Block 5714, lot 001
100 Appleton Ave
- City’s use
- Multi-Family Residential
- Built
- 1940
- Stories
- 2
- Units
- 118
- Building
- 79,852 sq ft
- Lot
- 115,651 sq ft
- Zoning
- RM1
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
47 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 24, 2017 | Completed final sign-off May 2019 | 100 Appleton Av | D.F.P.F Corp Dba Fine Line Construction | replacement of 5 playstructure equipment in common areas and addition of concrete paving. new plantingDetails
replacement of 5 playstructure equipment in common areas and addition of concrete paving. new planting | $175,000 |
| Dec 5, 2016 | Never finaled issued Dec 2016, no final | 100 Appleton Av | street spaceDetails
street space | ||
| Nov 3, 2016 | Never finaled issued Jun 2017, no final | 100 Appleton Av | street spaceDetails
street space | ||
| Jun 14, 2016 | Never finaled issued Jun 2016, no final | 100 Appleton Av | street space permitDetails
street space permit | ||
| May 4, 2016 | Completed final sign-off Dec 2016 | 181 Highland Av | D.F.P.F Corp Dba Fine Line Construction | revision to 2015 0402 2634 to document accessibility features bldg f 181-199 & 199a highland ave; includes 183a, 185a 725, 727 holly park cirDetails
revision to 2015 0402 2634 to document accessibility features bldg f 181-199 & 199a highland ave; includes 183a, 185a 725, 727 holly park cir | |
| May 4, 2016 | Completed final sign-off Sep 2017 | 137 Highland Av | D.F.P.F Corp Dba Fine Line Construction | revision to 2015 0402 2637 to document accessibility features bldg i 137-153 highlands; includes 137a, 145a, 147aDetails
revision to 2015 0402 2637 to document accessibility features bldg i 137-153 highlands; includes 137a, 145a, 147a | |
| May 4, 2016 | Completed final sign-off Sep 2017 | 45 Patton St | D.F.P.F Corp Dba Fine Line Construction | revision to 2015 0402 2638 to document accessibility features bldg j 45, 51, 57, 63, 69, 75, 83, 85 patton st 129, 129a, 131, 133 highlandDetails
revision to 2015 0402 2638 to document accessibility features bldg j 45, 51, 57, 63, 69, 75, 83, 85 patton st 129, 129a, 131, 133 highland | |
| May 4, 2016 | Completed final sign-off Jan 2017 | 136 Appleton Av | D.F.P.F Corp Dba Fine Line Construction | revision to 2015 0402 2640 to document accessibility features bldg c 136, 138, 140, 142, 144, 146, 148, 150, 152, 154 appleton aveDetails
revision to 2015 0402 2640 to document accessibility features bldg c 136, 138, 140, 142, 144, 146, 148, 150, 152, 154 appleton ave | |
| May 4, 2016 | Completed final sign-off Feb 2017 | 3 Patton St | D.F.P.F Corp Dba Fine Line Construction | revision to 2015 0402 2626 to document accessibility features 1,3, 9,15,21,27,33,39 - patton st 102, 104, 106, 108, 110 appleton aveDetails
revision to 2015 0402 2626 to document accessibility features 1,3, 9,15,21,27,33,39 - patton st 102, 104, 106, 108, 110 appleton ave | |
| May 4, 2016 | Completed final sign-off Feb 2017 | 112 Appleton Av | D.F.P.F Corp Dba Fine Line Construction | revision to 2015 0402 2639 to document accessibility features bldg b 112, 114, 116, 118, 120, 122, 124, 126, 128, 130, 132, 134 appleton aveDetails
revision to 2015 0402 2639 to document accessibility features bldg b 112, 114, 116, 118, 120, 122, 124, 126, 128, 130, 132, 134 appleton ave | |
| May 4, 2016 | Completed final sign-off Dec 2016 | 169 Highland Av | D.F.P.F Corp Dba Fine Line Construction | revision to 2015 0402 2635 to document accessibility features bldg g 169-179 highland ave; includes 169a, 171a, 1763aDetails
revision to 2015 0402 2635 to document accessibility features bldg g 169-179 highland ave; includes 169a, 171a, 1763a | |
| May 4, 2016 | Never finaled issued May 2016, no final | 156 Appleton Av | D.F.P.F Corp Dba Fine Line Construction | revision to 2015 0402 2641 to document accessibility features bldg d 156, 158, 160, 162, 164, 166, 168, 170, 172 appletonDetails
