Dennis Budd
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Dennis Budd Aia Architect
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Jun 2026
30 permits since 2000 (architect on 28 permits, authorized agent-others on 1 permit, engineer on 1 permit): 8 completed, 16 in progress, 3 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2026 | In progress issued Aug 2026 | 5600 Fulton St | Kag Designs And Construction Llc | 1.convert 237 sqft uncond. to habitable space @1st flr main unit. 2. remodel guest suite @1st flr main unit, 3. remove main unit int. service stair & expand /remodel kitchen 4.relocate kitchenette, add main bedroom, bath & closet @ 2nd unit, 5.remove serv entry door & provide selective window work @Details
1.convert 237 sqft uncond. to habitable space @1st flr main unit. 2. remodel guest suite @1st flr main unit, 3. remove main unit int. service stair & expand /remodel kitchen 4.relocate kitchenette, add main bedroom, bath & closet @ 2nd unit, 5.remove serv entry door & provide selective window work @ | $250,000 |
| Jun 25, 2026 | In progress issued Aug 2026 | 282 Eureka St | Perez Construction Llc. | kitchen renovation w/ (n) fixtures, finishes, cabinets, & appliances, modify interior openings @ kitchen, breakfast, entry, & family rooms @ 2nd fl. convert (e) closets @ 3rd fl to (n) main bath w/ (n) skylight. install (n) exterior doors & windows within (e) openings all flrs. repair/replace (e)...Details
kitchen renovation w/ (n) fixtures, finishes, cabinets, & appliances, modify interior openings @ kitchen, breakfast, entry, & family rooms @ 2nd fl. convert (e) closets @ 3rd fl to (n) main bath w/ (n) skylight. install (n) exterior doors & windows within (e) openings all flrs. repair/replace (e)... | $55,000 |
| Jun 11, 2026 | In progress issued Jun 2026 | 889 Elizabeth St | Hunter Dale Builders Inc. | replace (e) solar tube sky light in flat glass model. add 1-hr fire rated roof parapet. replace (e) kitchen cabinet in kind. no plumbing shifts.Details
replace (e) solar tube sky light in flat glass model. add 1-hr fire rated roof parapet. replace (e) kitchen cabinet in kind. no plumbing shifts. | $10,000 |
| Apr 30, 2026 | In progress issued May 2026 | 25 Retiro Wy | Kag Designs And Construction Llc | replace fixtures & finishes in kind in existing locations for 3 baths & 1 kitchen. replace hardwood flooring with new hall shower will be enlarged.Details
replace fixtures & finishes in kind in existing locations for 3 baths & 1 kitchen. replace hardwood flooring with new hall shower will be enlarged. | $125,000 |
| Apr 1, 2026 | In progress issued Jun 2026 | 535 Oak Park Dr | Norwood Construction | (n) 9 sq ft front facade bay window. replace stucco at front and side facade w/ (n) siding. interior renovation at 2/f. kitchen, bedrooms, and bathrooms. (n) finishes on (e) ext stair structure. (n) 2/f windows and skylights. (n) lighting and mech supply ducting at 2/f. (e) gas furnace to remain.Details
(n) 9 sq ft front facade bay window. replace stucco at front and side facade w/ (n) siding. interior renovation at 2/f. kitchen, bedrooms, and bathrooms. (n) finishes on (e) ext stair structure. (n) 2/f windows and skylights. (n) lighting and mech supply ducting at 2/f. (e) gas furnace to remain. | $140,000 |
| Mar 5, 2026 | In progress issued Mar 2026 | 3555 Mission St | corrective action to address nov 202649136. rebuild existing wood deck to comply.Details
corrective action to address nov 202649136. rebuild existing wood deck to comply. | $10,000 | |
| Feb 27, 2026 | In progress issued Mar 2026 | 2566 Pine St | Terence Mcmahon Construction | demo and rebuild (e) entry stair from 1st to 2nd fl (interior stair). reframe (e) wall between common vestibule and unit 1 foyer to accomodate (n) pocket doors mis. elec per plansDetails
demo and rebuild (e) entry stair from 1st to 2nd fl (interior stair). reframe (e) wall between common vestibule and unit 1 foyer to accomodate (n) pocket doors mis. elec per plans | $40,000 |
