Block 5670, lot 013
248 Elsie St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 825 sq ft
- Lot
- 1,797 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 29, 2020 | Never finaled issued Jan 2020, no final | 248 Elsie St | street spaceDetails
street space | ||
| Jan 9, 2020 | Completed final sign-off Oct 2020 | 248 Elsie St | kitchen remodel: install cabinets, relocate sink, appliances, add dishwasher. flip kitchen & stove/range locations. no walls moved, modified or infilled. layout remains unchanged.Details
kitchen remodel: install cabinets, relocate sink, appliances, add dishwasher. flip kitchen & stove/range locations. no walls moved, modified or infilled. layout remains unchanged. | $10,000 | |
| Aug 30, 2019 | Never finaled issued Aug 2019, no final | 248 Elsie St | street space onlyDetails
street space only | ||
| Jul 3, 2014 | Completed final sign-off Sep 2014 | 248 Elsie St | Amone Corp | renovation of a s.f.d. bathroom remodel, move bathroom sink, update tub, toilet, light fixtures, relocate light switch and receptical. paint and floor tile. install skylight (fixed 16"x16").Details
renovation of a s.f.d. bathroom remodel, move bathroom sink, update tub, toilet, light fixtures, relocate light switch and receptical. paint and floor tile. install skylight (fixed 16"x16"). | $14,000 |
| Apr 12, 2010 | Completed final sign-off Nov 2010 | 248 Elsie St | Cronin Construction & Development Inc. | remove rear windows & replace with new windows. reconfigure the toilet & laundry area. remove exterior shingles & replace with new cedar shingles on the front. refinish the redwood siding on the rear. replace the (e) windows with new metal clad eagle windows, u factorDetails
remove rear windows & replace with new windows. reconfigure the toilet & laundry area. remove exterior shingles & replace with new cedar shingles on the front. refinish the redwood siding on the rear. replace the (e) windows with new metal clad eagle windows, u factor | $80,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Amone Corp, Cronin Construction & Development Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.