From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
27 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 20, 2022 | Completed final sign-off Aug 2022 | 2230 Green St | Christensen Brothers Construction Co. | replace less than 50% current roof deck + railing. all work in kind.Details
replace less than 50% current roof deck + railing. all work in kind. | $14,000 |
| Oct 20, 2021 | Never finaled issued Oct 2021, no final | 2230 Green St | Abstract Windows Inc. | windows: replace (3) (n) wood like for like: retrofit back of house: u- factor not to excedd 0.30 window location: 1- bedroom/ 2-bathroomDetails
windows: replace (3) (n) wood like for like: retrofit back of house: u- factor not to excedd 0.30 window location: 1- bedroom/ 2-bathroom | $3,350 |
| Jun 1, 2021 | Completed final sign-off Jul 2021 | 2230 Green St | Standardconstr/Standardroof | complete tear off of all roofing layers a entire building. new tar and gravel roof and layer fiber glass base sheet. 3 ply # 11lb fiberglass ply sheet, flood coat and gravel 24 gauge heavy duty salvanized steel grip edge flashings. aluminit parapit walls gravel surface. flood coat- 60lbs hot tar/Details
complete tear off of all roofing layers a entire building. new tar and gravel roof and layer fiber glass base sheet. 3 ply # 11lb fiberglass ply sheet, flood coat and gravel 24 gauge heavy duty salvanized steel grip edge flashings. aluminit parapit walls gravel surface. flood coat- 60lbs hot tar/ | |
| Dec 18, 2018 | Never finaled issued Dec 2018, no final | 2230 Green St | street spaceDetails
street space | ||
| Sep 7, 2018 | Never finaled issued Sep 2018, no final | 2230 Green St | street spaceDetails
street space | ||
| Apr 16, 2018 | Never finaled issued Apr 2018, no final | 2230 Green St | street spaceDetails
street space | ||
| Apr 6, 2018 | Completed final sign-off Feb 2019 | 2230 Green St | Thompson Suskind L P | voluntary seismic upgrade of ground floor level. n/a for maher.Details
voluntary seismic upgrade of ground floor level. n/a for maher. | $65,000 |
| Mar 30, 2018 | Completed final sign-off Mar 2019 | 2230 Green St | Altman & Co General Contractors | to obtain final inspection for work approved under pa#2010209280871 & 201306270640. all work is complete.Details
to obtain final inspection for work approved under pa#2010209280871 & 201306270640. all work is complete. | |
| Jun 27, 2013 | Never finaled issued Feb 2014, no final | 2230 Green St | Altman & Co General Contractors | move cripple wall at existing crawlspace 1 foot east to widen garage ramp. compliance with ordinance no.155-13 not required.Details
move cripple wall at existing crawlspace 1 foot east to widen garage ramp. compliance with ordinance no.155-13 not required. | $10,000 |
| Sep 28, 2012 | Never finaled issued Sep 2012, no final | 2230 Green St | Altman & Co General Contractors | remove & replace damaged wood siding on street facade complete re-paint, replace in kindDetails
remove & replace damaged wood siding on street facade complete re-paint, replace in kind | $20,000 |
| Feb 16, 2012 | Completed final sign-off Jun 2012 | 2230 Green St | Altman & Co General Contractors | remove and replace wood damaged wall and ceiling coverings with new sheetrock at 2nd and 3rd flr kitchens; 2nd and 3rd flr stair hallwaysDetails
remove and replace wood damaged wall and ceiling coverings with new sheetrock at 2nd and 3rd flr kitchens; 2nd and 3rd flr stair hallways | $4,000 |
| Feb 14, 2012 | Completed final sign-off Jun 2012 | 2230 Green St | Altman & Co General Contractors | dryrot repair at front entry & 2nd floor landing.Details
dryrot repair at front entry & 2nd floor landing. | $5,000 |
| Jan 10, 2012 | Never finaled issued Jan 2012, no final | 2230 Green St | street space permitDetails
street space permit | ||
| Dec 15, 2011 | Completed final sign-off Jun 2012 | 2230 Green St | Altman & Co General Contractors | revision to appl #201106218640 & #201104013303: slight structural modifications including base plate, bracing, joist connection, header & guardrail changes.Details
revision to appl #201106218640 & #201104013303: slight structural modifications including base plate, bracing, joist connection, header & guardrail changes. | |
| Jul 18, 2011 | Never finaled issued Jul 2011, no final | 2230 Green St | street spaceDetails
street space | ||