| Feb 4, 2026 | In progress issued Feb 2026 | 72 Harper St | Elite Engineering Contractors | revision to to pa 202303163798 documentation of existing and proposed gable roof slope tp 10:12 slope (correction from 9:12 roof slope); proposed bldg height increased from 30'-4 1/2" (approved) to 31'-7 1/2" above grade. note: no change to proposed demo, proposed scope of work, or project valuationDetails
revision to to pa 202303163798 documentation of existing and proposed gable roof slope tp 10:12 slope (correction from 9:12 roof slope); proposed bldg height increased from 30'-4 1/2" (approved) to 31'-7 1/2" above grade. note: no change to proposed demo, proposed scope of work, or project valuation | |
| Nov 20, 2025 | In progress filed Nov 2025, not yet issued | 897 Clayton St | excavation (n)foundations, lower 1/f to increase ceiling height from 7'-0" to 9'-6". (n) 1/f partitioning incld family room, gym, bath, storage, mech room & inter stairs. convert 2/f rear window to door for (n)spiral stair access to yard. (n)fire wall @ north prop line. (n) rear yard retaining wallDetails
excavation (n)foundations, lower 1/f to increase ceiling height from 7'-0" to 9'-6". (n) 1/f partitioning incld family room, gym, bath, storage, mech room & inter stairs. convert 2/f rear window to door for (n)spiral stair access to yard. (n)fire wall @ north prop line. (n) rear yard retaining wall | $360,000 | |
| Oct 29, 2025 | In progress issued Oct 2025 | 72 Harper St | Elite Engineering Contractors | revised permit to pa 202303163798 revision and/or removal of door and windows. infill 10 sf at the 3rd floor.Details
revised permit to pa 202303163798 revision and/or removal of door and windows. infill 10 sf at the 3rd floor. | |
| Jul 30, 2025 | Expired or cancelled suspend Sep 2025 | 286 Eureka St | Elisha Mayost | upgrade (e) front windows to (n) windows within (e) rough opening w/lower sill; (n) window @ rearDetails
upgrade (e) front windows to (n) windows within (e) rough opening w/lower sill; (n) window @ rear | $3,000 |
| Jun 4, 2025 | In progress filed Jun 2025, not yet issued | 5 Montague Pl | new roof deck. int & ext stairs for roof deck access. new skylights, fire rated. parapets & roof stair / deck guards. expand garge to include storage / mech rooms. new garage conc floor slab, foundation upgrades. new garage door & rear facade sliding doors. lower (e) rear patio on grade. relocate /Details
new roof deck. int & ext stairs for roof deck access. new skylights, fire rated. parapets & roof stair / deck guards. expand garge to include storage / mech rooms. new garage conc floor slab, foundation upgrades. new garage door & rear facade sliding doors. lower (e) rear patio on grade. relocate / | $334,000 | |
| Apr 29, 2025 | In progress issued Apr 2025 | 1462 11th Av | Elite Engineering Contractors | revision to 202311201167: structural work increase at 1st fl foundation (north & east exterior walls) & area of interior concrete slab on grade replacementDetails
revision to 202311201167: structural work increase at 1st fl foundation (north & east exterior walls) & area of interior concrete slab on grade replacement | $61,488 |
| Mar 6, 2025 | Completed final sign-off Mar 2026 | 2448 Folsom St | Mueller Nicholls Inc | 2/f interior remodel to relocate main bath and add new hall bath. open 144 sq ft of unfinished attic to hall below, provide new insulation. (2) new skylights. mechanical, electrical, and plumbing rerouting and upgrading in area of work. replace 4 windows 1 facing st. u>.30Details
2/f interior remodel to relocate main bath and add new hall bath. open 144 sq ft of unfinished attic to hall below, provide new insulation. (2) new skylights. mechanical, electrical, and plumbing rerouting and upgrading in area of work. replace 4 windows 1 facing st. u>.30 | $75,000 |
| Nov 7, 2024 | In progress issued Feb 2025 | 701 Buena Vista West Av | alter site to pa 202207138359 - fill in 47sf building notch on 2/f for kitchen use.Details
alter site to pa 202207138359 - fill in 47sf building notch on 2/f for kitchen use. | $12,784 | |
| Oct 3, 2024 | Completed final sign-off Jul 2025 | 2671 17th Av | Mizen Construction Inc | revision to pa # 2022-0304-9310 remove from rear deck scope: demo (e) 2-story rear wood deck & stairs, replace with (n) steel framed decks with spiral stair. minor interior partition changes and changes to (n) exterior window sizesDetails
