Kag Designs And Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2022 to Aug 2026
- Last 24 months
- 34 permits filed
49 permits since 2000: 26 completed, 19 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2026 | In progress filed Aug 2026, not yet issued | 56 Casa Wy | interior renovation of existing 2 level dwelling unit. improvements include kitchen alteration on 3rd fl. bath alterations on 4th fl, including new half bath within e bathroom footprint. 2 new wall openings in an e wall with new header, new built in casework,new firebrick at fireplace. elec plum sepDetails
interior renovation of existing 2 level dwelling unit. improvements include kitchen alteration on 3rd fl. bath alterations on 4th fl, including new half bath within e bathroom footprint. 2 new wall openings in an e wall with new header, new built in casework,new firebrick at fireplace. elec plum sep | $250,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 2458 Polk St | remodel existing total 2 bathrooms, replace double vanity. remove tub and build new shower. replace fixtures and finishes. replace fixture and finishes in kind in existing locations, hall bathDetails
remodel existing total 2 bathrooms, replace double vanity. remove tub and build new shower. replace fixtures and finishes. replace fixture and finishes in kind in existing locations, hall bath | $35,000 |
| Jun 30, 2026 | In progress issued Aug 2026 | 5600 Fulton St | 1.convert 237 sqft uncond. to habitable space @1st flr main unit. 2. remodel guest suite @1st flr main unit, 3. remove main unit int. service stair & expand /remodel kitchen 4.relocate kitchenette, add main bedroom, bath & closet @ 2nd unit, 5.remove serv entry door & provide selective window work @Details
1.convert 237 sqft uncond. to habitable space @1st flr main unit. 2. remodel guest suite @1st flr main unit, 3. remove main unit int. service stair & expand /remodel kitchen 4.relocate kitchenette, add main bedroom, bath & closet @ 2nd unit, 5.remove serv entry door & provide selective window work @ | $250,000 |
| Jun 22, 2026 | Completed final sign-off Aug 2026 | 138 Ord St | install kitchen pennisula for washer and dryer under cabinets.Details
install kitchen pennisula for washer and dryer under cabinets. | $4,000 |
| Jun 17, 2026 | In progress issued Jun 2026 | 1578 Indiana St | unit #10 - replace kitchen cabinets, counters, & appliances in kind in (e) locations. replace flooring, vanity, & toilet in bathroom in (e) locations. kitchen approximately 116sf, powder room approximately 35sf.Details
unit #10 - replace kitchen cabinets, counters, & appliances in kind in (e) locations. replace flooring, vanity, & toilet in bathroom in (e) locations. kitchen approximately 116sf, powder room approximately 35sf. | $45,000 |
| Jun 15, 2026 | In progress issued Jun 2026 | 635 Chestnut St | unit 635: remodel existing kitchen inkind and bathroom remodel, covert tub to shower, replacement of fixtures and finishes.Details
unit 635: remodel existing kitchen inkind and bathroom remodel, covert tub to shower, replacement of fixtures and finishes. | $55,000 |
| Jun 2, 2026 | Completed final sign-off Sep 2026 | 3724 Webster St | remodel in kind in existing location 2nd fl kitchen. remodel 1st fl bathroom and add partition walls for 2 bedrooms including closets, non load bearing.no structuralDetails
remodel in kind in existing location 2nd fl kitchen. remodel 1st fl bathroom and add partition walls for 2 bedrooms including closets, non load bearing.no structural | $75,000 |
| May 14, 2026 | In progress issued May 2026 | 5600 Fulton St | 3rd floor: kitchen remodel in kind.Details
3rd floor: kitchen remodel in kind. | $28,000 |
| Apr 30, 2026 | In progress issued May 2026 | 25 Retiro Wy | replace fixtures & finishes in kind in existing locations for 3 baths & 1 kitchen. replace hardwood flooring with new hall shower will be enlarged.Details
replace fixtures & finishes in kind in existing locations for 3 baths & 1 kitchen. replace hardwood flooring with new hall shower will be enlarged. | $125,000 |
| Apr 6, 2026 | Completed final sign-off May 2026 | 3467 Jackson St | minor deck repair under 25%.Details
