Block 4017, lot 005
575 Florida St
- City’s use
- Industrial
- Built
- 1923
- Building
- 41,500 sq ft
- Lot
- 22,245 sq ft
- Zoning
- M1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 18, 2022 | Never finaled issued Nov 2022, no final | 575 Florida St | H C I Systems Inc | a new common connection bet. 1960 bryant & 575 florida st. both buildings are protected by their own manual and automatic fire alarm system & monitored independently. addressable fire alarm relays from both facp will be installed to released both sets of doors simultaneously.Details
a new common connection bet. 1960 bryant & 575 florida st. both buildings are protected by their own manual and automatic fire alarm system & monitored independently. addressable fire alarm relays from both facp will be installed to released both sets of doors simultaneously. | $8,728 |
| Nov 16, 2022 | Completed final sign-off Jan 2023 | 575 Florida St | Principal Builders Inc. | shift in swing/placentment of commumicating openningg doors bewtween 575 florida & 1960 bryant street as had been previously aproved under pa# 2022-0427-3080Details
shift in swing/placentment of commumicating openningg doors bewtween 575 florida & 1960 bryant street as had been previously aproved under pa# 2022-0427-3080 | $5,000 |
| Jun 6, 2022 | Completed final sign-off Mar 2023 | 575 Florida St | Principal Builders Inc. | 1/f: new exterior canopy at the entry.Details
1/f: new exterior canopy at the entry. | $5,000 |
| Apr 27, 2022 | Completed final sign-off Oct 2022 | 575 Florida St | Principal Builders Inc. | 1st fl t.i.: partial demo of common interior walls as well as connection between building at 575 florida & 1960 bryant includes rated corridor. elevated platform at l2 above the connection to acieve adequate head height for circulation.Details
1st fl t.i.: partial demo of common interior walls as well as connection between building at 575 florida & 1960 bryant includes rated corridor. elevated platform at l2 above the connection to acieve adequate head height for circulation. | $5,000 |
| Mar 29, 2022 | Completed final sign-off Apr 2022 | 575 Florida St | H C I Systems Inc | fire as-build. ref pa# 202106293430Details
fire as-build. ref pa# 202106293430 | |
| Feb 3, 2022 | Completed final sign-off Apr 2022 | 575 Florida St | Principal Builders Inc. | revision to bpa#202110059875 & 202105250928. incorporate steel framing details for 1/f platform.Details
revision to bpa#202110059875 & 202105250928. incorporate steel framing details for 1/f platform. | |
| Jan 18, 2022 | Completed final sign-off Aug 2022 | 575 Florida St | Pribuss Engineering Inc | 1/f: tenant improevent.modifty fire sprinkler head locations to accomdate new ceiling and partition layout for (e) office psace on 1/f. 98 total f/s heads. ref t.i.202105250928.Details
1/f: tenant improevent.modifty fire sprinkler head locations to accomdate new ceiling and partition layout for (e) office psace on 1/f. 98 total f/s heads. ref t.i.202105250928. | $50,372 |
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 575 Florida St | Pribuss Engineering Inc | as-built to pa202109148366; add 4 pendents under drop ceiling on 4th floor; total fire sprinklers changed to 31.Details
as-built to pa202109148366; add 4 pendents under drop ceiling on 4th floor; total fire sprinklers changed to 31. | |
| Oct 5, 2021 | Completed final sign-off Apr 2022 | 575 Florida St | Principal Builders Inc. | structural demo and arch. infill of an exterior wall at level 1, a new 3 stop ada lift and an elevated platform at level 2.Details
structural demo and arch. infill of an exterior wall at level 1, a new 3 stop ada lift and an elevated platform at level 2. | $50,000 |
| Sep 28, 2021 | Completed final sign-off Jul 2022 | 575 Florida St | Principal Builders Inc. | revision to approved app# 202104088173. demo and replace extg boiler with 2 condensing boilers. install new vfds to serve the extg hot water pumps.Details