revision to 2015 0402 2641 to document accessibility features bldg d 156, 158, 160, 162, 164, 166, 168, 170, 172 appleton | |
| May 4, 2016 | Never finaled issued May 2016, no final | 174 Appleton Av | D.F.P.F Corp Dba Fine Line Construction | revision to 2015 0402 2642 to document accessibility features bldg e 174, 176, 178, 180, 182, 184, 186, 188, 190, 192, 194, 196, 198 appleton 717 & 719 holly park cirDetails
revision to 2015 0402 2642 to document accessibility features bldg e 174, 176, 178, 180, 182, 184, 186, 188, 190, 192, 194, 196, 198 appleton 717 & 719 holly park cir | |
| May 4, 2016 | Completed final sign-off Jan 2017 | 155 Highland Av | D.F.P.F Corp Dba Fine Line Construction | revision to 2015 0402 2636 to document accessibility features bldg h 155-167 highland; includes 155a, 159a, 161aDetails
revision to 2015 0402 2636 to document accessibility features bldg h 155-167 highland; includes 155a, 159a, 161a | |
| Dec 30, 2015 | Never finaled issued Dec 2015, no final | 190 Appleton Av | street spaceDetails
street space | ||
| Dec 21, 2015 | Never finaled issued Dec 2015, no final | 181 Highland Av | street space permitDetails
street space permit | ||
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 100 Appleton Av | street spaceDetails
street space | ||
| Nov 18, 2015 | Never finaled issued Nov 2015, no final | 190 Appleton Av | street spaceDetails
street space | ||
| Apr 2, 2015 | Completed final sign-off Sep 2017 | 156 Appleton Av | D.F.P.F Corp Dba Fine Line Construction | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Completed final sign-off Sep 2017 | 174 Appleton Av | D.F.P.F Corp Dba Fine Line Construction | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 169 Highland Av | D.F.P.F Corp Dba Fine Line Construction | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 155 Highland Av | D.F.P.F Corp Dba Fine Line Construction | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 112 Appleton Av | D.F.P.F Corp Dba Fine Line Construction | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 137 Highland Av | D.F.P.F Corp Dba Fine Line Construction | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 45 Patton St | D.F.P.F Corp Dba Fine Line Construction | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 1 Patton St | D.F.P.F Corp Dba Fine Line Construction | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 183 Highland Av | D.F.P.F Corp Dba Fine Line Construction | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 136 Appleton Av | D.F.P.F Corp Dba Fine Line Construction | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Aug 3, 2012 | Never finaled issued Aug 2012, no final | 1 Patton St | street spaceDetails
street space | ||
| May 24, 2012 | Completed final sign-off Oct 2012 | 1 Patton St | Anvil Builders Inc | remove & dispose exist heating units w/assoc flue pipe & thermostat, paint&patch wall to match existing. furnish & install new wall mounted heating units, flue pipe, extend gas pipe line to new units.Details
remove & dispose exist heating units w/assoc flue pipe & thermostat, paint&patch wall to match existing. furnish & install new wall mounted heating units, flue pipe, extend gas pipe line to new units. | $682,000 |
| May 23, 2012 | Never finaled issued May 2012, no final | 45 Patton St | additional address for block 5714, lot 001. 45, 51, 57, 63, 69 patton ave.Details
additional address for block 5714, lot 001. 45, 51, 57, 63, 69 patton ave. | ||
| May 23, 2012 | Never finaled issued May 2012, no final | 75 Patton St | additional addresses 75, 83 & 85 patton street for block 5714, lot 001.Details
additional addresses 75, 83 & 85 patton street for block 5714, lot 001. | ||
| May 23, 2012 | Never finaled issued May 2012, no final | 15 Patton St | additional address for block 5714, lot 001. 15, 21, 27, 33, 39 patton ave.Details
