Block 0173, lot 002
649 Front St
- City’s use
- Commercial Office
- Built
- 1910
- Stories
- 3
- Units
- 2
- Building
- 19,322 sq ft
- Lot
- 5,339 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
38 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 30, 2024 | Completed final sign-off Mar 2025 | 649 Front St | Gci, Inc | 2/f: mechanical and electrical - ref bpa# 202410102713Details
2/f: mechanical and electrical - ref bpa# 202410102713 | $10,000 |
| Dec 10, 2024 | Completed final sign-off Jan 2025 | 649 Front St | Pioneer Fire Inc. | relocate (10) pendents. ref to t.i. 202410102713Details
relocate (10) pendents. ref to t.i. 202410102713 | $4,000 |
| Oct 10, 2024 | Completed final sign-off Mar 2025 | 649 Front St | Gci, Inc | 2/fl-demo and construction of no load bearing partitions for new offices, conference room, break area a server room new ceilings , lighting millwork, and finishes. mep deferred.Details
2/fl-demo and construction of no load bearing partitions for new offices, conference room, break area a server room new ceilings , lighting millwork, and finishes. mep deferred. | $395,000 |
| Mar 21, 2022 | Completed final sign-off Apr 2022 | 649 Front St | C B 2 Builders Incorporated | revision to previously approved permit 202111222919. combine 2 phone rooms to 1 by removing on structural partition. revise hvac duct to reflect change of the areaDetails
revision to previously approved permit 202111222919. combine 2 phone rooms to 1 by removing on structural partition. revise hvac duct to reflect change of the area | $1,000 |
| Mar 14, 2022 | Completed final sign-off Apr 2022 | 649 Front St | Airco Mechanical Inc | hvac duct demolition and cap as necessary. frabricate and install 9 transfer air sleeves through wall and install a wall grille on each side. tap (e) ductwork and run new supply air branches to new rooms as necessary. furnish and install 9 new supply air diffusers, mechanical insulation per title 24Details
hvac duct demolition and cap as necessary. frabricate and install 9 transfer air sleeves through wall and install a wall grille on each side. tap (e) ductwork and run new supply air branches to new rooms as necessary. furnish and install 9 new supply air diffusers, mechanical insulation per title 24 | $31,000 |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 649 Front St | Bay Alarm Company | bay alarm to install a cellular communicator for a fire system.Details
bay alarm to install a cellular communicator for a fire system. | $1,000 |
| Dec 14, 2021 | Completed final sign-off Jan 2022 | 649 Front St | R L H Fire Protection Inc | 1/f: add 3 new fire sprinklers. relocate 9 existing sprinklers. no other work to system. ref ti permit 202111222919.Details
1/f: add 3 new fire sprinklers. relocate 9 existing sprinklers. no other work to system. ref ti permit 202111222919. | $5,000 |
| Nov 22, 2021 | Completed final sign-off Apr 2022 | 649 Front St | non-structural tenant improvement. sow: new partitions. fully sprinklered. interior only. no work in prow. mep, sprinklers, life safety deferred.Details
non-structural tenant improvement. sow: new partitions. fully sprinklered. interior only. no work in prow. mep, sprinklers, life safety deferred. | $400,000 | |
| Mar 15, 2017 | Completed final sign-off Jun 2017 | 649 Front St | Handyman Heroes Inc. | suite 100: install kitchen cabinets, dishwasher, sink, & fridge per office use. n/a for maherDetails
suite 100: install kitchen cabinets, dishwasher, sink, & fridge per office use. n/a for maher | $30,000 |
| Jan 27, 2015 | Completed final sign-off Mar 2015 | 649 Front St | Interstate Restoration California Lp | drywall, paint, small electrical, small plumbing, repair water damaged, replace in kind, no work to floor. n/a ordinance #155-13.Details
drywall, paint, small electrical, small plumbing, repair water damaged, replace in kind, no work to floor. n/a ordinance #155-13. | $40,000 |
