Back to bathroom remodel contractors
Kag Designs And Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2022 to Aug 2026
- Last 24 months
- 34 permits filed
49 permits since 2000: 26 completed, 19 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 11 completed, 12 in progress, 2 never finaled, 1 expired or cancelled. Typically 10 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2026 | In progress filed Aug 2026, not yet issued | 56 Casa Wy | interior renovation of existing 2 level dwelling unit. improvements include kitchen alteration on 3rd fl. bath alterations on 4th fl, including new half bath within e bathroom footprint. 2 new wall openings in an e wall with new header, new built in casework,new firebrick at fireplace. elec plum sepDetails
interior renovation of existing 2 level dwelling unit. improvements include kitchen alteration on 3rd fl. bath alterations on 4th fl, including new half bath within e bathroom footprint. 2 new wall openings in an e wall with new header, new built in casework,new firebrick at fireplace. elec plum sep | $250,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 2458 Polk St | remodel existing total 2 bathrooms, replace double vanity. remove tub and build new shower. replace fixtures and finishes. replace fixture and finishes in kind in existing locations, hall bathDetails
remodel existing total 2 bathrooms, replace double vanity. remove tub and build new shower. replace fixtures and finishes. replace fixture and finishes in kind in existing locations, hall bath | $35,000 |
| Jun 30, 2026 | In progress issued Aug 2026 | 5600 Fulton St | 1.convert 237 sqft uncond. to habitable space @1st flr main unit. 2. remodel guest suite @1st flr main unit, 3. remove main unit int. service stair & expand /remodel kitchen 4.relocate kitchenette, add main bedroom, bath & closet @ 2nd unit, 5.remove serv entry door & provide selective window work @Details
1.convert 237 sqft uncond. to habitable space @1st flr main unit. 2. remodel guest suite @1st flr main unit, 3. remove main unit int. service stair & expand /remodel kitchen 4.relocate kitchenette, add main bedroom, bath & closet @ 2nd unit, 5.remove serv entry door & provide selective window work @ | $250,000 |
| Jun 17, 2026 | In progress issued Jun 2026 | 1578 Indiana St | unit #10 - replace kitchen cabinets, counters, & appliances in kind in (e) locations. replace flooring, vanity, & toilet in bathroom in (e) locations. kitchen approximately 116sf, powder room approximately 35sf.Details
unit #10 - replace kitchen cabinets, counters, & appliances in kind in (e) locations. replace flooring, vanity, & toilet in bathroom in (e) locations. kitchen approximately 116sf, powder room approximately 35sf. | $45,000 |
| Jun 15, 2026 | In progress issued Jun 2026 | 635 Chestnut St | unit 635: remodel existing kitchen inkind and bathroom remodel, covert tub to shower, replacement of fixtures and finishes.Details
unit 635: remodel existing kitchen inkind and bathroom remodel, covert tub to shower, replacement of fixtures and finishes. | $55,000 |
| Jun 2, 2026 | Completed final sign-off Sep 2026 | 3724 Webster St | remodel in kind in existing location 2nd fl kitchen. remodel 1st fl bathroom and add partition walls for 2 bedrooms including closets, non load bearing.no structuralDetails
remodel in kind in existing location 2nd fl kitchen. remodel 1st fl bathroom and add partition walls for 2 bedrooms including closets, non load bearing.no structural | $75,000 |
| Apr 30, 2026 | In progress issued May 2026 | 25 Retiro Wy | replace fixtures & finishes in kind in existing locations for 3 baths & 1 kitchen. replace hardwood flooring with new hall shower will be enlarged.Details
replace fixtures & finishes in kind in existing locations for 3 baths & 1 kitchen. replace hardwood flooring with new hall shower will be enlarged. | $125,000 |
| Mar 18, 2026 | Expired or cancelled withdrawn Mar 2026 | 3187 Clay St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $10,561 |
| Feb 2, 2026 | In progress issued Mar 2026 | 1250 Jones St | unit #502: renovate (e) kitchen. add opening in n.l.b wall between & living room. add powder room. remove bathroom door and n.l.b wall between kitchen and hall.Details
unit #502: renovate (e) kitchen. add opening in n.l.b wall between & living room. add powder room. remove bathroom door and n.l.b wall between kitchen and hall. | $35,000 |
| Jun 26, 2025 | In progress issued Jul 2025 | 2863 Union St | revision #3 to pa 202406214986 bathroom changes, interior door changes, storage room changes. no change on plumbing fixtures!Details
revision #3 to pa 202406214986 bathroom changes, interior door changes, storage room changes. no change on plumbing fixtures! | |
| Jun 25, 2025 | In progress issued Jun 2025 | 1420 Sloat Bl | revision to pa 2025-0509-6149 remove scope of stair and new half bath. keep both (e). remove window at rearDetails
revision to pa 2025-0509-6149 remove scope of stair and new half bath. keep both (e). remove window at rear | |
| May 30, 2025 | Completed final sign-off Jan 2026 | 2234 California St | unit b: e) pantry to be turned into new bathroom & laundry.Details