revision to pa # 2022-0304-9310 remove from rear deck scope: demo (e) 2-story rear wood deck & stairs, replace with (n) steel framed decks with spiral stair. minor interior partition changes and changes to (n) exterior window sizes | |
| Jul 31, 2024 | Completed final sign-off Apr 2025 | 2255 Clay St | Terence Mcmahon Construction | interior renovation of 3/f kitchen, laundry and eating spaces. 4/f: to create a new guest bedroom and remodel (e) office area. drop 195 sq.ft of built-up floor framing at 4/f to match height of (e) adj. office area. mep work throughout 4/f interior spaces.Details
interior renovation of 3/f kitchen, laundry and eating spaces. 4/f: to create a new guest bedroom and remodel (e) office area. drop 195 sq.ft of built-up floor framing at 4/f to match height of (e) adj. office area. mep work throughout 4/f interior spaces. | $115,000 |
| May 4, 2023 | Never finaled filed May 2023, never issued | 1455 12th Av | 3-story rear horizontal addition. excavate lower 1st floor slab on grade. convert partial garage to living space. (n) interior 1st to 2nd flr stair. (n) green & solar ready roofs. (n) fixtures & finishes. expand hydronic radiant heating. relocate utility meters. repave downsloping driveway.Details
3-story rear horizontal addition. excavate lower 1st floor slab on grade. convert partial garage to living space. (n) interior 1st to 2nd flr stair. (n) green & solar ready roofs. (n) fixtures & finishes. expand hydronic radiant heating. relocate utility meters. repave downsloping driveway. | $318,000 | |
| Mar 29, 2023 | Completed final sign-off Sep 2024 | 559 Liberty St | Macetown Builders Inc, J K Construction Co | replace e rear yard facde french doors & double hung windows w/ new door system, replace e wood trellis w/ steel-wood hybrid type, design in-knd, replace e rear yard elec outlets/lighting, hose bibs &irrigation systems, relocate e rear yard masonry steps, ret.walls & patio w/new cip concrete.Details
replace e rear yard facde french doors & double hung windows w/ new door system, replace e wood trellis w/ steel-wood hybrid type, design in-knd, replace e rear yard elec outlets/lighting, hose bibs &irrigation systems, relocate e rear yard masonry steps, ret.walls & patio w/new cip concrete. | $45,000 |
| Mar 16, 2023 | In progress issued Jun 2024 | 72 Harper St | J K Construction Co, Elite Engineering Contractors | 3 story rear addition,convert 1st fl to adu,elevate portion of roof,interior partition changes on all fls,construct excavated rear yard light court,re-build front steps in kind to met egress code,install fire sprinkler stystem,full seismic upgrade of bldg,new fixtures fitting & finishes throughout.Details
3 story rear addition,convert 1st fl to adu,elevate portion of roof,interior partition changes on all fls,construct excavated rear yard light court,re-build front steps in kind to met egress code,install fire sprinkler stystem,full seismic upgrade of bldg,new fixtures fitting & finishes throughout. | $985,000 |
| Nov 29, 2022 | In progress issued Oct 2023 | 150 24th Av | Jeff King And Company Inc | renovation & partition changes all (3) flrs. provide (n) mep, fixtures, finishes & fittings. add (1) skylight, replace (1) exterior door & (16) windows. rebuild fencing, gate & add lanscape at (n) rear entry.conver 1st space to habitableDetails
renovation & partition changes all (3) flrs. provide (n) mep, fixtures, finishes & fittings. add (1) skylight, replace (1) exterior door & (16) windows. rebuild fencing, gate & add lanscape at (n) rear entry.conver 1st space to habitable | $200,000 |
| Aug 11, 2022 | Expired or cancelled expired Nov 2024 | 2566 Pine St | Terence Mcmahon Construction | (unit #1 & #4) unit #1: demo & relocate (e) stair from kitchen to rear patio. kitchen remodel include windows, electrical, mech & plumbing per plans. unit #4: raise ceiling 18". bath & bedroom remodel including partitions & mep.Details
(unit #1 & #4) unit #1: demo & relocate (e) stair from kitchen to rear patio. kitchen remodel include windows, electrical, mech & plumbing per plans. unit #4: raise ceiling 18". bath & bedroom remodel including partitions & mep. | $85,000 |
