Back to bathroom remodel contractors
Howard S. Wright Constructors Lp
- Based in
- Emeryville
- On San Francisco permits
- Mar 2007 to Jul 2013
- Last 24 months
- 0 permits filed
92 permits since 2000: 76 completed, 12 never finaled, 4 expired or cancelled.
Of the 12 never-finaled permits, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 38 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2012 | Completed final sign-off Jan 2013 | 345 Stockton St | 34th floor:guest room renovation floor 34, new finishes throughout new millwork, closet doors and shelving, new lighting to replace extg bathroom renovation floor 34. replace tubs, tiles, toilet, vanities, mirrors, lights, doors; replace fan coil unitsDetails
34th floor:guest room renovation floor 34, new finishes throughout new millwork, closet doors and shelving, new lighting to replace extg bathroom renovation floor 34. replace tubs, tiles, toilet, vanities, mirrors, lights, doors; replace fan coil units | $850,000 |
| Mar 16, 2012 | Completed final sign-off Apr 2016 | 360 Post St | interior renovation of 12 story bldg on all floors, including architectural, mechanical, electrical & plumbing, lighting, ceiling system replacement, bathrooms, elevator lobbies & corridors. no ext'r work under this permit. fire protectn under separate permit. primary work is hvac replacement.Details
interior renovation of 12 story bldg on all floors, including architectural, mechanical, electrical & plumbing, lighting, ceiling system replacement, bathrooms, elevator lobbies & corridors. no ext'r work under this permit. fire protectn under separate permit. primary work is hvac replacement. | $11,000,000 |
| Sep 8, 2011 | Completed final sign-off Jan 2013 | 345 Stockton St | 1st. flr. t.i.: reconfig. lobby space including finish upgrades, millwork, lighting clg., mech. & elec. upgrades & improvements, mezz. t.i.: reconfig. flr. to create restaurant bar & small kitchen, (n) unisex bathroom mech., lighting, elec. upgrades. 2nd. flr. t.i.: meeting rms. upgrades to lobby...Details
1st. flr. t.i.: reconfig. lobby space including finish upgrades, millwork, lighting clg., mech. & elec. upgrades & improvements, mezz. t.i.: reconfig. flr. to create restaurant bar & small kitchen, (n) unisex bathroom mech., lighting, elec. upgrades. 2nd. flr. t.i.: meeting rms. upgrades to lobby... | $850,000 |
| Aug 4, 2011 | Completed final sign-off Jan 2012 | 500 Post St | basement level-existing meeting space on lower level remodel. addition of accessible unisex bathroom. no new lightingDetails
basement level-existing meeting space on lower level remodel. addition of accessible unisex bathroom. no new lighting | $128,000 |
| Dec 7, 2009 | Completed final sign-off Jun 2010 | 360 Post St | 5th fl - replacement of existing ceiling & light fixtures and 20% ada bathroom upgrades. (n) t-bar clg.Details
5th fl - replacement of existing ceiling & light fixtures and 20% ada bathroom upgrades. (n) t-bar clg. | $83,000 |
| Dec 4, 2009 | Completed final sign-off Jun 2010 | 360 Post St | 4th floor-replace of (e) ceiling & lights, 20% ada bathroom upgradesDetails
4th floor-replace of (e) ceiling & lights, 20% ada bathroom upgrades | $28,000 |
| Dec 4, 2009 | Completed final sign-off Jun 2010 | 360 Post St | 7th floor-replace of (e) ceiling & lights, 20% ada bathroom upgradesDetails
7th floor-replace of (e) ceiling & lights, 20% ada bathroom upgrades | $47,000 |
| Jun 12, 2009 | Completed final sign-off Jun 2009 | 475 Brannan St | upgrade existing computer room walls to 1-hr. at 3rd. flr. repair/replace bathroom door closers. mep under separate permitDetails
upgrade existing computer room walls to 1-hr. at 3rd. flr. repair/replace bathroom door closers. mep under separate permit | $3,300 |
| May 30, 2008 | Completed final sign-off Jun 2009 | 480 Sutter St | interior remodel of hotel rooms and corridors for floors 21-25. work includes bathroom remodel throughout including n sinks, toilets, finishes, lighting, n carptets finishes, lighting in corridors, throughout ada bathrooms to be upgraded. vending and ice machines relocated. fire sep permDetails
interior remodel of hotel rooms and corridors for floors 21-25. work includes bathroom remodel throughout including n sinks, toilets, finishes, lighting, n carptets finishes, lighting in corridors, throughout ada bathrooms to be upgraded. vending and ice machines relocated. fire sep perm | $1,500,000 |
| Dec 21, 2007 | Completed final sign-off Jan 2013 | 345 Stockton St | guestrooms renovations (floors 3-34) installing (n) finishes,(n) electrical outlets. (n) lighting to replace existing. bathroom renovation & install (n) finishes throughout guestroom corridors. (see attached plans for details & full description of work.Details
guestrooms renovations (floors 3-34) installing (n) finishes,(n) electrical outlets. (n) lighting to replace existing. bathroom renovation & install (n) finishes throughout guestroom corridors. (see attached plans for details & full description of work. | $1,200,000 |