Kerstin Fischer
- Listed as
- architect
- Firm
- Fishcher Architecture
- Based in
- Berkeley
- On San Francisco permits
- Sep 2007 to Oct 2026
7 permits since 2000 (architect on 7 permits): 3 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 4, 2026 | In progress filed Oct 2026, not yet issued | 682 Miramar Av | covert (e) detached garage into adu. work to be performed within (e) walls, change roof structure from flat to shed within (e) envelop. no addition or extension. project will comply with all-electric per the sfdbi ab-112.Details
covert (e) detached garage into adu. work to be performed within (e) walls, change roof structure from flat to shed within (e) envelop. no addition or extension. project will comply with all-electric per the sfdbi ab-112. | $500,000 | |
| Aug 27, 2026 | In progress filed Aug 2026, not yet issued | 682 Miramar Av | full interior remodel for bathrooms, kitchen & living spaces. excavation of (e) basement to add more habitable space. replace windows throughout project. add skylight. remove deck.Details
full interior remodel for bathrooms, kitchen & living spaces. excavation of (e) basement to add more habitable space. replace windows throughout project. add skylight. remove deck. | $1,000,000 | |
| Aug 21, 2026 | In progress filed Aug 2026, not yet issued | 307 Moultrie St | interior remodel to relocate stairs and make code complaint. kitchen remodel and adding/replacing dormer, adding/replacing windows, and replacing doors.Details
interior remodel to relocate stairs and make code complaint. kitchen remodel and adding/replacing dormer, adding/replacing windows, and replacing doors. | $350,000 | |
| Jun 7, 2021 | Completed final sign-off Apr 2023 | 195 Santa Ana Av | Saturn Construction Co | interior remodel of master bved/bathroom suite and office. reconfig window locaitons on north elevation and addition of skylights, all not vislbe from street.Details
interior remodel of master bved/bathroom suite and office. reconfig window locaitons on north elevation and addition of skylights, all not vislbe from street. | $450,000 |
| Sep 16, 2008 | Completed final sign-off Jun 2009 | 2920 22nd St | remove (e) exterior stair, (e) front door and concrete slab, construct new entry stairs, provide new front door, minor landscaping and new door to garage.Details
remove (e) exterior stair, (e) front door and concrete slab, construct new entry stairs, provide new front door, minor landscaping and new door to garage. | $25,000 | |
| Apr 3, 2008 | Completed final sign-off Nov 2008 | 1501 Mariposa St | U M B Engineering Inc Dba U M B Corporat | 2nd floor, #200: office interior remoded, scope includes new electrical, plumbing, interior partitions, and monolithic glass walls.Details
2nd floor, #200: office interior remoded, scope includes new electrical, plumbing, interior partitions, and monolithic glass walls. | $200,000 |
| Sep 13, 2007 | Expired or cancelled expired May 2009 | 245 Edgewood Av | revision to pa #2006-05-30-2678 to reduce scope of work. change structural design and change engineer of record.Details
revision to pa #2006-05-30-2678 to reduce scope of work. change structural design and change engineer of record. |