| Jun 21, 2011 | Completed final sign-off Jun 2012 | 2230 Green St | Altman & Co General Contractors | replace & widen (only 2nd floor gets wider)rear decks with in kind materials. replace extg floors, walls, stone at main entry with in kind materials. new decorative clg beams at 2nd floor livingroom. new built up roofing system, rebuild extg roof deck with in kind materials to match extg footprint.Details
replace & widen (only 2nd floor gets wider)rear decks with in kind materials. replace extg floors, walls, stone at main entry with in kind materials. new decorative clg beams at 2nd floor livingroom. new built up roofing system, rebuild extg roof deck with in kind materials to match extg footprint. | $3,000 |
| Apr 1, 2011 | Completed final sign-off Jun 2012 | 2230 Green St | Altman & Co General Contractors | replace/widen (only upper 2 get wider) rear decks w/in kind materials. replace (e) floor & wall stone at main entry w/in kind materials. new decorative ceiling beams at 2nd floor living room. new built up roofing system. rebuild (e) roof deck w/in kind materials to match (e) footprintDetails
replace/widen (only upper 2 get wider) rear decks w/in kind materials. replace (e) floor & wall stone at main entry w/in kind materials. new decorative ceiling beams at 2nd floor living room. new built up roofing system. rebuild (e) roof deck w/in kind materials to match (e) footprint | $75,000 |
| Mar 8, 2011 | Completed final sign-off Jun 2012 | 2230 Green St | Altman & Co General Contractors | exploratory to investigate suspected dry rot: remove (e) finishes to expose structural framing of dry rot area for exterior rear decks at all levels. no new construction or removal of (e) structural framing, future replacement of decks will be under separate permit. decks not visible from street.Details
exploratory to investigate suspected dry rot: remove (e) finishes to expose structural framing of dry rot area for exterior rear decks at all levels. no new construction or removal of (e) structural framing, future replacement of decks will be under separate permit. decks not visible from street. | $2,500 |
| Mar 16, 2010 | Completed final sign-off Apr 2010 | 2230 Green St | Forsythe General Contractors | revision to app#200806104082 to show accurate scope of work. change kitchen cabinets in top unit and new appliancesDetails
revision to app#200806104082 to show accurate scope of work. change kitchen cabinets in top unit and new appliances | |
| Mar 12, 2010 | Expired or cancelled cancelled Apr 2010 | 2230 Green St | Forsythe General Contractors | to obtain final inspection for work approved under pa 200806104082; all work is completeDetails
to obtain final inspection for work approved under pa 200806104082; all work is complete | |
| Sep 22, 2008 | Never finaled issued Sep 2008, no final | 2230 Green St | street space only.Details
street space only. | ||
| Jun 10, 2008 | Expired or cancelled cancelled May 2010 | 2230 Green St | Forsythe General Contractors | bath remodel, new shower stall, tileDetails
bath remodel, new shower stall, tile | $10,000 |
| Mar 3, 2004 | Completed final sign-off Apr 2004 | 2230 Green St | Fma Builders | revision to pa 200206269999 & 200211071004, reduce scope of work.Details
revision to pa 200206269999 & 200211071004, reduce scope of work. | |
| Aug 15, 2003 | Never finaled issued Aug 2003, no final | 2230 Green St | street space permitDetails
street space permit | ||
| Feb 4, 2003 | Never finaled issued Feb 2003, no final | 2230 Green St | street spaceDetails
street space | ||
| Nov 7, 2002 | Completed final sign-off Apr 2004 | 2230 Green St | vertical extension-extend existing elevator from top flr to roof provide new penthouse for roofDetails
vertical extension-extend existing elevator from top flr to roof provide new penthouse for roof | $10,000 | |
| Jun 26, 2002 | Completed final sign-off Apr 2004 | 2230 Green St | remodel & renovate existing two unit condominium res. renovation to incl. add an elevator, replacingDetails
remodel & renovate existing two unit condominium res. renovation to incl. add an elevator, replacing | $400,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Altman & Co General Contractors (9), Forsythe General Contractors (3), Abstract Windows Inc., Christensen Brothers Construction Co., Fma Builders, Standardconstr/Standardroof, Thompson Suskind L P
- Architects
- David Sturm
- Engineers
- Kris Johnson (2), Nikica Favretto