aug 9, 2007 | Completed final sign-off Oct 2007 | 1 Embarcadero Center | Bcci Construction Company | 11th floor-mech. and elect. 11th. flr. heat pump.Details
11th floor-mech. and elect. 11th. flr. heat pump. | $9,500 |
| Aug 8, 2007 | Completed final sign-off Feb 2008 | 4 Embarcadero Center | Hathaway Dinwiddie Co. | 7th floor-oti-2, minor modification to an existing fire alarm system to support oti#1 2007-0606-3207 and 2 speakers and 2 strobes work on 7th floor.Details
7th floor-oti-2, minor modification to an existing fire alarm system to support oti#1 2007-0606-3207 and 2 speakers and 2 strobes work on 7th floor. | $1,200 |
| May 16, 2007 | Completed final sign-off Nov 2007 | 2 Embarcadero Center | Gci, Inc | oti-2, 2nd floor, el, meDetails
oti-2, 2nd floor, el, me | $45,000 |
| Mar 14, 2007 | Expired or cancelled expired Jul 2011 | 345 California St | Gci, Inc | oti-2, 4th floor, el, meDetails
oti-2, 4th floor, el, me | $70,000 |
| Dec 20, 2006 | Completed final sign-off May 2007 | 601 Montgomery St | oti-2 (4th fl) el, me: mechanical and electrical work associated with lobby and restoom remodel.Details
oti-2 (4th fl) el, me: mechanical and electrical work associated with lobby and restoom remodel. | $45,000 | |
| Dec 20, 2006 | Completed final sign-off May 2007 | 601 Montgomery St | oti-2, montgomery bldg, 3/fl, el, me.Details
oti-2, montgomery bldg, 3/fl, el, me. | $45,000 | |
| Oct 27, 2006 | Completed final sign-off Jan 2007 | 275 Battery St | Hathaway Dinwiddie Co. | oti-2, 8th floor, el,meDetails
oti-2, 8th floor, el,me | $40,000 |
| Sep 13, 2006 | Completed final sign-off Apr 2007 | 201 Mission St | Cccs, Inc | oti-2, 11th floor, me, ls.Details
oti-2, 11th floor, me, ls. | $60,000 |
| Aug 24, 2006 | Completed final sign-off Mar 2007 | 1 Embarcadero Center | Dpr Construction Inc | oti-2, 40th floor, el, me.Details
oti-2, 40th floor, el, me. | $200,000 |
| Aug 8, 2006 | Expired or cancelled expired Mar 2007 | 101 California St | 11th floor-life safety modifitions at (e) office space. fire alarm system onlyDetails
11th floor-life safety modifitions at (e) office space. fire alarm system only | $6,000 | |
| Jul 6, 2006 | Completed final sign-off Jan 2007 | 2 Embarcadero Center | Dpr Construction Inc | oti-2,11th floor, el, me.Details
oti-2,11th floor, el, me. | $190,000 |
| Feb 15, 2006 | Completed final sign-off Jan 2009 | 60 Spear St | Pribuss Engineering Inc | umbrella permit- sprinkler high rise retrofit ordinance 377-93Details
umbrella permit- sprinkler high rise retrofit ordinance 377-93 | $500 |
| Dec 30, 2004 | Completed final sign-off Feb 2006 | 101 California St | Bcci Construction Company | oti-2 4/f el meDetails
oti-2 4/f el me | $500,000 |
| Nov 22, 2004 | Completed final sign-off Mar 2005 | 101 California St | life safety on 25th floor - work related to pa#200411058644Details
life safety on 25th floor - work related to pa#200411058644 | $2,500 |