minor deck repair under 25%. | $3,000 |
| Mar 19, 2026 | In progress issued Mar 2026 | 3187 Clay St | replace kitchen counters, new faucet, new receptacles. all in same locations. replace powder room vanity & faucet in same locations.Details
replace kitchen counters, new faucet, new receptacles. all in same locations. replace powder room vanity & faucet in same locations. | $8,000 |
| Mar 18, 2026 | Expired or cancelled withdrawn Mar 2026 | 3187 Clay St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $10,561 |
| Feb 23, 2026 | Completed final sign-off Feb 2026 | 1150 Lombard St | unit 18: to obtain final inspection for work approved under pa# 200708170229. all work is complete.Details
unit 18: to obtain final inspection for work approved under pa# 200708170229. all work is complete. | |
| Feb 2, 2026 | In progress issued Mar 2026 | 1250 Jones St | unit #502: renovate (e) kitchen. add opening in n.l.b wall between & living room. add powder room. remove bathroom door and n.l.b wall between kitchen and hall.Details
unit #502: renovate (e) kitchen. add opening in n.l.b wall between & living room. add powder room. remove bathroom door and n.l.b wall between kitchen and hall. | $35,000 |
| Dec 16, 2025 | Completed final sign-off Dec 2025 | 1420 Sloat Bl | replace in kind l/r window west side, eliminated replace in-kind in north b/r. not visible from st.Details
replace in kind l/r window west side, eliminated replace in-kind in north b/r. not visible from st. | $1,000 |
| Nov 3, 2025 | Completed final sign-off Dec 2025 | 1371 De Haro St | to comply with nov 202544889 items 2-5: repair dry rot including guard rail, water damage at kitchen windows, street visible. will have scaffolding set up along sidewalk to paint affect areas, exterior.Details
to comply with nov 202544889 items 2-5: repair dry rot including guard rail, water damage at kitchen windows, street visible. will have scaffolding set up along sidewalk to paint affect areas, exterior. | $5,000 |
| Oct 2, 2025 | Completed final sign-off Mar 2026 | 2058 45th Av | revision - minor interior change to smaller closet and legal bedroomDetails
revision - minor interior change to smaller closet and legal bedroom | |
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 1420 Sloat Bl | repair to front exterior landing less than 50%.Details
repair to front exterior landing less than 50%. | $4,000 |
| Aug 18, 2025 | Completed final sign-off Sep 2025 | 34 Harris Pl | to abate nov 202540566 item 2a window replacement all units non street facing, 2 b to include replacement of exterior overhead wood beam and posts and concrete footings, 2c replacement of tankless water heater.Details
to abate nov 202540566 item 2a window replacement all units non street facing, 2 b to include replacement of exterior overhead wood beam and posts and concrete footings, 2c replacement of tankless water heater. | $5,000 |
| Aug 6, 2025 | Completed final sign-off Jan 2026 | 2234 California St | unit b: to revise permit 202505307557. add new sheetrock to hallway.Details
unit b: to revise permit 202505307557. add new sheetrock to hallway. | $3,000 |
| Jul 2, 2025 | Completed final sign-off Dec 2025 | 2341 Franklin St | unit #4: modify partition in third fl. front unit# 4, remove n.l.b. partition, move kitchen, old kitchen converted to bedroom add sound proofing to underside ceiling in two rooms. new laundryDetails
unit #4: modify partition in third fl. front unit# 4, remove n.l.b. partition, move kitchen, old kitchen converted to bedroom add sound proofing to underside ceiling in two rooms. new laundry | $35,000 |
| Jun 26, 2025 | In progress issued Jul 2025 | 2863 Union St | revision #3 to pa 202406214986 bathroom changes, interior door changes, storage room changes. no change on plumbing fixtures!Details
revision #3 to pa 202406214986 bathroom changes, interior door changes, storage room changes. no change on plumbing fixtures! | |
| Jun 25, 2025 | Completed final sign-off Oct 2025 | 145 Divisadero St | interior remodel of (e) office, new loft and built in storage, (n) electrical, no structural or exterior workDetails
