Back to kitchen remodel contractors
Amone Corp
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Sep 2026
- Last 24 months
- 31 permits filed
279 permits since 2000: 232 completed, 12 in progress, 22 never finaled, 13 expired or cancelled.
Of the 22 never-finaled permits, 1 is 3 to 5 years old, 9 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
32 kitchen remodel permits: 29 completed, 1 never finaled, 2 expired or cancelled. Typically 20 days from filing to permit and 329 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2024 | Completed final sign-off Apr 2024 | 1040 Fillmore St | unit 501 only: replacement of (1) kitchen cabinets and plumbing fixtures. (2) bathroom fixtures in kind, same locations.Details
unit 501 only: replacement of (1) kitchen cabinets and plumbing fixtures. (2) bathroom fixtures in kind, same locations. | $40,000 |
| Dec 21, 2022 | Completed final sign-off Dec 2023 | 937 Clay St | scope of work include conversion of sro unit 223, 323, and 425 to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust,Details
scope of work include conversion of sro unit 223, 323, and 425 to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust, | $120,000 |
| Sep 30, 2022 | Completed final sign-off Feb 2025 | 2820 16th St | new t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac.Details
new t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac. | $264,600 |
| Aug 29, 2022 | Completed final sign-off Dec 2024 | 683 Florida St | g/f: creating a multi-purpose space with a recording studio, dance rehearsal space, a kitchen and maker's space on ground floor of the base building. signage design will be under separate permit shown here for reference only.Details
g/f: creating a multi-purpose space with a recording studio, dance rehearsal space, a kitchen and maker's space on ground floor of the base building. signage design will be under separate permit shown here for reference only. | $1,750,000 |
| Aug 15, 2022 | Completed final sign-off Dec 2022 | 615 Grant Av | office space t.i, new finishes, doors, walls, provide accessible sink & counter @ 4th fl. breakroom & 3rd fl. server room. kitchenette for employee self-use only. no outside catering will be provided.Details
office space t.i, new finishes, doors, walls, provide accessible sink & counter @ 4th fl. breakroom & 3rd fl. server room. kitchenette for employee self-use only. no outside catering will be provided. | $178,000 |
| Jun 14, 2022 | Completed final sign-off Jan 2024 | 1590 Broadway | replace (e) kitchen and counter top in 21 acessible units to meet hud requirements . interior onlyDetails
replace (e) kitchen and counter top in 21 acessible units to meet hud requirements . interior only | $168,000 |
| Dec 29, 2021 | Completed final sign-off Mar 2024 | 1005 Powell St | common space improvements include replacement or repair of finishes, fixtures, equipment and mep upgrades at community kitchens, bathrooms and corridors of the 4 sro residential levels of 1005 powell. 1 of the bathrooms will be made semi-accessible at each level. doors at the bathrooms and ktchensDetails
common space improvements include replacement or repair of finishes, fixtures, equipment and mep upgrades at community kitchens, bathrooms and corridors of the 4 sro residential levels of 1005 powell. 1 of the bathrooms will be made semi-accessible at each level. doors at the bathrooms and ktchens | $475,000 |
| Sep 30, 2021 | Completed final sign-off Nov 2023 | 937 Clay St | add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferredDetails
add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferred | $400,000 |
| Jul 9, 2021 | Completed final sign-off Sep 2023 | 363 Noe St | 21 public housing apt w/ 1 resident mgr office. rehab & accesibility @ community space w/ kitchenette,toilet rms & launtry room. replaced windows & exterior doors troughout, (n) roofing, boilers, finishes,fixtures & appliances.(n)mep fixtures+equipmt.minor elevator modernize.addit "b" for office.Details
21 public housing apt w/ 1 resident mgr office. rehab & accesibility @ community space w/ kitchenette,toilet rms & launtry room. replaced windows & exterior doors troughout, (n) roofing, boilers, finishes,fixtures & appliances.(n)mep fixtures+equipmt.minor elevator modernize.addit "b" for office. | $5,000,000 |
| Feb 4, 2021 | Completed final sign-off Dec 2021 | 804 Clement St | four bathrooms & two kitchen remodel, paint & flooring, new lighting. in-kind replacement. layout to remain the same. (work in residential units only).Details
four bathrooms & two kitchen remodel, paint & flooring, new lighting. in-kind replacement. layout to remain the same. (work in residential units only). | $50,000 |
