Mark Hogan
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Openscope Studio
- Based in
- San Francisco
- On San Francisco permits
- Nov 2015 to Sep 2026
180 permits since 2000 (architect on 177 permits, engineer on 2 permits, authorized agent-others on 1 permit): 84 completed, 38 in progress, 41 never finaled, 17 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 180.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 2033 Leavenworth St | unit b: 9.6sf addition to unit b, under (e) roof.Details
unit b: 9.6sf addition to unit b, under (e) roof. | $1,000 | |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 1801 California St | revision to 201811206437, creating minor layout revisions to units 34 and 35. no work proposed at exterior.Details
revision to 201811206437, creating minor layout revisions to units 34 and 35. no work proposed at exterior. | ||
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 1708 Cabrillo St | interior remodel 3fl to kitchen to be relocated one bathroom to be remodeled and one bahtrooom to be added . new electrical heat pump hvac to be installed. 3x (n) skylights to be added , 1 (e) skyulight to be replaced and downsized. no changes to front facade. 2 window replacement in lightwell.Details
interior remodel 3fl to kitchen to be relocated one bathroom to be remodeled and one bahtrooom to be added . new electrical heat pump hvac to be installed. 3x (n) skylights to be added , 1 (e) skyulight to be replaced and downsized. no changes to front facade. 2 window replacement in lightwell. | $250,000 | |
| Aug 25, 2026 | In progress issued Sep 2026 | 1813 15th St | Frontside Construction | to address complaint #2025006321 enf: unit count restored to 6 units. 2 kitchens reinstalled per permit bpa #201808066527 to their original configuration. additional reconfigure kitchens in 1813 and 1815b and 1817b. englarge bathrooms to add a shower in units 1815b and 1817bDetails
to address complaint #2025006321 enf: unit count restored to 6 units. 2 kitchens reinstalled per permit bpa #201808066527 to their original configuration. additional reconfigure kitchens in 1813 and 1815b and 1817b. englarge bathrooms to add a shower in units 1815b and 1817b | $40,000 |
| Jul 17, 2026 | In progress filed Jul 2026, not yet issued | 1801 California St | rev to pa# 2018-1120-6437: reconfigure electrical room, adding a door at the sidewalk, and providing a built up floor in the electrical room to aliegn withthe side walk.Details
rev to pa# 2018-1120-6437: reconfigure electrical room, adding a door at the sidewalk, and providing a built up floor in the electrical room to aliegn withthe side walk. | ||
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 1779 46th Av | 2 story horizontal addition to the rear of the house, partial interior remodel, including a kitchen remodel and powder room, and removal of stair at front facade to relocate the front door at the groundDetails
2 story horizontal addition to the rear of the house, partial interior remodel, including a kitchen remodel and powder room, and removal of stair at front facade to relocate the front door at the ground | $276,558 | |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 2100 Jackson St | revision to pa# 202502069777. changes to structural floor framing & shear wall design noted as rev 3 on sheets s100, s101 & s301. no architectural changes. pre app notes from original permit included in this set for reference.Details
revision to pa# 202502069777. changes to structural floor framing & shear wall design noted as rev 3 on sheets s100, s101 & s301. no architectural changes. pre app notes from original permit included in this set for reference. | ||
| Jun 26, 2026 | In progress filed Jun 2026, not yet issued | 1801 California St | unit 31: a revision to permit 201808096953 - a remodel of the (e) ground floor unit 31. expanding the unit into the (e) adjacent storage areas. no change to front facade.Details
unit 31: a revision to permit 201808096953 - a remodel of the (e) ground floor unit 31. expanding the unit into the (e) adjacent storage areas. no change to front facade. | $60,000 | |
| Jun 25, 2026 | In progress issued Jul 2026 | 3763 Cesar Chavez St | Speedy Building And Construction | front bldg - remodeling unit 3763 including reconfiguring the kitchen; converting the sunroom into a bedroom, replace existing transom & doors to the rear deck; remodeling the (e) bathroom and adding another @ 2nd floor.Details
front bldg - remodeling unit 3763 including reconfiguring the kitchen; converting the sunroom into a bedroom, replace existing transom & doors to the rear deck; remodeling the (e) bathroom and adding another @ 2nd floor. | $50,000 |
| Jun 5, 2026 | In progress issued Sep 2026 | 906 Broadway | L E C A Construction Llc | conditional use authorization per 2024-002799prj, converting a vacant church from an institutional use to event space. cou to general entertainment. scope includes removal of (e) non conforming rr at rear yard, add of n rrs in basement remoce e stair from rear yard to basement, add n int stairDetails
conditional use authorization per 2024-002799prj, converting a vacant church from an institutional use to event space. cou to general entertainment. scope includes removal of (e) non conforming rr at rear yard, add of n rrs in basement remoce e stair from rear yard to basement, add n int stair | $220,000 |
