Block 5843, lot 007
510 Alemany Blvd
- City’s use
- Multi-Family Residential
- Built
- 1956
- Units
- 150
- Building
- 137,652 sq ft
- Lot
- 209,998 sq ft
- Zoning
- RM1
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
43 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2025 | Completed final sign-off Jun 2025 | 815 Ellsworth St | install water remediation equipment (dryers and dehumidifiers) remove base, flooring and 2' bottom sheetrock and insulation. install flooring, insulation, sheetrock and paint unit.Details
install water remediation equipment (dryers and dehumidifiers) remove base, flooring and 2' bottom sheetrock and insulation. install flooring, insulation, sheetrock and paint unit. | $14,000 | |
| May 6, 2019 | Never finaled issued May 2019, no final | 560 Alemany Bl | Fire Detection Unlimited | record drawing submital to permit 201904026904 n/a maherDetails
record drawing submital to permit 201904026904 n/a maher | |
| Apr 2, 2019 | Completed final sign-off Jun 2019 | 560 Alemany Bl | Fire Detection Unlimited | commencement of work not started under previously approved permit. application pa#201703091053, permit expired 3/4/18 on job card.Details
commencement of work not started under previously approved permit. application pa#201703091053, permit expired 3/4/18 on job card. | $22,700 |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 801 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 26: moh rad priority permit #201809241179 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 26: moh rad priority permit #201809241179 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 817 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 25: moh rad priority permit #201809241174 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 25: moh rad priority permit #201809241174 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 861 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 22: moh rad priority permit #201809241175 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 22: moh rad priority permit #201809241175 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 845 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 23: moh rad priority permit #20189241173 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 23: moh rad priority permit #20189241173 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 935 Ellsworth St | street spaceDetails
street space | ||
| Nov 27, 2018 | Never finaled issued Dec 2018, no final | 500 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | moh rad priority mod permits (20160218) 9895, 9894, 9892, 9891, 9879, 9881, 9880, 9897, 9896, 9893, 9890, 9878, 9871, rev to approved permits (repeat) to clarity full scope of accessibility by the mayors office of disability in the enforcement of 2010 ada standards & the calif bldg codesDetails
moh rad priority mod permits (20160218) 9895, 9894, 9892, 9891, 9879, 9881, 9880, 9897, 9896, 9893, 9890, 9878, 9871, rev to approved permits (repeat) to clarity full scope of accessibility by the mayors office of disability in the enforcement of 2010 ada standards & the calif bldg codes | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 548 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | bldg 14 - moh rad priority mod permit per 2016-0218-9879 revision to approver permit 2016-0218-9879 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 14 - moh rad priority mod permit per 2016-0218-9879 revision to approver permit 2016-0218-9879 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 845 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | moh rad priority-mod permit per permit 201602189897 rev to approved permit 201602189897 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbcDetails
moh rad priority-mod permit per permit 201602189897 rev to approved permit 201602189897 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbc | |
| Sep 24, 2018 | Never finaled issued Oct 2018, no final | 512 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | revision to pa 201602189894 mohrad. building 20, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189894 mohrad. building 20, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 861 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | moh rad priority-mod permit per permit 201602189896 rev to approved permit 201602189896 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbcDetails
moh rad priority-mod permit per permit 201602189896 rev to approved permit 201602189896 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbc | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 536 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | bldg 16 - moh rad priority mod permit per 2016-0218-9891 revision to approver permit 2016-0218-9891 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 16 - moh rad priority mod permit per 2016-0218-9891 revision to approver permit 2016-0218-9891 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 817 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | moh rad priority-mod permit per permit 201602189880 rev to approved permit 2011602189880 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbcDetails
moh rad priority-mod permit per permit 201602189880 rev to approved permit 2011602189880 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbc | |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 925 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 15 - moh rad priority mod permit per 2016-0218-9890 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 15 - moh rad priority mod permit per 2016-0218-9890 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 500 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | moh rad priority-mod permit per permit 201602189895 rev to approved permit 201602189895 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbcDetails
moh rad priority-mod permit per permit 201602189895 rev to approved permit 201602189895 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbc | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 901 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | revision to pa 201602189893 mohrad. building 19, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189893 mohrad. building 19, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 957 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | revision to pa 201602189871 mohrad. building 11, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189871 mohrad. building 11, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 801 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 26 - moh rad priority mod permit per 2016-0218-9881 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 26 - moh rad priority mod permit per 2016-0218-9881 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 524 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | revision to pa 201602189892 mohrad. building 17, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189892 mohrad. building 17, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 945 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 12 moh rad priority mod permit per 2016-0218-9878 revision to approver permit 2016-0218-9878 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 12 moh rad priority mod permit per 2016-0218-9878 revision to approver permit 2016-0218-9878 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Aug 16, 2018 | Completed final sign-off Jul 2019 | 989 Ellsworth St | Tony Ng Plumbing Co | as built for bldg 9, ref bpa# 2016-0316-2239, sheet fp-10 ref plan set 201602189885-s5. added 24 attic sprinklers due to structural partitions caught in field. maher naDetails