revision to approved app# 202104088173. demo and replace extg boiler with 2 condensing boilers. install new vfds to serve the extg hot water pumps. | |
| Sep 14, 2021 | Completed final sign-off Mar 2022 | 575 Florida St | Pribuss Engineering Inc | 4/f: modify (e) sprinkler head locations to accommodate new ceiling and partition layout for (e) office space on 4/f. 27 total heads. ref. t.i. pa202104067948. including standpipe.Details
4/f: modify (e) sprinkler head locations to accommodate new ceiling and partition layout for (e) office space on 4/f. 27 total heads. ref. t.i. pa202104067948. including standpipe. | $13,878 |
| Aug 26, 2021 | Completed final sign-off Mar 2022 | 575 Florida St | Pribuss Engineering Inc | modify sprinkler head locations to accommodate new ceiling and partition layout for extg office space on floor 3. total sprinklers in project: 72Details
modify sprinkler head locations to accommodate new ceiling and partition layout for extg office space on floor 3. total sprinklers in project: 72 | $37,008 |
| Aug 11, 2021 | Completed final sign-off Mar 2022 | 575 Florida St | Pribuss Engineering Inc | modify sprinkler head locations to accomodate new ceiling and partition layout for extg office space. 575 florida st . total sprinklers in project 83Details
modify sprinkler head locations to accomodate new ceiling and partition layout for extg office space. 575 florida st . total sprinklers in project 83 | $42,662 |
| Jun 29, 2021 | Completed final sign-off Apr 2022 | 575 Florida St | H C I Systems Inc | install new booster power supply inside electrical rooms on all floors. notification throughout path of travel/common areas, low frequency horns inside nap rooms, elevator recall, damper shutdown, sprinkler monitoring, etc.Details
install new booster power supply inside electrical rooms on all floors. notification throughout path of travel/common areas, low frequency horns inside nap rooms, elevator recall, damper shutdown, sprinkler monitoring, etc. | $54,266 |
| May 25, 2021 | Completed final sign-off Aug 2022 | 575 Florida St | Principal Builders Inc. | tenant improvement at level 1 and p1; work also includes a change of occupancy for assembly space, non-egress communicating stair from level 1 to level 4, and the build out of library at level 2 and 3.Details
tenant improvement at level 1 and p1; work also includes a change of occupancy for assembly space, non-egress communicating stair from level 1 to level 4, and the build out of library at level 2 and 3. | $2,760,000 |
| Apr 8, 2021 | Completed final sign-off Jul 2022 | 575 Florida St | Principal Builders Inc. | 2/f: tenant improvement includes new interior partitions, finishes, and equipment. ref pa 202009265042, 202009265046.Details
2/f: tenant improvement includes new interior partitions, finishes, and equipment. ref pa 202009265042, 202009265046. | $2,760,000 |
| Apr 7, 2021 | Completed final sign-off Jul 2022 | 575 Florida St | Principal Builders Inc. | 3/f: tenant improvement includes new interior partitions, finishes, and equipment. ref pa 202009265042, 202009265046 & 202104068011 for assiocated permit atrium.Details
3/f: tenant improvement includes new interior partitions, finishes, and equipment. ref pa 202009265042, 202009265046 & 202104068011 for assiocated permit atrium. | $2,750,000 |
| Apr 6, 2021 | Completed final sign-off Apr 2022 | 575 Florida St | Principal Builders Inc. | revision to previously approved permit 202009265042. work includes partial wall removal and 2 hr rated shaft enclosure. (n) shotcrete wall & (n) boiler.Details
revision to previously approved permit 202009265042. work includes partial wall removal and 2 hr rated shaft enclosure. (n) shotcrete wall & (n) boiler. | |
| Apr 6, 2021 | Completed final sign-off Jul 2022 | 575 Florida St | Principal Builders Inc. | 4/f: tenant improvement includes new interior partitions, finishes, and equipment. ref pa 202009265042, 202009265046.Details