unit b: e) pantry to be turned into new bathroom & laundry. | $20,000 |
| May 9, 2025 | In progress issued May 2025 | 1420 Sloat Bl | interior remodel of non structural partitions, moved powder room, new pantry, kitchen and bath remodels, (e) window replacement in kind on facade. aluminum clad wood for front 2 windows, replace 4 side/rear windows as wellDetails
interior remodel of non structural partitions, moved powder room, new pantry, kitchen and bath remodels, (e) window replacement in kind on facade. aluminum clad wood for front 2 windows, replace 4 side/rear windows as well | $100,000 |
| Apr 29, 2025 | In progress issued May 2025 | 2863 Union St | 2nd revision to pa #202406214986. revise kitchen and bathroom layouts, new interior doors to new closet. washer and dryer change of location. new wall in garage for storage room. no structural or plumbing changes.Details
2nd revision to pa #202406214986. revise kitchen and bathroom layouts, new interior doors to new closet. washer and dryer change of location. new wall in garage for storage room. no structural or plumbing changes. | |
| Mar 11, 2025 | Completed final sign-off Jun 2025 | 2075 Sutter St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 1 shower pan(s). | $36,000 |
| Jan 9, 2025 | Completed final sign-off Mar 2026 | 2058 45th Av | interior remodel adding new office and bathroom in existing garage space. removal of upstairs structural wall. convert 170 sqft uncondition to conditioned space.Details
interior remodel adding new office and bathroom in existing garage space. removal of upstairs structural wall. convert 170 sqft uncondition to conditioned space. | $60,000 |
| Dec 30, 2024 | Completed final sign-off Jun 2025 | 1578 Indiana St | unit #10: replace fixtures and finishes in kind in existing bathroom location build 2 closets in bedroom in pass through space. no structural work.Details
unit #10: replace fixtures and finishes in kind in existing bathroom location build 2 closets in bedroom in pass through space. no structural work. | $30,000 |
| Jul 2, 2024 | Completed final sign-off Oct 2024 | 1325 Indiana St | unit #16: replace fixtures/finishes in same locations in existing bath.Details
unit #16: replace fixtures/finishes in same locations in existing bath. | $18,000 |
| Jun 21, 2024 | In progress issued Aug 2024 | 2863 Union St | unit 2861: interior remodel of ground level studio unit; making (e) storage new conditioned space and new office. remodel of (e) bathroom, and remodel of (e) kitchen.Details
unit 2861: interior remodel of ground level studio unit; making (e) storage new conditioned space and new office. remodel of (e) bathroom, and remodel of (e) kitchen. | $50,000 |
| Jun 4, 2024 | Completed final sign-off Oct 2024 | 1250 Jones St | replace fixtures & finishes in kind in existing locations - (bathroom). no removal of wallsDetails
replace fixtures & finishes in kind in existing locations - (bathroom). no removal of walls | $38,000 |
| Sep 19, 2023 | Never finaled issued Sep 2023, no final | 2317 Jones St | replace bath fixtures and finishes in kind (one bathroom). no exterior work.Details
replace bath fixtures and finishes in kind (one bathroom). no exterior work. | $26,000 |
| Aug 1, 2023 | Completed final sign-off Nov 2024 | 30 Justin Dr | revision to 202307192509. swapped location of bath in the existing work area at ground level. no additional plumbing fixtures.Details
revision to 202307192509. swapped location of bath in the existing work area at ground level. no additional plumbing fixtures. | |
| Jul 19, 2023 | Completed final sign-off Nov 2024 | 30 Justin Dr | remove & enlarge (e) stair to garage leve. renovate garage level add 814 sf w/ 1 bedroom, 1 bath, rear deck (30" above grade). new patio door, remove/ replace windowsDetails
remove & enlarge (e) stair to garage leve. renovate garage level add 814 sf w/ 1 bedroom, 1 bath, rear deck (30" above grade). new patio door, remove/ replace windows | $140,000 |
| Jun 2, 2023 | Completed final sign-off Sep 2023 | 61 Carl St | (front bldg) replace in kind fixtures and finishes in one existing bathroom. non structural work.Details
(front bldg) replace in kind fixtures and finishes in one existing bathroom. non structural work. | $35,000 |
| Apr 20, 2023 | Completed final sign-off Oct 2024 | 405 Noriega St | modify partitions at kitchen, add full bathroom next to kitchen, upstairs laundry room, new fixtures/finshes in each upstairs baths, new beam above kitchen.Details
modify partitions at kitchen, add full bathroom next to kitchen, upstairs laundry room, new fixtures/finshes in each upstairs baths, new beam above kitchen. | $85,000 |
| Apr 15, 2022 | Never finaled issued Jul 2022, no final | 1627 Beach St | add family room, den, bathroom and laundry room to ground fl. renovate kitchen & bathroom on level 1. add internal stair connecting ground floor & level 1.Details
add family room, den, bathroom and laundry room to ground fl. renovate kitchen & bathroom on level 1. add internal stair connecting ground floor & level 1. | $200,000 |