| Nov 3, 2020 | Completed final sign-off Oct 2022 | 900 Jackson St | rehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing.Details
rehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing. | $1,500,000 |
| Dec 17, 2019 | Completed final sign-off Jun 2021 | 3198 24th St | interior improvement of e gr fl tenant space for existing donut cafe. scope to include new lighting, finishes, throughout. new kitchen equipment, e unisex restroom to remain, no additional sq footage addedDetails
interior improvement of e gr fl tenant space for existing donut cafe. scope to include new lighting, finishes, throughout. new kitchen equipment, e unisex restroom to remain, no additional sq footage added | $30,000 |
| Mar 19, 2019 | Completed final sign-off Jun 2021 | 1045 Capp St | accessibility improvements, unit kitchen upgrades, window replacement (like kind, same size), light fixture replacement, exterior paint, bathroom ventilation and heating system upgrades. n/a maherDetails
accessibility improvements, unit kitchen upgrades, window replacement (like kind, same size), light fixture replacement, exterior paint, bathroom ventilation and heating system upgrades. n/a maher | $1,500,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2020 | 3190 24th St | to comply w/ 201571452. exterior siding repairs, roof work, window replacement in kind, interior paint & watch patching, flooring replacement, electrical system upgrades, plumbing repairs, fire alarm system, bathroom improvements, kitchen improvements and accessibility upgradesDetails
to comply w/ 201571452. exterior siding repairs, roof work, window replacement in kind, interior paint & watch patching, flooring replacement, electrical system upgrades, plumbing repairs, fire alarm system, bathroom improvements, kitchen improvements and accessibility upgrades | $600,000 |
| Jan 9, 2019 | Completed final sign-off Oct 2019 | 3353 26th St | building exterior repair & maintenace; building interior, common areas replacement & repair, electrical system upgrade, ada communication in unit (#2), units 1-10: bathroom & kitchen flooring, kitchen cabinets & countertops, hot water heater, int paint, direct vent hood, kitchen improvements,Details
building exterior repair & maintenace; building interior, common areas replacement & repair, electrical system upgrade, ada communication in unit (#2), units 1-10: bathroom & kitchen flooring, kitchen cabinets & countertops, hot water heater, int paint, direct vent hood, kitchen improvements, | $161,298 |
| Jun 8, 2018 | Completed final sign-off Nov 2018 | 271 Richland Av | rev pa# 201712206974; unit 271 c: interior remodel of kitchen and bathrom to comply with mod ada accessibilityDetails
rev pa# 201712206974; unit 271 c: interior remodel of kitchen and bathrom to comply with mod ada accessibility | $25,000 |
| May 18, 2018 | Completed final sign-off May 2018 | 3802 Mission St | close existing opening between kitchen and living room in 2 unitsDetails
close existing opening between kitchen and living room in 2 units | $2,000 |
| Feb 13, 2018 | Completed final sign-off Aug 2018 | 269 Richland Av | replace kitchen casework and bathroom fixtures in 4 units, plumbing repair, replace flooring upgrade electrical system, mod comm unit in 271a, replace 1 water heater in 271a on separate permits, repair exterior stairs. replace (e) 9 front windows with alulminum wood clad windows & single hungDetails
replace kitchen casework and bathroom fixtures in 4 units, plumbing repair, replace flooring upgrade electrical system, mod comm unit in 271a, replace 1 water heater in 271a on separate permits, repair exterior stairs. replace (e) 9 front windows with alulminum wood clad windows & single hung | $72,000 |
| Dec 20, 2017 | Completed final sign-off Nov 2018 | 271 Richland Av | rear building, replace 9 windows with wood, siding repair at rear building. reroofing & siding. elec & plumb upgrades. remodel kitchen & bath in 271b & 271c. grab bars in #271c. 1 water heater. structural work on permit #201708255934.Details
rear building, replace 9 windows with wood, siding repair at rear building. reroofing & siding. elec & plumb upgrades. remodel kitchen & bath in 271b & 271c. grab bars in #271c. 1 water heater. structural work on permit #201708255934. | $60,000 |
| Oct 30, 2017 | Never finaled issued Oct 2017, no final | 3331 20th St | interior demo of (e) bathroomms, kitchen fixtures only and sub floor for exploratory ground floor only. future work under sep. permit #2017-09-13-8072.Details
interior demo of (e) bathroomms, kitchen fixtures only and sub floor for exploratory ground floor only. future work under sep. permit #2017-09-13-8072. | $5,000 |
