Daniel N. Manheim
- License
- S2973
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S2973 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Ccsf-Dpw
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Jul 2018
5 permits since 2000 (engineer on 4 permits, architect on 1 permit): 3 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- D.F.P.F Corp Dba Fine Line Construction, Grand Industries Inc, Rodi Construction Inc
- Architects
- Aaron Hyland, Edward Chin
- Engineers
- Eric L. Bura, Raymond Joseph Keane, Steven B. Brown
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 26, 2018 | Completed final sign-off Nov 2020 | 801 Shields St | renovate playground, clubhouse restrooms, repave sports courts, new fencing, lightingDetails
renovate playground, clubhouse restrooms, repave sports courts, new fencing, lighting | $850,000 | |
| Jan 24, 2018 | Completed final sign-off Aug 2018 | 3333 Broderick St | Rodi Construction Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher. garage level onlyDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher. garage level only | $150,000 |
| Mar 1, 2016 | Completed final sign-off Jan 2017 | 430 Turk St | D.F.P.F Corp Dba Fine Line Construction | revision ot pa# 201504173911 in order to clarify the full scope of accessibility improvemts, required (mod). rad program submittal, structural improvements on 9th flr,moderization of units kitchen,bathroom,floor finishes, re-configursation for accessiblility(5units) sprinklers under seperate permit,Details
revision ot pa# 201504173911 in order to clarify the full scope of accessibility improvemts, required (mod). rad program submittal, structural improvements on 9th flr,moderization of units kitchen,bathroom,floor finishes, re-configursation for accessiblility(5units) sprinklers under seperate permit, | |
| Apr 9, 2012 | Expired or cancelled cancelled Jan 2020 | 100 John F. Kennedy Dr | Grand Industries Inc | to erect 1 story, special events building. | $50,000 |
| Apr 3, 2007 | Never finaled issued Apr 2007, no final | 1409 Mckinnon Av | (aimco case #scn-02-404010) voluntary foundation repair at damaged foundation 1/20 of (e) foundation area.Details
(aimco case #scn-02-404010) voluntary foundation repair at damaged foundation 1/20 of (e) foundation area. | $10,000 |