Block 6570, lot 001
3353 26th St
- City’s use
- Multi-Family Residential
- Built
- 1914
- Stories
- 3
- Units
- 11
- Rooms
- 8 bedrooms, 10 bathrooms
- Building
- 6,912 sq ft
- Lot
- 2,112 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 16, 2025 | In progress filed May 2025, not yet issued | 3353 26th St | Luzon Construction Mgmt | placement of evacation plans on each floor of buildingDetails
placement of evacation plans on each floor of building | |
| May 21, 2019 | Never finaled issued May 2019, no final | 3353 26th St | steeet space and metered parking onlyDetails
steeet space and metered parking only | ||
| Apr 24, 2019 | Completed final sign-off Oct 2019 | 3353 26th St | Crime Watch Security Sys Llc | upgrade (e) fire alarm system to comply with sffc section 1103.7.6 and include sprinkler monitoring. ref pa# 201901099917Details
upgrade (e) fire alarm system to comply with sffc section 1103.7.6 and include sprinkler monitoring. ref pa# 201901099917 | $18,000 |
| Mar 15, 2019 | Never finaled issued Mar 2019, no final | 3353 26th St | street spaceDetails
street space | ||
| Feb 5, 2019 | Completed final sign-off Feb 2019 | 3353 26th St | Gateway Roofing And Water Proofing Inc | reroofing.Details
reroofing. | $35,000 |
| Jan 9, 2019 | Completed final sign-off Oct 2019 | 3353 26th St | Amone Corp | building exterior repair & maintenace; building interior, common areas replacement & repair, electrical system upgrade, ada communication in unit (#2), units 1-10: bathroom & kitchen flooring, kitchen cabinets & countertops, hot water heater, int paint, direct vent hood, kitchen improvements,Details
building exterior repair & maintenace; building interior, common areas replacement & repair, electrical system upgrade, ada communication in unit (#2), units 1-10: bathroom & kitchen flooring, kitchen cabinets & countertops, hot water heater, int paint, direct vent hood, kitchen improvements, | $161,298 |
| Oct 24, 2017 | Completed final sign-off Nov 2017 | 3353 26th St | mandatory soft story retrofit commercial ada upgrades, per bpa #201601142098Details
mandatory soft story retrofit commercial ada upgrades, per bpa #201601142098 | $11,000 | |
| Sep 13, 2017 | Completed final sign-off Nov 2017 | 3353 26th St | rev. to pa201601147098:omit shear walls on 2/f per plans for non-target floor.Details
rev. to pa201601147098:omit shear walls on 2/f per plans for non-target floor. | ||
| May 9, 2017 | Never finaled issued May 2017, no final | 3353 26th St | street spaceDetails
street space | ||
| Jan 14, 2016 | Completed final sign-off Nov 2017 | 3353 26th St | soft story retrofit per sfbc chapter 324b engineering criteria per 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 324b engineering criteria per 2012 iebc appendix a-4 | $20,000 | |
| Jul 27, 2009 | Never finaled issued Jul 2009, no final | 1106 Capp St | street spaceDetails
street space | ||
| Jun 23, 2009 | Never finaled issued Jun 2009, no final | 1106 Capp St | Innovative Windows | remove 55 wood windows in the front of the building and install 55 new wood windows remove 21 wood windows in the back of the building and install 21 new wood windows no size or shape changeDetails
remove 55 wood windows in the front of the building and install 55 new wood windows remove 21 wood windows in the back of the building and install 21 new wood windows no size or shape change | $30,000 |
| Jun 1, 2009 | Never finaled issued Jun 2009, no final | 1106 Capp St | street space only.Details
street space only. | ||
| Jul 2, 2003 | Completed final sign-off Feb 2004 | 3353 26th St | structural repair of portion of (e) sidewalk above (e) sub-sidewalk. install (n) conc. topping & slaDetails
structural repair of portion of (e) sidewalk above (e) sub-sidewalk. install (n) conc. topping & sla | $30,000 | |
| Oct 19, 2001 | Completed final sign-off Apr 2002 | 1106 Capp St | rear stair repair replace dry rot at landing less than 50% of structureDetails
rear stair repair replace dry rot at landing less than 50% of structure | $500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Amone Corp, Crime Watch Security Sys Llc, Gateway Roofing And Water Proofing Inc, Innovative Windows, Luzon Construction Mgmt
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.