Amone Corp
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Sep 2026
- Last 24 months
- 32 permits filed
280 permits since 2000: 232 completed, 13 in progress, 22 never finaled, 13 expired or cancelled.
Of the 22 never-finaled permits, 1 is 3 to 5 years old, 9 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 27 completed, 1 never finaled, 1 expired or cancelled. Typically 9 days from filing to permit and 300 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | second and third floor plan common bathroom ( room 205 & 303) revision to reflect existing conditions correctly as requestd by field inspector. revision to bpa#2024-0419-0348Details
second and third floor plan common bathroom ( room 205 & 303) revision to reflect existing conditions correctly as requestd by field inspector. revision to bpa#2024-0419-0348 | |
| Jan 5, 2024 | Completed final sign-off Apr 2024 | 1040 Fillmore St | unit 501 only: replacement of (1) kitchen cabinets and plumbing fixtures. (2) bathroom fixtures in kind, same locations.Details
unit 501 only: replacement of (1) kitchen cabinets and plumbing fixtures. (2) bathroom fixtures in kind, same locations. | $40,000 |
| Dec 29, 2021 | Completed final sign-off Mar 2024 | 1005 Powell St | common space improvements include replacement or repair of finishes, fixtures, equipment and mep upgrades at community kitchens, bathrooms and corridors of the 4 sro residential levels of 1005 powell. 1 of the bathrooms will be made semi-accessible at each level. doors at the bathrooms and ktchensDetails
common space improvements include replacement or repair of finishes, fixtures, equipment and mep upgrades at community kitchens, bathrooms and corridors of the 4 sro residential levels of 1005 powell. 1 of the bathrooms will be made semi-accessible at each level. doors at the bathrooms and ktchens | $475,000 |
| Nov 9, 2021 | Completed final sign-off Oct 2023 | 255 Shotwell St | revision to pa# 202009103857. revised shared restroom. shared bathroom between tenant spaces deleted, new single stall restroom for tenant a only. expanded storage sq. ft.Details
revision to pa# 202009103857. revised shared restroom. shared bathroom between tenant spaces deleted, new single stall restroom for tenant a only. expanded storage sq. ft. | |
| Nov 5, 2021 | Completed final sign-off Oct 2022 | 1201 Powell St | res'l units not in scope. provide a new accessible all gender restrm to comm'l retail space on gr fl; new all gender restrm includes (n) door, frameand hardware, (n) paint, flooring, toilet, lavatory, bath accessories, efficient lighting, gfci rated outlets. (n) storage shelving. no addition and noDetails
res'l units not in scope. provide a new accessible all gender restrm to comm'l retail space on gr fl; new all gender restrm includes (n) door, frameand hardware, (n) paint, flooring, toilet, lavatory, bath accessories, efficient lighting, gfci rated outlets. (n) storage shelving. no addition and no | $20,000 |
| Feb 4, 2021 | Completed final sign-off Dec 2021 | 804 Clement St | four bathrooms & two kitchen remodel, paint & flooring, new lighting. in-kind replacement. layout to remain the same. (work in residential units only).Details
four bathrooms & two kitchen remodel, paint & flooring, new lighting. in-kind replacement. layout to remain the same. (work in residential units only). | $50,000 |
| Nov 3, 2020 | Completed final sign-off Oct 2022 | 900 Jackson St | rehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing.Details
rehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing. | $1,500,000 |
| Jan 30, 2020 | Completed final sign-off May 2022 | 2200 Van Ness Av | change of use to office. accessory office t.i. demo bathrooms provide new walls, doors, windows, bathrooms and ada entranceDetails
change of use to office. accessory office t.i. demo bathrooms provide new walls, doors, windows, bathrooms and ada entrance | $1,150,000 |
| Sep 3, 2019 | Completed final sign-off Mar 2020 | 1340 Golden Gate Av | revision to pa# 201804176578: staff accessible bathroom moved to 2nd floor because it will require lee work than chnaging thr prevousluy approved permit bathroom location; which at the lovation of the elevator eqpt room. the door newar entry stairs moved to comply with ada handrail ext. reqt.Details
revision to pa# 201804176578: staff accessible bathroom moved to 2nd floor because it will require lee work than chnaging thr prevousluy approved permit bathroom location; which at the lovation of the elevator eqpt room. the door newar entry stairs moved to comply with ada handrail ext. reqt. | |
| Aug 23, 2019 | Completed final sign-off Jun 2021 | 1045 Capp St | revision to app#201903195694. new 24" high wood decking, 4' high wood fence, new metal awning and changing 6 bath tubs to 6 roll in showers in units.Details