4/f: tenant improvement includes new interior partitions, finishes, and equipment. ref pa 202009265042, 202009265046. | $1,150,000 |
| Sep 26, 2020 | Completed final sign-off May 2021 | 575 Florida St | Principal Builders Inc. | interior non-structural demo. work includes removal of fixtures, finishes, millwork, etcDetails
interior non-structural demo. work includes removal of fixtures, finishes, millwork, etc | $95,000 |
| Sep 26, 2020 | Completed final sign-off Apr 2022 | 575 Florida St | Principal Builders Inc. | interior structural demo. new openings in the exist concrete floors at levels 2,3 and 4 to be enclosed w/ rated shaft walls.Details
interior structural demo. new openings in the exist concrete floors at levels 2,3 and 4 to be enclosed w/ rated shaft walls. | $125,000 |
| Nov 1, 2019 | Completed final sign-off Dec 2019 | 575 Florida St | Integrity Air Systems Corporation | replace 2 rooftop air conditioners like for like, new units to set on (e) structural frame, new units are approx 500 lbs, lighter than (e) unitsDetails
replace 2 rooftop air conditioners like for like, new units to set on (e) structural frame, new units are approx 500 lbs, lighter than (e) units | $60,000 |
| Jul 15, 2019 | Completed final sign-off Sep 2019 | 575 Florida St | 575 florida street aka 2828 18th street (4017/005): to obtain a final inspection for work approved under pa#9916250. all work is complete.Details
575 florida street aka 2828 18th street (4017/005): to obtain a final inspection for work approved under pa#9916250. all work is complete. | ||
| Nov 19, 2018 | Completed final sign-off Dec 2018 | 555 Florida St | Ayoob & Peery Plumbing Co Inc | 1st fl; add (6), relocate (8), and plug (2) sprinklers to conform with the new wall/ceiling layout of the t.i.Details
1st fl; add (6), relocate (8), and plug (2) sprinklers to conform with the new wall/ceiling layout of the t.i. | $4,950 |
| Nov 15, 2018 | Completed final sign-off Mar 2019 | 555 Florida St | Fire & Security & Alarm Co/ F.S.A.C. | new notification devices will be installed and tie-in to (e) notification circuit & (e) panel located in the lobby ref 201809241214. n/a for maher.Details
new notification devices will be installed and tie-in to (e) notification circuit & (e) panel located in the lobby ref 201809241214. n/a for maher. | $3,000 |
| Jun 22, 2018 | Never finaled issued Jun 2018, no final | 575 Florida St | street spaceDetails
street space | ||
| Jun 18, 2015 | Expired or cancelled cancelled Feb 2024 | 1900 Bryant St | remove and replace (11) existing antenas with (11 replacement antennas. install: 9 pipe mounth, 9a2 back packs, reroute 2 cables, install diplexers. n/a for maher.Details
remove and replace (11) existing antenas with (11 replacement antennas. install: 9 pipe mounth, 9a2 back packs, reroute 2 cables, install diplexers. n/a for maher. | $10,000 | |
| Oct 23, 2013 | Completed final sign-off Dec 2015 | 1900 Bryant St | Quality Telecom Consultants | remove & replace 6 panel antennas. install 12 remove radio units, 4 surge protection, remove 6 cables & replace with 4 cables, install 1 gps & replace 1 (e) lte cabinet with 1 new cabinet. verizon wirelss site.Details
remove & replace 6 panel antennas. install 12 remove radio units, 4 surge protection, remove 6 cables & replace with 4 cables, install 1 gps & replace 1 (e) lte cabinet with 1 new cabinet. verizon wirelss site. | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Principal Builders Inc. (13), Pribuss Engineering Inc (5), H C I Systems Inc (3), Ayoob & Peery Plumbing Co Inc, Fire & Security & Alarm Co/ F.S.A.C., Integrity Air Systems Corporation, Quality Telecom Consultants
- Architects
- Christopher Hall (5), Brian Collins-Friedrichs (3), Christopher Hall (3), Manuel Tsihlas (2)
- Engineers
- Stephen Shafeer (3), Vanessa O'connor (3), Marc Andrew Steyer (2), Carlo Biscocho
- Authorized agent-otherss
- Lovella Torres (2)
- Designers
- Hany Dimitry Curtis Wayne Vance
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.