Jennifer Weiss
- Listed as
- architect, authorized agent-others
- Firm
- Jennifer Weiss Architecture
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Sep 2022
14 permits since 2000 (architect on 14 permits, authorized agent-others on 1 permit): 9 completed, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 6, 2022 | Completed final sign-off Dec 2023 | 125 Presidio Av | Pete Moffat Construction Inc | interior remodel: relocate (e) entry closet. remove (e) office closet. relocate (e) partition, install two new pocket doors.Details
interior remodel: relocate (e) entry closet. remove (e) office closet. relocate (e) partition, install two new pocket doors. | $25,000 |
| Mar 31, 2022 | Completed final sign-off Dec 2023 | 125 Presidio Av | Pete Moffat Construction Inc | front facade only. water intrusion mitigation. replace in-kind new wood siding, insulated glazed wood windows, metal gate & wood clading.Details
front facade only. water intrusion mitigation. replace in-kind new wood siding, insulated glazed wood windows, metal gate & wood clading. | $40,000 |
| Sep 10, 2021 | Completed final sign-off Dec 2023 | 125 Presidio Av | Pete Moffat Construction Inc | courtyard: replace wood siding due to dryrot. replace (e) wood windows and doors in kink in (e) openings. extend foundation at courtyard walls. repair balcony due to dryrot. exterior passageway: remove 2 doors from garage to ext. passageway. remove stucco from wall and ceiling.Details
courtyard: replace wood siding due to dryrot. replace (e) wood windows and doors in kink in (e) openings. extend foundation at courtyard walls. repair balcony due to dryrot. exterior passageway: remove 2 doors from garage to ext. passageway. remove stucco from wall and ceiling. | $300,000 |
| Jun 29, 2021 | Expired or cancelled withdrawn May 2022 | 601 04th St | Art Of Construction Inc | interior remodel of (e) unit: new kitchen cabinets, counter, appliances, relocate bathroom (new fixtures. demo some (e) cabinets & partiion. some new partitions. new (e) guardrail replacement at light/loft.Details
interior remodel of (e) unit: new kitchen cabinets, counter, appliances, relocate bathroom (new fixtures. demo some (e) cabinets & partiion. some new partitions. new (e) guardrail replacement at light/loft. | $30,000 |
| Jun 9, 2021 | Completed final sign-off Dec 2023 | 125 Presidio Av | Pete Moffat Construction Inc | replace existing garage door with wood sectional door.Details
replace existing garage door with wood sectional door. | $3,000 |
| Feb 4, 2021 | Completed final sign-off Dec 2023 | 125 Presidio Av | Pete Moffat Construction Inc | replace in-kind windows/door at rear of home. repair siding as needed due to water damage. new interior stairs & voluntary seismic upgrade at interior.Details
replace in-kind windows/door at rear of home. repair siding as needed due to water damage. new interior stairs & voluntary seismic upgrade at interior. | $100,000 |
| Dec 14, 2018 | Completed final sign-off Mar 2019 | 590 Spruce St | structural work only - structural strengthening: new rear yard grade beam and cross braging. no interior work on ground floor rooms.Details
structural work only - structural strengthening: new rear yard grade beam and cross braging. no interior work on ground floor rooms. | $10,000 | |
| Apr 11, 2018 | Never finaled filed Apr 2018, never issued | 800 Pacheco St | rear yard addition: enclose area under existing 2nd flr deck. new windows to match existing. remodel existing bathroom. enlarge laundry room. new skylight.Details
rear yard addition: enclose area under existing 2nd flr deck. new windows to match existing. remodel existing bathroom. enlarge laundry room. new skylight. | $97,100 | |
| Mar 3, 2016 | Expired or cancelled cancelled Mar 2017 | 10 Hawthorne St | painted sign.Details
painted sign. | $1,000 | |
| Mar 3, 2016 | Never finaled issued Oct 2016, no final | 10 Hawthorne St | Herrero Builders Incorporated | exterior work only -modify 2nd flr window. remove awnings. replace entry doors. change of occupancy under separate permit#201512084388. exterior lightings under ti permit.Details
exterior work only -modify 2nd flr window. remove awnings. replace entry doors. change of occupancy under separate permit#201512084388. exterior lightings under ti permit. | $5,000 |
| Dec 8, 2015 | Completed final sign-off Aug 2017 | 10 Hawthorne St | Herrero Builders Incorporated | ti to convert vacant space to a gallery, 2 floors & basement. some structure, mep. defered total 10,080 sfDetails
ti to convert vacant space to a gallery, 2 floors & basement. some structure, mep. defered total 10,080 sf | $735,000 |
| Feb 5, 2015 | Completed final sign-off Sep 2018 | 2535 Laguna St | Farallon General Contractors Inc. | new rear yard addition (2 story over basement). window repair/replacement, seismic retrofit/upgrade. relocate some interior partitions, new 1/2 bath, remodel bathrooms and kitchen.Details
new rear yard addition (2 story over basement). window repair/replacement, seismic retrofit/upgrade. relocate some interior partitions, new 1/2 bath, remodel bathrooms and kitchen. | $150,000 |
| Jan 10, 2014 | Never finaled issued Jul 2014, no final | 3700 Washington St | small (115 sq.ft.) addition underneath (e) overhand, expand (e) crawl space, new bathroom, remodel bath, upgrade electrical, new insulating glass windows to match (e), rebuild exterior stair to basement from street level, seismic retrofit upgrade. compliance with oridance no.155-13 required.Details
small (115 sq.ft.) addition underneath (e) overhand, expand (e) crawl space, new bathroom, remodel bath, upgrade electrical, new insulating glass windows to match (e), rebuild exterior stair to basement from street level, seismic retrofit upgrade. compliance with oridance no.155-13 required. | $537,703 | |
| Dec 12, 2013 | Completed final sign-off Nov 2015 | 135 Belgrave Av | Farallon General Contractors Inc. | 1st fl: reconfigure windows @ living rm (north wing). 2nd fl: enclosure of s. deck @ rear to create 2 (n) bedrm; raise floor level at north wing & ceiling height to create a code compliant bedrm. change of roof to create lower flat roof. 2nd fl: extension of floor to create bay window @ north face.Details
1st fl: reconfigure windows @ living rm (north wing). 2nd fl: enclosure of s. deck @ rear to create 2 (n) bedrm; raise floor level at north wing & ceiling height to create a code compliant bedrm. change of roof to create lower flat roof. 2nd fl: extension of floor to create bay window @ north face. | $75,640 |