Block 0147, lot 005
1301 Stockton St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 3
- Units
- 18
- Rooms
- 17 bathrooms
- Building
- 13,782 sq ft
- Lot
- 4,744 sq ft
- Zoning
- CCB
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
36 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2021 | Completed final sign-off Jul 2021 | 1301 Stockton St | Aura Fire Safety Inc | replace existing fire sprinkler system with pendent sprinkler heads for the new ceiling. uprights refer to approved building plans # 2019-1220-0173Details
replace existing fire sprinkler system with pendent sprinkler heads for the new ceiling. uprights refer to approved building plans # 2019-1220-0173 | $16,850 |
| Apr 12, 2021 | Completed final sign-off Aug 2021 | 1301 Stockton St | Signtech Electrical Advertising Inc. | install 1 non-illuminated single-faced address sign for an existing "east west bank".Details
install 1 non-illuminated single-faced address sign for an existing "east west bank". | $1,000 |
| Apr 12, 2021 | Completed final sign-off Aug 2021 | 1301 Stockton St | Signtech Electrical Advertising Inc. | install one awning frame with material for existing "east west bank", no signage is proposed on awning.Details
install one awning frame with material for existing "east west bank", no signage is proposed on awning. | $3,000 |
| Apr 12, 2021 | Completed final sign-off Aug 2021 | 1301 Stockton St | Signtech Electrical Advertising Inc. | install 2 door vinyl signs for existing "east west bank".Details
install 2 door vinyl signs for existing "east west bank". | $1,000 |
| Nov 3, 2020 | Completed final sign-off Apr 2021 | 1301 Stockton St | Bai Construction | revision to pa #201809140258 - relocate new steel columns and ada bathroomDetails
revision to pa #201809140258 - relocate new steel columns and ada bathroom | |
| Aug 13, 2020 | Completed final sign-off Apr 2021 | 1301 Stockton St | Bai Construction | at broadway sidewalk, repair and strengthening extg access to basement. replace glass block with new concrete. at stockton sidewalk remove access to basement and provide new structural slab at openingDetails
at broadway sidewalk, repair and strengthening extg access to basement. replace glass block with new concrete. at stockton sidewalk remove access to basement and provide new structural slab at opening | $15,000 |
| Jul 21, 2020 | Never finaled issued Jul 2020, no final | 1301 Stockton St | street space | ||
| Jul 13, 2020 | Completed final sign-off Oct 2020 | 1301 Stockton St | Bai Construction | additional structural details for soft story retrofit under construction (issued permit #2018-0914-0258).Details
additional structural details for soft story retrofit under construction (issued permit #2018-0914-0258). | $8,000 |
| Jun 2, 2020 | Completed final sign-off Aug 2021 | 1301 Stockton St | Signtech Electrical Advertising Inc. | install 2 illuminated wall signs for existing "east west bank".Details
install 2 illuminated wall signs for existing "east west bank". | $9,000 |
| May 22, 2020 | Never finaled issued May 2020, no final | 1301 Stockton St | street space | ||
| Mar 3, 2020 | Completed final sign-off Oct 2020 | 1301 Stockton St | Bai Construction | replace (e) footing with new concrete footing in the 1st fl and repair wood stair in the basement levelDetails
replace (e) footing with new concrete footing in the 1st fl and repair wood stair in the basement level | $45,000 |
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 1301 Stockton St | street space | ||
| Dec 20, 2019 | Completed final sign-off Nov 2021 | 1301 Stockton St | Wilson Delang Construction Group | ti for retail bank: new office, teller counter, bank vault, & new exterior bank entrance. minor facade modificationDetails
ti for retail bank: new office, teller counter, bank vault, & new exterior bank entrance. minor facade modification | $1,000,000 |
| Nov 21, 2019 | Completed final sign-off Oct 2020 | 1301 Stockton St | Bai Construction | portion of (e) wood floor framing over electrical basement space to be removed & replaced w (n) light weight concrete fill over metal deck. hss steel members will be used to span over (e) opening & bear directly on (e) below grade brick walls. portion of (e) wood floor framing to be removed/ replaceDetails
portion of (e) wood floor framing over electrical basement space to be removed & replaced w (n) light weight concrete fill over metal deck. hss steel members will be used to span over (e) opening & bear directly on (e) below grade brick walls. portion of (e) wood floor framing to be removed/ replace | $70,000 |
| Jun 17, 2019 | Expired or cancelled cancelled Jan 2026 | 1301 Stockton St | alteration to store front at street level of stockton st elevationDetails
