Griffin Molinari Building Construction
- Based in
- Napa
- On San Francisco permits
- Jul 2011 to Jul 2011
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2011 | Never finaled issued Jul 2011, no final | 700 Broadway | replace tile floor in shower room, repair rotten subfloor @ 2nd floor level.Details
replace tile floor in shower room, repair rotten subfloor @ 2nd floor level. | $7,200 |
| Jul 28, 2011 | Expired or cancelled expired Oct 2012 | 716 Broadway | repair sub floor in the bathroom, replace bath tub and vanity, new light fixture.Details
repair sub floor in the bathroom, replace bath tub and vanity, new light fixture. | $22,400 |