| Jul 13, 2022 | In progress issued Jan 2024 | 701 Buena Vista West Av | demo attached single-car garage & construct attached two car tandem garage.horizontal additions at 2nd fl(over garage)and 4th fl(xisting penthouse).roof height increase at 4th fl.fire sprinkler ew addition areas,enclose recycling bins.rear yard variance required.Details
demo attached single-car garage & construct attached two car tandem garage.horizontal additions at 2nd fl(over garage)and 4th fl(xisting penthouse).roof height increase at 4th fl.fire sprinkler ew addition areas,enclose recycling bins.rear yard variance required. | $475,000 | |
| Mar 4, 2022 | Completed final sign-off Jul 2025 | 2671 17th Av | Mizen Construction Inc | in-fill (e) 57 sq ft 2-story light court w/ connected horizontal addition over (e) roof. in-fill (e) 9 sf 3-story property line light well. demo (e) 2-story rear wood deck & stairs, replace w/ steel-framed balconies & 1-story spiral stair. shift (e) interior main stair +/- 36" to rear.Details
in-fill (e) 57 sq ft 2-story light court w/ connected horizontal addition over (e) roof. in-fill (e) 9 sf 3-story property line light well. demo (e) 2-story rear wood deck & stairs, replace w/ steel-framed balconies & 1-story spiral stair. shift (e) interior main stair +/- 36" to rear. | $320,000 |
| Aug 4, 2021 | Completed final sign-off Aug 2024 | 1110 Dolores St | Macetown Builders Inc | supplemental work to new roof deck per bpa#2021020755. windscreen (72"above deck surface)& steel framed roof canopy (95"above deck surface)Details
supplemental work to new roof deck per bpa#2021020755. windscreen (72"above deck surface)& steel framed roof canopy (95"above deck surface) | $100,000 |
| Mar 22, 2021 | Completed final sign-off Feb 2025 | 3825 21st St | J K Construction Co | construct(n)1st(office)&3rd(1bed,1bath)story extention@the rear.remodel entire house w/(n)layouts.excavate+/-11"@ground lvl for(n)living space(guest suite&office).shift facade entry&increase garage door ht.demo(2)&construct(3)(n)window bays on front facade.in-fill(2)story lightwell on the east sideDetails
construct(n)1st(office)&3rd(1bed,1bath)story extention@the rear.remodel entire house w/(n)layouts.excavate+/-11"@ground lvl for(n)living space(guest suite&office).shift facade entry&increase garage door ht.demo(2)&construct(3)(n)window bays on front facade.in-fill(2)story lightwell on the east side | $619,300 |
| Oct 29, 2019 | Completed final sign-off Apr 2024 | 26 Whitney St | 1) construct (2) story over basement rear addition to existing residence. 2) excavate basement level +/- 22" lower. add rear light-wells, widen garage door. 3) fill-in light well on 2nd floor and construct new master bedroom suite. 4) new rear deck on grade.Details
1) construct (2) story over basement rear addition to existing residence. 2) excavate basement level +/- 22" lower. add rear light-wells, widen garage door. 3) fill-in light well on 2nd floor and construct new master bedroom suite. 4) new rear deck on grade. | $327,300 | |
| Oct 15, 2019 | Never finaled issued Oct 2021, no final | 364 Richland Av | to erect a 2-story, type vb, single family bldg w/o basement at front of (e) sfd. renovation of (e) rear bldg under pa#2019-1015-4448s.Details
to erect a 2-story, type vb, single family bldg w/o basement at front of (e) sfd. renovation of (e) rear bldg under pa#2019-1015-4448s. | $175,000 | |
| Oct 15, 2019 | Never finaled issued Oct 2021, no final | 364 Richland Av | lift bldg 3'-0". renovate & expand lower level to include entry, (3) bedrooms + (2) baths. stair addition @ side & kitchen addition @ rear. (n) 2nd flr deck @ se corner. construction of (n) front bldg under pa#2019-1015-4444-s.Details
lift bldg 3'-0". renovate & expand lower level to include entry, (3) bedrooms + (2) baths. stair addition @ side & kitchen addition @ rear. (n) 2nd flr deck @ se corner. construction of (n) front bldg under pa#2019-1015-4444-s. | $370,000 | |
| May 6, 2005 | Expired or cancelled cancelled Jun 2006 | 1801 Bush St | Renaissance Renovations | ground floor - raise/level floor in rear yoga room. add access signage.Details
ground floor - raise/level floor in rear yoga room. add access signage. | $7,800 |