| Dec 15, 2014 | Never finaled issued Dec 2014, no final | 649 Front St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Dec 15, 2014 | Never finaled issued Dec 2014, no final | 649 Front St | Allied Restoration Co. Inc. | repair from water damage, drywall paint, approx 2500 s.f. drywall replacement, minor electrical repair. n/a ordinance #155-13Details
repair from water damage, drywall paint, approx 2500 s.f. drywall replacement, minor electrical repair. n/a ordinance #155-13 | $45,000 |
| Jun 2, 2009 | Completed final sign-off Jun 2009 | 649 Front St | Emerald Plbg & Fire Protection | provide as builts for job-fire sprinkler, 8 sprinkler heads totalDetails
provide as builts for job-fire sprinkler, 8 sprinkler heads total | $1,500 |
| Sep 5, 2008 | Completed final sign-off Sep 2008 | 649 Front St | install split heat-pump units (ac units) for basement & ground floor office tenant improvement.Details
install split heat-pump units (ac units) for basement & ground floor office tenant improvement. | $28,000 | |
| Mar 13, 2008 | Completed final sign-off Sep 2008 | 649 Front St | Urban Design & Construction | remove 2 posts, add steel bucket, revise framing detail for rear stair. ref pa#200803054403 and pa# 200712281530.Details
remove 2 posts, add steel bucket, revise framing detail for rear stair. ref pa#200803054403 and pa# 200712281530. | $2,500 |
| Mar 5, 2008 | Completed final sign-off Sep 2008 | 649 Front St | Urban Design & Construction | revision to pa# 2007/12/28/1530 to remodel ex. basement restroom for accessibility, add 3 offices and telecom rm at 1st floor, revise and simplify lighting plans.Details
revision to pa# 2007/12/28/1530 to remodel ex. basement restroom for accessibility, add 3 offices and telecom rm at 1st floor, revise and simplify lighting plans. | $24,000 |
| Mar 3, 2008 | Completed final sign-off Sep 2008 | 649 Front St | Emerald Plbg & Fire Protection | ti to sprinkler system in basement. relocate 8 heads and re-route some 4" mains within basement.Details
ti to sprinkler system in basement. relocate 8 heads and re-route some 4" mains within basement. | $5,000 |
| Dec 28, 2007 | Completed final sign-off Sep 2008 | 649 Front St | Urban Design & Construction | work on bsm &1st fl. upgrade (e) vacant office space install(n)lighting& outlets, relocate stair to bsmnt for exit separation. infill 3 openings in floor,minor partition additions on bsmnt. no change mech.system. sprinkler under separate pa.pa# 2002.08.02.3052 for ada compl.no change to(e)fenest.Details
work on bsm &1st fl. upgrade (e) vacant office space install(n)lighting& outlets, relocate stair to bsmnt for exit separation. infill 3 openings in floor,minor partition additions on bsmnt. no change mech.system. sprinkler under separate pa.pa# 2002.08.02.3052 for ada compl.no change to(e)fenest. | $76,000 |
| Nov 29, 2007 | Completed final sign-off Jan 2008 | 649 Front St | Urban Design & Construction | non-structural demolition in the basement and on first floor, including glazed opening, conduits and pipings.Details
non-structural demolition in the basement and on first floor, including glazed opening, conduits and pipings. | $5,000 |
| Jan 2, 2007 | Completed final sign-off Mar 2007 | 649 Front St | Allied Heating & Air Conditioning | install 2 new roof top package heat pumps and convert to (e) duct work. sd's for each heat pump will be insulated on seperate permit application.Details
install 2 new roof top package heat pumps and convert to (e) duct work. sd's for each heat pump will be insulated on seperate permit application. | $16,480 |
| Oct 6, 2006 | Completed final sign-off Mar 2007 | 649 Front St | Potter Fire Protection | 3rd floor - as-built drawing to reflect changes requested by inspector jjames to permit 200608240360.Details
3rd floor - as-built drawing to reflect changes requested by inspector jjames to permit 200608240360. | |
| Aug 24, 2006 | Completed final sign-off Mar 2007 | 649 Front St | Potter Fire Protection | install 49 new fire sprinklers on 3rd floor only.Details
install 49 new fire sprinklers on 3rd floor only. | $11,000 |