additional address for block 5714, lot 001. 15, 21, 27, 33, 39 patton ave. | ||
| May 23, 2012 | Never finaled issued May 2012, no final | 171 Highland Av | additional address for block 5714, lot 001. 171a, 173a, 183, 183a, 185 highland ave.Details
additional address for block 5714, lot 001. 171a, 173a, 183, 183a, 185 highland ave. | ||
| May 23, 2012 | Never finaled issued May 2012, no final | 137 Highland Av | additional addresses 137-a, 145-a, 155-a 159-a & 169-a highland avenue for block 5714, lot 001.Details
additional addresses 137-a, 145-a, 155-a 159-a & 169-a highland avenue for block 5714, lot 001. | ||
| May 23, 2012 | Never finaled issued May 2012, no final | 114 Appleton Av | additional address for block 5714, lot 001. 114, 116, 118, 120, 122 appleton ave.Details
additional address for block 5714, lot 001. 114, 116, 118, 120, 122 appleton ave. | ||
| May 23, 2012 | Never finaled issued May 2012, no final | 195 Highland Av | additional addresses 195, 197 199-a highland avenue & 3, 9 patton street for block 5714, lot 001.Details
additional addresses 195, 197 199-a highland avenue & 3, 9 patton street for block 5714, lot 001. | ||
| May 23, 2012 | Never finaled issued May 2012, no final | 124 Appleton Av | additional address for block 5714, lot 001. 124, 126, 128, 130, 132 appleton ave.Details
additional address for block 5714, lot 001. 124, 126, 128, 130, 132 appleton ave. | ||
| May 23, 2012 | Never finaled issued May 2012, no final | 102 Appleton Av | additional address for block 5714, lot 001. 102, 104, 106, 108, 110 appleton ave.Details
additional address for block 5714, lot 001. 102, 104, 106, 108, 110 appleton ave. | ||
| May 23, 2012 | Never finaled issued May 2012, no final | 134 Appleton Av | additional address for block 5714, lot 001. 134 appleton ave. 129a, 131, 133, 135 highland ave.Details
additional address for block 5714, lot 001. 134 appleton ave. 129a, 131, 133, 135 highland ave. | ||
| May 23, 2012 | Never finaled issued May 2012, no final | 185 Highland Av | additional address for block 5714, lot 001. 185a, 187, 189, 191, 193 highland ave.Details
additional address for block 5714, lot 001. 185a, 187, 189, 191, 193 highland ave. | ||
| Jan 27, 2012 | Completed final sign-off Feb 2013 | 167 Highland Av | Anvil Builders Inc | windows replacement throughtout complex of 10 building on all sides, approx 600 + windows.Details
windows replacement throughtout complex of 10 building on all sides, approx 600 + windows. | $714,075 |
| Jun 10, 2010 | Never finaled issued Jun 2010, no final | 112 Appleton Av | street spaceDetails
street space | ||
| Apr 7, 2010 | Never finaled issued Apr 2010, no final | 129 Highland Av | street space permitDetails
street space permit | ||
| May 23, 2003 | Expired or cancelled cancelled Mar 2006 | 129 Highland Av | C D X Builders | this project is to infill the (e) depressed concrete slab in the commnunity room w/ a new concreteDetails
this project is to infill the (e) depressed concrete slab in the commnunity room w/ a new concrete | $4,000 |
| Apr 3, 2003 | Expired or cancelled expired Jan 2005 | 129 Highland Av | C D X Builders | revise permit applic. #2002/12/02/2513 door width from 3'-0" to 2' - 10"Details
revise permit applic. #2002/12/02/2513 door width from 3'-0" to 2' - 10" | |
| Dec 2, 2002 | Expired or cancelled expired Jan 2005 | 129 Highland Av | C D X Builders | provide ada compliance & remodel office spaceDetails
provide ada compliance & remodel office space | $64,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D.F.P.F Corp Dba Fine Line Construction (21), C D X Builders (3), Anvil Builders Inc (2)
- Architects
- Lisa Gelfand (10), Mauricio Melchor (10), Matthew Inadomi, Robert Tanaka, Shaen Evan Alexander
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.