revision to app#201903195694. new 24" high wood decking, 4' high wood fence, new metal awning and changing 6 bath tubs to 6 roll in showers in units. | $50,000 |
| Jul 17, 2019 | Completed final sign-off Oct 2019 | 520 Shrader St | exploratory demo - (2) ground floor bathrooms at unit 1 and 2. 2 sqft max at each location, 3 demo areas per bathroom. patch and replace in kind.Details
exploratory demo - (2) ground floor bathrooms at unit 1 and 2. 2 sqft max at each location, 3 demo areas per bathroom. patch and replace in kind. | $1,000 |
| Mar 19, 2019 | Completed final sign-off Jun 2021 | 1045 Capp St | accessibility improvements, unit kitchen upgrades, window replacement (like kind, same size), light fixture replacement, exterior paint, bathroom ventilation and heating system upgrades. n/a maherDetails
accessibility improvements, unit kitchen upgrades, window replacement (like kind, same size), light fixture replacement, exterior paint, bathroom ventilation and heating system upgrades. n/a maher | $1,500,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2020 | 3190 24th St | to comply w/ 201571452. exterior siding repairs, roof work, window replacement in kind, interior paint & watch patching, flooring replacement, electrical system upgrades, plumbing repairs, fire alarm system, bathroom improvements, kitchen improvements and accessibility upgradesDetails
to comply w/ 201571452. exterior siding repairs, roof work, window replacement in kind, interior paint & watch patching, flooring replacement, electrical system upgrades, plumbing repairs, fire alarm system, bathroom improvements, kitchen improvements and accessibility upgrades | $600,000 |
| Jan 9, 2019 | Completed final sign-off Oct 2019 | 3353 26th St | building exterior repair & maintenace; building interior, common areas replacement & repair, electrical system upgrade, ada communication in unit (#2), units 1-10: bathroom & kitchen flooring, kitchen cabinets & countertops, hot water heater, int paint, direct vent hood, kitchen improvements,Details
building exterior repair & maintenace; building interior, common areas replacement & repair, electrical system upgrade, ada communication in unit (#2), units 1-10: bathroom & kitchen flooring, kitchen cabinets & countertops, hot water heater, int paint, direct vent hood, kitchen improvements, | $161,298 |
| Jun 8, 2018 | Completed final sign-off Feb 2019 | 3331 20th St | rev to pa# 201709138072: unit 1 bathroom: rebuild se wall and relocation of plmbg fixtures to comply with ada accessibilityDetails
rev to pa# 201709138072: unit 1 bathroom: rebuild se wall and relocation of plmbg fixtures to comply with ada accessibility | $10,000 |
| Feb 13, 2018 | Completed final sign-off Aug 2018 | 269 Richland Av | replace kitchen casework and bathroom fixtures in 4 units, plumbing repair, replace flooring upgrade electrical system, mod comm unit in 271a, replace 1 water heater in 271a on separate permits, repair exterior stairs. replace (e) 9 front windows with alulminum wood clad windows & single hungDetails
replace kitchen casework and bathroom fixtures in 4 units, plumbing repair, replace flooring upgrade electrical system, mod comm unit in 271a, replace 1 water heater in 271a on separate permits, repair exterior stairs. replace (e) 9 front windows with alulminum wood clad windows & single hung | $72,000 |
| Dec 20, 2017 | Completed final sign-off Nov 2018 | 271 Richland Av | rear building, replace 9 windows with wood, siding repair at rear building. reroofing & siding. elec & plumb upgrades. remodel kitchen & bath in 271b & 271c. grab bars in #271c. 1 water heater. structural work on permit #201708255934.Details
rear building, replace 9 windows with wood, siding repair at rear building. reroofing & siding. elec & plumb upgrades. remodel kitchen & bath in 271b & 271c. grab bars in #271c. 1 water heater. structural work on permit #201708255934. | $60,000 |
| Dec 15, 2017 | Completed final sign-off Feb 2019 | 3329 20th St | revision to pa 2017-0825-5930, replace wood floor in unit 4 to slab on grade. replace interior foundatoins and rebuild bathroom wallsDetails
revision to pa 2017-0825-5930, replace wood floor in unit 4 to slab on grade. replace interior foundatoins and rebuild bathroom walls | |
| Sep 13, 2017 | Completed final sign-off Feb 2019 | 3331 20th St | like for like @front true divided lites 4 over 4 sigle hung, window r & r 10 windows kitchen countertop & cabinets, replacement in # 1,2,3,4 mod grab bars in bathrooms units 1,2,3,4 structural work on pa#201708255930Details