interior remodel of (e) office, new loft and built in storage, (n) electrical, no structural or exterior work | $15,000 |
| Jun 25, 2025 | In progress issued Jun 2025 | 1420 Sloat Bl | revision to pa 2025-0509-6149 remove scope of stair and new half bath. keep both (e). remove window at rearDetails
revision to pa 2025-0509-6149 remove scope of stair and new half bath. keep both (e). remove window at rear | |
| May 30, 2025 | Completed final sign-off Jan 2026 | 2234 California St | unit b: e) pantry to be turned into new bathroom & laundry.Details
unit b: e) pantry to be turned into new bathroom & laundry. | $20,000 |
| May 9, 2025 | In progress issued May 2025 | 1420 Sloat Bl | interior remodel of non structural partitions, moved powder room, new pantry, kitchen and bath remodels, (e) window replacement in kind on facade. aluminum clad wood for front 2 windows, replace 4 side/rear windows as wellDetails
interior remodel of non structural partitions, moved powder room, new pantry, kitchen and bath remodels, (e) window replacement in kind on facade. aluminum clad wood for front 2 windows, replace 4 side/rear windows as well | $100,000 |
| Apr 29, 2025 | In progress issued May 2025 | 2863 Union St | 2nd revision to pa #202406214986. revise kitchen and bathroom layouts, new interior doors to new closet. washer and dryer change of location. new wall in garage for storage room. no structural or plumbing changes.Details
2nd revision to pa #202406214986. revise kitchen and bathroom layouts, new interior doors to new closet. washer and dryer change of location. new wall in garage for storage room. no structural or plumbing changes. | |
| Apr 23, 2025 | In progress issued Apr 2025 | 1960 Vallejo St | remove non load bearing partition in (e) bedroom. replace operable patio door & sidelites with single fixed window. remove hall closet- add cosmetic archDetails
remove non load bearing partition in (e) bedroom. replace operable patio door & sidelites with single fixed window. remove hall closet- add cosmetic arch | $35,000 |
| Mar 11, 2025 | Completed final sign-off Jun 2025 | 2075 Sutter St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 1 shower pan(s). | $36,000 |
| Feb 10, 2025 | Completed final sign-off Jun 2025 | 1578 Indiana St | unit #10: revision to bldg permit #2024-1230-7533. reduce scope to build (1) closet only, 14 sq ft. non strutural work. no plumbing or electrical in closet.Details
unit #10: revision to bldg permit #2024-1230-7533. reduce scope to build (1) closet only, 14 sq ft. non strutural work. no plumbing or electrical in closet. | |
| Jan 9, 2025 | Completed final sign-off Mar 2026 | 2058 45th Av | interior remodel adding new office and bathroom in existing garage space. removal of upstairs structural wall. convert 170 sqft uncondition to conditioned space.Details
interior remodel adding new office and bathroom in existing garage space. removal of upstairs structural wall. convert 170 sqft uncondition to conditioned space. | $60,000 |
| Jan 3, 2025 | In progress issued Jan 2025 | 2863 Union St | rev 202406214986- update washer and dryer location, (n) kitchen layout and interior door changes.Details
rev 202406214986- update washer and dryer location, (n) kitchen layout and interior door changes. | |
| Dec 30, 2024 | Completed final sign-off Jun 2025 | 1578 Indiana St | unit #10: replace fixtures and finishes in kind in existing bathroom location build 2 closets in bedroom in pass through space. no structural work.Details
unit #10: replace fixtures and finishes in kind in existing bathroom location build 2 closets in bedroom in pass through space. no structural work. | $30,000 |
| Dec 4, 2024 | In progress issued Dec 2024 | 2405 Folsom St | unit #3: replace kitchen counters in kind.(exist. cabinets to remain as is)Details
unit #3: replace kitchen counters in kind.(exist. cabinets to remain as is) | $4,000 |
| Aug 8, 2024 | Expired or cancelled cancelled Jan 2026 | 228 Downey St | small concrete repair. replace 3 boards exterior siding. not visible from street.Details
small concrete repair. replace 3 boards exterior siding. not visible from street. | $1,000 |