| Sep 13, 2017 | Completed final sign-off Apr 2018 | 1015 Shotwell St | #1,2,5,6- electrical upgrade. #6- kitchen remodel & mod grab bars. roof maintenance, new 75 gallon water heater. n/a ordinance #155-13Details
#1,2,5,6- electrical upgrade. #6- kitchen remodel & mod grab bars. roof maintenance, new 75 gallon water heater. n/a ordinance #155-13 | $60,000 |
| Sep 13, 2017 | Completed final sign-off Feb 2019 | 3331 20th St | like for like @front true divided lites 4 over 4 sigle hung, window r & r 10 windows kitchen countertop & cabinets, replacement in # 1,2,3,4 mod grab bars in bathrooms units 1,2,3,4 structural work on pa#201708255930Details
like for like @front true divided lites 4 over 4 sigle hung, window r & r 10 windows kitchen countertop & cabinets, replacement in # 1,2,3,4 mod grab bars in bathrooms units 1,2,3,4 structural work on pa#201708255930 | $80,000 |
| May 3, 2017 | Completed final sign-off Feb 2019 | 1533 Franklin St | demo of non structural partitions, doors, suspend ceilings, counters, benches, plumbing fix, light fix, carpet and kitchen exhaust hood.Details
demo of non structural partitions, doors, suspend ceilings, counters, benches, plumbing fix, light fix, carpet and kitchen exhaust hood. | $30,000 |
| Dec 22, 2016 | Completed final sign-off Oct 2018 | 420 Eddy St | modification to existing basement space to provide ancillary residential dining room, warming kitchen, restroom, rated stair/exit passageway and corridor enclosure. arch, mech, ele, plumbing. fire sprinkler modifications.Details
modification to existing basement space to provide ancillary residential dining room, warming kitchen, restroom, rated stair/exit passageway and corridor enclosure. arch, mech, ele, plumbing. fire sprinkler modifications. | $80,000 |
| Feb 12, 2015 | Completed final sign-off Jun 2020 | 534 Natoma St | remodel ground floor to be an additional unit. reconstruct existing rear yard stair in new configuration . minor facade & upper level dwelling unit renovations. in new unit there will be full kitchen & bath. interim control.Details
remodel ground floor to be an additional unit. reconstruct existing rear yard stair in new configuration . minor facade & upper level dwelling unit renovations. in new unit there will be full kitchen & bath. interim control. | $320,000 |
| Sep 5, 2014 | Completed final sign-off Feb 2015 | 1739 47th Av | kitchen remodel. remove wall between kitchen and dining. enlarge opening at living room.Details
kitchen remodel. remove wall between kitchen and dining. enlarge opening at living room. | $15,000 |
| Feb 9, 2012 | Completed final sign-off Aug 2012 | 1825 Mission St | revision to 201007086182 for disabled accessible dimensions and clearances at units 112, 113, 114's bathrooms and kitchensDetails
revision to 201007086182 for disabled accessible dimensions and clearances at units 112, 113, 114's bathrooms and kitchens | |
| Feb 28, 2011 | Completed final sign-off Oct 2011 | 391 Leavenworth St | tenderloin neighborhood development corporation (tndc).ground floor office ti incl. new offices, restoom, study and common living, new laundry rm at 2nd fl and limited improvements to communicate kitchen, shower rooms and toilet rooms at 2nd, 3rd and 4th fl residential records.Details
tenderloin neighborhood development corporation (tndc).ground floor office ti incl. new offices, restoom, study and common living, new laundry rm at 2nd fl and limited improvements to communicate kitchen, shower rooms and toilet rooms at 2nd, 3rd and 4th fl residential records. | $225,000 |
| Sep 29, 2006 | Completed final sign-off Oct 2006 | 484 Oak St | remove (e) skylight and close up roof in kitchen at rear 1 story portion of house, not visible from streetDetails
remove (e) skylight and close up roof in kitchen at rear 1 story portion of house, not visible from street | $2,600 |
| Jul 12, 2006 | Completed final sign-off Nov 2006 | 1383 Church St | kitchen remodel -cabinets, counter, floor, appliances, paint, tile.Details
kitchen remodel -cabinets, counter, floor, appliances, paint, tile. | $20,000 |
| May 26, 2006 | Expired or cancelled expired Dec 2010 | 119 Holly Park Cr | revision to pa#200510175689. reduction in scope of work. no rear fence/no kitchen remodel.Details
revision to pa#200510175689. reduction in scope of work. no rear fence/no kitchen remodel. | |
| May 16, 2002 | Expired or cancelled expired Sep 2003 | 1776 Sutter St | accessibility upgrades to full compliance,complete both men's & women's restrooms, comm kitchen andDetails
accessibility upgrades to full compliance,complete both men's & women's restrooms, comm kitchen and |