as built for bldg 9, ref bpa# 2016-0316-2239, sheet fp-10 ref plan set 201602189885-s5. added 24 attic sprinklers due to structural partitions caught in field. maher na | |
| May 12, 2017 | Never finaled issued May 2017, no final | 937 Ellsworth St | street spaceDetails
street space | ||
| Mar 9, 2017 | Never finaled issued Mar 2017, no final | 560 Alemany Bl | Fire Detection Unlimited | install new fire alarm system. new a/v devices in common areas, addressable monitoring module for fire sprinkler devices. full area coverage for monitoring and control of supply fans and fspd. remote annunciaton and pull station in approved location. system shall be in 100% approves metalDetails
install new fire alarm system. new a/v devices in common areas, addressable monitoring module for fire sprinkler devices. full area coverage for monitoring and control of supply fans and fspd. remote annunciaton and pull station in approved location. system shall be in 100% approves metal | $22,700 |
| Nov 8, 2016 | Never finaled issued Nov 2016, no final | 937 Ellsworth St | street spaceDetails
street space | ||
| Mar 16, 2016 | Never finaled issued Aug 2016, no final | 560 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad priority processing. demolish 2 story, type 5-b, 6 dwelling unit building. deffered til issuance,approved by director.Details
rad priority processing. demolish 2 story, type 5-b, 6 dwelling unit building. deffered til issuance,approved by director. | $102,505 |
| Mar 16, 2016 | Completed final sign-off Aug 2019 | 989 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad priority processing. erect 1 story, 4-dwelling, no basement, type v-b. deferred til issuance of addenda #1,approved by director.Details
rad priority processing. erect 1 story, 4-dwelling, no basement, type v-b. deferred til issuance of addenda #1,approved by director. | $1,768,000 |
| Mar 16, 2016 | Completed final sign-off Sep 2019 | 560 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad priority processing.erect 1 story, no basement, type v-b, community, office bldg. deferred til issuance of addenda #1,approved by director.Details
rad priority processing.erect 1 story, no basement, type v-b, community, office bldg. deferred til issuance of addenda #1,approved by director. | $2,409,000 |
| Mar 16, 2016 | Completed final sign-off Aug 2019 | 989 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad priority processing. demolish 2 story, type 5-b, 6 dwelling unit building. deffered til issuance,approved by director.Details
rad priority processing. demolish 2 story, type 5-b, 6 dwelling unit building. deffered til issuance,approved by director. | $102,505 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 512 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 20, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 20, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 536 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 16, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 16, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 861 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 22, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors.Details
rad. bldg 22, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 945 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 12, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 12, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 524 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 17, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 17, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 548 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 14, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 14, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 901 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 19, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 19, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 500 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 21, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 21, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 957 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 11, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 11, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 845 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 23, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors.Details
rad. bldg 23, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 925 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 15, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinish hardwood floors, enlarging concrete stoops. new office layouts. change community room to maintenance room. new sprinkler system.Details
rad. bldg 15, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinish hardwood floors, enlarging concrete stoops. new office layouts. change community room to maintenance room. new sprinkler system. | $1,982,000 |
| Apr 25, 2007 | Never finaled issued Apr 2007, no final | 845 Ellsworth St | exterior balcony stair improvements. replace in kind wood trim and stair treads. shares plans with 900 ellsworth street.Details
exterior balcony stair improvements. replace in kind wood trim and stair treads. shares plans with 900 ellsworth street. | $2,000 | |
| Apr 25, 2007 | Never finaled issued Apr 2007, no final | 861 Ellsworth St | exterior balcony stair improvements. replace in kind wood trim & treads. shares plans with 900 ellsworth st.Details
exterior balcony stair improvements. replace in kind wood trim & treads. shares plans with 900 ellsworth st. | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D.F.P.F Corp Dba Fine Line Construction (33), Fire Detection Unlimited (3), Tony Ng Plumbing Co
- Architects
- Karl Smith (21), Mauricio Melchor (10), Henry Kwong (2)
- Engineers
- Daniel Manhelm (15), Meng Hsiu Chen (15)
- Authorized agent-otherss
- James D. Fagler (9), Mauricio Melchor (4)
Find contractors for work like this