like for like @front true divided lites 4 over 4 sigle hung, window r & r 10 windows kitchen countertop & cabinets, replacement in # 1,2,3,4 mod grab bars in bathrooms units 1,2,3,4 structural work on pa#201708255930 | $80,000 |
| Jul 24, 2017 | Completed final sign-off Sep 2017 | 227 Bay St | grand floor garage level: revision to pa#201503060182, new offices, bathroom at garage, new roll up garage door @ garage (legalize), remove 14 parking spaces. n/a ordinance #155-13Details
grand floor garage level: revision to pa#201503060182, new offices, bathroom at garage, new roll up garage door @ garage (legalize), remove 14 parking spaces. n/a ordinance #155-13 | $5,500 |
| Mar 14, 2016 | Never finaled issued Jul 2016, no final | 1555 Turk Bl | renovate e community bldg, finish, system, roof upgrade. 18" hor addition at bathroom only. max u factor at any new window to =0.36. building 3. life safety under separate permit.Details
renovate e community bldg, finish, system, roof upgrade. 18" hor addition at bathroom only. max u factor at any new window to =0.36. building 3. life safety under separate permit. | $75,000 |
| Feb 12, 2015 | Completed final sign-off Jun 2020 | 534 Natoma St | remodel ground floor to be an additional unit. reconstruct existing rear yard stair in new configuration . minor facade & upper level dwelling unit renovations. in new unit there will be full kitchen & bath. interim control.Details
remodel ground floor to be an additional unit. reconstruct existing rear yard stair in new configuration . minor facade & upper level dwelling unit renovations. in new unit there will be full kitchen & bath. interim control. | $320,000 |
| Oct 10, 2014 | Completed final sign-off Nov 2017 | 1426 06th Av | 3-story rear addition - family room, master suite, dormer @ 4th story - 2 bedrooms, master bath.Details
3-story rear addition - family room, master suite, dormer @ 4th story - 2 bedrooms, master bath. | $240,000 |
| Jul 3, 2014 | Completed final sign-off Sep 2014 | 248 Elsie St | renovation of a s.f.d. bathroom remodel, move bathroom sink, update tub, toilet, light fixtures, relocate light switch and receptical. paint and floor tile. install skylight (fixed 16"x16").Details
renovation of a s.f.d. bathroom remodel, move bathroom sink, update tub, toilet, light fixtures, relocate light switch and receptical. paint and floor tile. install skylight (fixed 16"x16"). | $14,000 |
| Jun 4, 2013 | Completed final sign-off Jun 2013 | 1040 Stockton St | add total of 16 grab bars; 2 toilet rooms; 1 bathroom; 1 bathtub roo on 3/f; same for 4/f; to comply with ordinance 029-13 only, installation of grab bars in sro at the fllowing locations.Details
add total of 16 grab bars; 2 toilet rooms; 1 bathroom; 1 bathtub roo on 3/f; same for 4/f; to comply with ordinance 029-13 only, installation of grab bars in sro at the fllowing locations. | $2,380 |
| Sep 12, 2012 | Completed final sign-off Apr 2013 | 82 Leland Av | install compliant staircase, lula access lift, remodel (e) bathroom to be restroom accessible, install accessible entry, install marque.Details
install compliant staircase, lula access lift, remodel (e) bathroom to be restroom accessible, install accessible entry, install marque. | $130,000 |
| Feb 9, 2012 | Completed final sign-off Aug 2012 | 1825 Mission St | revision to 201007086182 for disabled accessible dimensions and clearances at units 112, 113, 114's bathrooms and kitchensDetails
revision to 201007086182 for disabled accessible dimensions and clearances at units 112, 113, 114's bathrooms and kitchens | |
| Oct 22, 2009 | Expired or cancelled expired Mar 2011 | 229 Judson Av | reconfigure (e) upper & lower bathrooms w/ (n) layout. install (n) concrete grade beam & shear wall. replace substandard floor framing. replace dry-rot wood deck. repair (e) wood stairs in-kind less than 50%-dry-rot.Details
reconfigure (e) upper & lower bathrooms w/ (n) layout. install (n) concrete grade beam & shear wall. replace substandard floor framing. replace dry-rot wood deck. repair (e) wood stairs in-kind less than 50%-dry-rot. | $22,000 |
| Mar 12, 2008 | Completed final sign-off Jul 2008 | 2901 Mariposa St | revision to appl #200605232247: remove (e) hollow clay tile walls @ both stairwells @ 2nd & 3rd floors. replace w/new 1-hr rated metal stud & gyp bd walls.omit new partition @ 2nd flr north laundry,provide new doors at #312 & relocate door @ #318, repalce glazed opening @ 3rd flr bath w/3/4 hr.rateDetails
revision to appl #200605232247: remove (e) hollow clay tile walls @ both stairwells @ 2nd & 3rd floors. replace w/new 1-hr rated metal stud & gyp bd walls.omit new partition @ 2nd flr north laundry,provide new doors at #312 & relocate door @ #318, repalce glazed opening @ 3rd flr bath w/3/4 hr.rate | $18,000 |