Alvarado & Son Construction Inc
- Based in
- El Sobrante
- On San Francisco permits
- Jan 2021 to May 2026
- Last 24 months
- 1 permit filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2026 | In progress issued Nov 2026 | 349 Howth St | demo (e) stair from master bed on main lvl.(n) studio adu below (e) master bed.all electrical appliances.slab on grd foundation-(n) minislit sys & elec w/h.(n) 200a main.(n)staircase access for 2nd story over adu state program.Details
demo (e) stair from master bed on main lvl.(n) studio adu below (e) master bed.all electrical appliances.slab on grd foundation-(n) minislit sys & elec w/h.(n) 200a main.(n)staircase access for 2nd story over adu state program. | $200,000 |
| Jul 18, 2024 | In progress issued Oct 2024 | 22 Gennessee St | demolish portions of g/f and 2/f. construct new small closet addition at 2/f entry. interior work includes new walls, doors, windows. relocate stairway, new kitchen, upgrade bathrooms, add new skylights. install new hvac and water heater. expand g/f primary suite.Details
demolish portions of g/f and 2/f. construct new small closet addition at 2/f entry. interior work includes new walls, doors, windows. relocate stairway, new kitchen, upgrade bathrooms, add new skylights. install new hvac and water heater. expand g/f primary suite. | $267,350 |
| Jul 28, 2021 | Completed final sign-off Mar 2022 | 1225 Van Dyke Av | replace cinder block fence for a metal fence, facing street n/a maherDetails
replace cinder block fence for a metal fence, facing street n/a maher | $12,000 |
| Feb 3, 2021 | Completed final sign-off Apr 2021 | 56 Forest View Dr | repair with tributary less than 15% of the total building area consisting of supplemental floor beam and post with new spread footing.Details
repair with tributary less than 15% of the total building area consisting of supplemental floor beam and post with new spread footing. | $6,000 |
| Jan 13, 2021 | Completed final sign-off Apr 2021 | 444 22nd Av | replace 4 - 8'l x 5'h windows at front of building, repair dryrot. will be wood interior exterior aluminum clad within existing opening.Details
replace 4 - 8'l x 5'h windows at front of building, repair dryrot. will be wood interior exterior aluminum clad within existing opening. | $9,000 |