| Jul 26, 2024 | Completed final sign-off Oct 2024 | 2863 Union St | exterior rear deck repair of second (less than 50%, inkind) and fourth floor decks (full) like to like repair.Details
exterior rear deck repair of second (less than 50%, inkind) and fourth floor decks (full) like to like repair. | $10,000 |
| Jul 26, 2024 | In progress issued Jul 2024 | 1627 Beach St | garage foundation work. delta 2 milestone on stamped plans. revision to pa#202204152362Details
garage foundation work. delta 2 milestone on stamped plans. revision to pa#202204152362 | $35,000 |
| Jul 2, 2024 | Completed final sign-off Oct 2024 | 1325 Indiana St | unit #16: replace fixtures/finishes in same locations in existing bath.Details
unit #16: replace fixtures/finishes in same locations in existing bath. | $18,000 |
| Jun 21, 2024 | In progress issued Aug 2024 | 2863 Union St | unit 2861: interior remodel of ground level studio unit; making (e) storage new conditioned space and new office. remodel of (e) bathroom, and remodel of (e) kitchen.Details
unit 2861: interior remodel of ground level studio unit; making (e) storage new conditioned space and new office. remodel of (e) bathroom, and remodel of (e) kitchen. | $50,000 |
| Jun 4, 2024 | Completed final sign-off Oct 2024 | 1250 Jones St | replace fixtures & finishes in kind in existing locations - (bathroom). no removal of wallsDetails
replace fixtures & finishes in kind in existing locations - (bathroom). no removal of walls | $38,000 |
| Mar 27, 2024 | Completed final sign-off Mar 2025 | 1459 16th Av | update title 24 report with actual equipment. rev to pa 202212309518.Details
update title 24 report with actual equipment. rev to pa 202212309518. | |
| Sep 19, 2023 | Never finaled issued Sep 2023, no final | 2317 Jones St | replace bath fixtures and finishes in kind (one bathroom). no exterior work.Details
replace bath fixtures and finishes in kind (one bathroom). no exterior work. | $26,000 |
| Aug 2, 2023 | Completed final sign-off Oct 2024 | 405 Noriega St | revision 202304206119: change size of beam above kitchen from 18" deep to 14" deepDetails
revision 202304206119: change size of beam above kitchen from 18" deep to 14" deep | |
| Aug 1, 2023 | Completed final sign-off Nov 2024 | 30 Justin Dr | revision to 202307192509. swapped location of bath in the existing work area at ground level. no additional plumbing fixtures.Details
revision to 202307192509. swapped location of bath in the existing work area at ground level. no additional plumbing fixtures. | |
| Jul 19, 2023 | Completed final sign-off Nov 2024 | 30 Justin Dr | remove & enlarge (e) stair to garage leve. renovate garage level add 814 sf w/ 1 bedroom, 1 bath, rear deck (30" above grade). new patio door, remove/ replace windowsDetails
remove & enlarge (e) stair to garage leve. renovate garage level add 814 sf w/ 1 bedroom, 1 bath, rear deck (30" above grade). new patio door, remove/ replace windows | $140,000 |
| Jun 2, 2023 | Completed final sign-off Sep 2023 | 61 Carl St | (front bldg) replace in kind fixtures and finishes in one existing bathroom. non structural work.Details
(front bldg) replace in kind fixtures and finishes in one existing bathroom. non structural work. | $35,000 |
| Apr 20, 2023 | Completed final sign-off Oct 2024 | 405 Noriega St | modify partitions at kitchen, add full bathroom next to kitchen, upstairs laundry room, new fixtures/finshes in each upstairs baths, new beam above kitchen.Details
modify partitions at kitchen, add full bathroom next to kitchen, upstairs laundry room, new fixtures/finshes in each upstairs baths, new beam above kitchen. | $85,000 |
| Aug 3, 2022 | In progress issued Jul 2024 | 1627 Beach St | revision to pa# 202204152362 to infill the den and family roomDetails
revision to pa# 202204152362 to infill the den and family room | |
| Apr 15, 2022 | Never finaled issued Jul 2022, no final | 1627 Beach St | add family room, den, bathroom and laundry room to ground fl. renovate kitchen & bathroom on level 1. add internal stair connecting ground floor & level 1.Details
add family room, den, bathroom and laundry room to ground fl. renovate kitchen & bathroom on level 1. add internal stair connecting ground floor & level 1. | $200,000 |