alteration to store front at street level of stockton st elevation | $50,000 | |
| Sep 14, 2018 | Completed final sign-off Apr 2021 | 1301 Stockton St | Bai Construction | (residential) soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
(residential) soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $80,000 |
| Sep 14, 2018 | Completed final sign-off Apr 2021 | 1301 Stockton St | Bai Construction | (commercial) soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4.Details
(commercial) soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. | $40,000 |
| May 16, 2016 | Never finaled issued May 2016, no final | 700 Broadway | street space | ||
| Dec 18, 2015 | Never finaled issued Dec 2015, no final | 1301 Stockton St | street space | ||
| Sep 30, 2014 | Never finaled issued Sep 2014, no final | 700 Broadway | street space | ||
| Jul 10, 2013 | Never finaled issued Jul 2013, no final | 700 Broadway | to comply with ordinance 029-13 only: installation of grab bars in sro at the following locations: 1 men's bathroom, 1 woman's bathroom and 1 shower room.Details
to comply with ordinance 029-13 only: installation of grab bars in sro at the following locations: 1 men's bathroom, 1 woman's bathroom and 1 shower room. | $1,479 | |
| Jul 28, 2011 | Never finaled issued Jul 2011, no final | 700 Broadway | Griffin Molinari Building Construction | replace tile floor in shower room, repair rotten subfloor @ 2nd floor level.Details
replace tile floor in shower room, repair rotten subfloor @ 2nd floor level. | $7,200 |
| Mar 12, 2010 | Completed final sign-off May 2010 | 1301 Stockton St | Golden Gate Sign Company Inc. | copy change to existing awning (east west bank).Details
copy change to existing awning (east west bank). | $5,000 |
| May 9, 2008 | Never finaled issued May 2008, no final | 1317 Stockton St | street space permit only. | ||
| Nov 20, 2007 | Completed final sign-off Aug 2008 | 1317 Stockton St | Behnam And Associates | revision to app # 200403057880/ for new foundation at front of building due to unforseen field conditions.Details
revision to app # 200403057880/ for new foundation at front of building due to unforseen field conditions. | $5,001 |
| Sep 5, 2007 | Never finaled issued Sep 2007, no final | 1317 Stockton St | street space | ||
| Sep 5, 2007 | Completed final sign-off Aug 2008 | 1317 Stockton St | Behnam And Associates | to renew 200403157880Details
to renew 200403157880 | $15,000 |
| Jul 26, 2004 | Completed final sign-off Dec 2004 | 1301 Stockton St | relocate (e) entrance door, enclose entry areaDetails
relocate (e) entrance door, enclose entry area | $15,000 | |
| Mar 5, 2004 | Expired or cancelled expired Oct 2008 | 1317 Stockton St | Behnam And Associates | basement water damaged beams, columns and floor under sidewalk to be repaired.Details
basement water damaged beams, columns and floor under sidewalk to be repaired. | $14,000 |
| Nov 18, 2003 | Never finaled issued Nov 2003, no final | 1301 Stockton St | street space | ||
| Oct 10, 2003 | Never finaled issued Oct 2003, no final | 700 Broadway | voluntary ada compliance front door onlyDetails
voluntary ada compliance front door only | $8,900 | |
| Jun 17, 2003 | Never finaled issued Jun 2003, no final | 1301 Stockton St | Philip Advertising | install @ store front awning | $4,000 |
| Jun 17, 2003 | Never finaled issued Jun 2003, no final | 1301 Stockton St | Philip Advertising | paint white letters (signs) on both of awning faceDetails
paint white letters (signs) on both of awning face | |
| May 19, 2003 | Completed final sign-off Mar 2004 | 1301 Stockton St | renovation of bank retail space & atm areaDetails
renovation of bank retail space & atm area | $10,800 | |
| Mar 15, 2002 | Completed final sign-off Jun 2002 | 700 Broadway | A B C Window Contractors | install 2 non rated commercial grade alum. casement in kind,into extng frames,no structural changes,Details
install 2 non rated commercial grade alum. casement in kind,into extng frames,no structural changes, | $2,600 |
| Oct 12, 2001 | Expired or cancelled expired Apr 2002 | 1301 Stockton St | barrier removal/bthrooms/coupon booth/teller counter, etcDetails
barrier removal/bthrooms/coupon booth/teller counter, etc | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bai Construction (7), Signtech Electrical Advertising Inc. (4), Behnam And Associates (3), Philip Advertising (2), A B C Window Contractors, Aura Fire Safety Inc, Golden Gate Sign Company Inc., Griffin Molinari Building Construction, Wilson Delang Construction Group
- Architects
- Darren Wong, Limahelu Frank Hendrik
- Engineers
- Darren Wong (3), Marc Andrew Steyer (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.