| Aug 4, 2006 | Completed final sign-off Mar 2007 | 649 Front St | oti-1, 3rd floor, el, spDetails
oti-1, 3rd floor, el, sp | $100,000 | |
| Jul 28, 2006 | Never finaled issued Jul 2006, no final | 649 Front St | street space permit onlyDetails
street space permit only | ||
| Dec 7, 2004 | Expired or cancelled expired Jan 2007 | 649 Front St | Bay Alarm Company | provide fire sprinkler monitoring. basement & ground floor.Details
provide fire sprinkler monitoring. basement & ground floor. | $2,900 |
| Sep 24, 2004 | Completed final sign-off Sep 2005 | 649 Front St | Hathaway Dinwiddie Co. | minor revision to approved oti#1 appln #200406257381Details
minor revision to approved oti#1 appln #200406257381 | |
| Sep 14, 2004 | Completed final sign-off Sep 2005 | 649 Front St | Ayoob & Peery Plumbing Co Inc | 32 sprinkler heads on 2nd flr, as built symbol change 4 heads per inspector's requestDetails
32 sprinkler heads on 2nd flr, as built symbol change 4 heads per inspector's request | |
| Sep 13, 2004 | Completed final sign-off Sep 2005 | 649 Front St | Hathaway Dinwiddie Co. | revision to permit app 200404282455-removal of unrefrenced keynote no. 3/a4.0, removal of unrefrenceDetails
revision to permit app 200404282455-removal of unrefrenced keynote no. 3/a4.0, removal of unrefrence | |
| Aug 9, 2004 | Completed final sign-off Sep 2005 | 649 Front St | Hathaway Dinwiddie Co. | 32 sprinkler heads on 2nd fl added for dropped ceiling (e)system.Details
32 sprinkler heads on 2nd fl added for dropped ceiling (e)system. | $8,000 |
| Aug 9, 2004 | Expired or cancelled expired Jan 2007 | 649 Front St | Acco Engineered Systems Inc. Dba Acco En | revised lobby - add (1) new air cooled heat pump revised toilet- reconnection of (e) ductwork. referDetails
revised lobby - add (1) new air cooled heat pump revised toilet- reconnection of (e) ductwork. refer | $65,000 |
| Jul 26, 2004 | Completed final sign-off Sep 2005 | 649 Front St | Hathaway Dinwiddie Co. | oti-2, 2nd /fl-el,me.Details
oti-2, 2nd /fl-el,me. | $60,000 |
| Jul 15, 2004 | Never finaled issued Sep 2004, no final | 649 Front St | Ayoob & Peery Plumbing Co Inc | lobby restroom remodel and retrofit extg fire sprklr system on all floor onlyDetails
lobby restroom remodel and retrofit extg fire sprklr system on all floor only | $28,500 |
| Jul 13, 2004 | Never finaled issued Jul 2004, no final | 649 Front St | street space permitDetails
street space permit | ||
| Jun 25, 2004 | Completed final sign-off Sep 2005 | 649 Front St | Hathaway Dinwiddie Co. | oti-1 2/f el me spDetails
oti-1 2/f el me sp | $470,000 |
| Apr 28, 2004 | Completed final sign-off Sep 2005 | 649 Front St | Hathaway Dinwiddie Co. | rev#200208023052. revised building lobby layout-new entry and ramp location. revised toilet roomDetails
rev#200208023052. revised building lobby layout-new entry and ramp location. revised toilet room | |
| Apr 9, 2004 | Never finaled issued Apr 2004, no final | 649 Front St | street spaceDetails
street space | ||
| Jun 24, 2003 | Never finaled issued Jun 2003, no final | 649 Front St | street spaceDetails
street space | ||
| Aug 2, 2002 | Completed final sign-off Sep 2005 | 649 Front St | umb ordinance to an (e)unreinforced masonry bldgDetails
umb ordinance to an (e)unreinforced masonry bldg | $500,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hathaway Dinwiddie Co. (6), Urban Design & Construction (4), Ayoob & Peery Plumbing Co Inc (2), Emerald Plbg & Fire Protection (2), Gci, Inc (2), Potter Fire Protection (2), Acco Engineered Systems Inc. Dba Acco En, Airco Mechanical Inc, Allied Heating & Air Conditioning, Allied Restoration Co. Inc., Bay Alarm Company, Bay Alarm Company, C B 2 Builders Incorporated, Handyman Heroes Inc., Interstate Restoration California Lp, Pioneer Fire Inc., R L H Fire Protection Inc
- Architects
- David Hecht (2), Jant Crane (2), Theodore Garcia
- Engineers
- Habtom Tewelde, Stephen Chan
- Authorized agent-otherss
- Jonathan Townley
- Designers
- Bay Alarm Company
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.