| Jun 3, 2026 | In progress filed Jun 2026, not yet issued | 259 Maynard St | add an interior stair connecting the (e) level 1 with the (e) basement. convert the storage area in the basement into habitable space. replace the (e) furnace & water heater & remove the (e) exteior wd stair at the rear yard.Details
add an interior stair connecting the (e) level 1 with the (e) basement. convert the storage area in the basement into habitable space. replace the (e) furnace & water heater & remove the (e) exteior wd stair at the rear yard. | $181,000 | |
| May 28, 2026 | In progress issued Jun 2026 | 943 South Van Ness Av | L E C A Construction Llc | replacing 4 bedroom windows to meet sill ht & eero requipments. window sizes and materials to match similar existing windows on 3rd floor.Details
replacing 4 bedroom windows to meet sill ht & eero requipments. window sizes and materials to match similar existing windows on 3rd floor. | $18,000 |
| Feb 19, 2026 | In progress filed Feb 2026, not yet issued | 1485 Clay St | add four adu's to the ground floor. repair of the (e) brick facade in conjunction with the seismic retrofit, under separate permit.Details
add four adu's to the ground floor. repair of the (e) brick facade in conjunction with the seismic retrofit, under separate permit. | $800,000 | |
| Jan 29, 2026 | In progress issued Jul 2026 | 320 14th St | Hl81 Construction Inc. | legalization of 2 units: 320 & 324, through the adu program (sfpc 207.1).Details
legalization of 2 units: 320 & 324, through the adu program (sfpc 207.1). | $134,000 |
| Jan 13, 2026 | In progress issued Aug 2026 | 2100 Jackson St | J S Builders Llc | renovation of common areas including the addition of a restroom and a lift and construction of a pedestrian connection to existing detached garage. creation of new pedestrian exit from the garage. renoof interiors of units 1b and 1c, including replacement windows.Details
renovation of common areas including the addition of a restroom and a lift and construction of a pedestrian connection to existing detached garage. creation of new pedestrian exit from the garage. renoof interiors of units 1b and 1c, including replacement windows. | $1,145,002 |
| Dec 17, 2025 | In progress issued Sep 2026 | 2100 Jackson St | J S Builders Llc | unit 9; renovation of including one kitchen, one bathroom, one powder room. addition of three non-street facing windows and improvments to existing roof deck. replacment of existing windows and patio door.Details
unit 9; renovation of including one kitchen, one bathroom, one powder room. addition of three non-street facing windows and improvments to existing roof deck. replacment of existing windows and patio door. | $118,954 |
| Dec 12, 2025 | In progress issued Sep 2026 | 2100 Jackson St | J S Builders Llc | unit #7: non-structural, interior remodel of unit #7 including remodel of 1 kitchen and 4 bathrooms.Details
unit #7: non-structural, interior remodel of unit #7 including remodel of 1 kitchen and 4 bathrooms. | $464,000 |
| Dec 12, 2025 | In progress issued Aug 2026 | 2100 Jackson St | J S Builders Llc | unit #5: interior remodel of unit #5. remodel of 1 kitchen and 3 bathrooms.Details
unit #5: interior remodel of unit #5. remodel of 1 kitchen and 3 bathrooms. | $444,000 |
| Dec 12, 2025 | In progress issued Sep 2026 | 2100 Jackson St | J S Builders Llc | unit #6: interior remodel of unit #6. remodel of 1 kitchen and 4 bathrooms.Details
unit #6: interior remodel of unit #6. remodel of 1 kitchen and 4 bathrooms. | $464,000 |
| Dec 12, 2025 | In progress issued Mar 2026 | 1995 Union St | Rescom Realty And Development Llc | revision to pa 202411205363 removing the staff room & installing dedicated men & women dressing rooms with 2 showers in each room no changes proposed to exteriorDetails
revision to pa 202411205363 removing the staff room & installing dedicated men & women dressing rooms with 2 showers in each room no changes proposed to exterior | $71,000 |
| Dec 10, 2025 | In progress issued Jul 2026 | 2100 Jackson St | J S Builders Llc | unit#3: renovation of the interior of unit#3. remodel of one kitchen and four bathroomsDetails
unit#3: renovation of the interior of unit#3. remodel of one kitchen and four bathrooms | $393,000 |
| Dec 9, 2025 | In progress issued Jul 2026 | 2100 Jackson St | J S Builders Llc | unit 2- remodel interior to include remodel kitchen and 4 bathroomsDetails
unit 2- remodel interior to include remodel kitchen and 4 bathrooms | $393,000 |
| Dec 5, 2025 | In progress issued Jul 2026 | 2100 Jackson St | J S Builders Llc | unit 1a: interior remodel including remodel of kitchen and 1 bathroom. no exterior or structural work.Details
unit 1a: interior remodel including remodel of kitchen and 1 bathroom. no exterior or structural work. | $165,000 |
| Dec 5, 2025 | In progress issued Jul 2026 | 2100 Jackson St | J S Builders Llc | unit 1: interior remodel including remodel of kitchen and 3 bathrooms. no exterior or structural work.Details
unit 1: interior remodel including remodel of kitchen and 3 bathrooms. no exterior or structural work. | $189,000 |
| Dec 4, 2025 | In progress issued Sep 2026 | 2100 Jackson St | J S Builders Llc | unit #8: renovation of interior of unit #4. remodel of kitchen and 4 bathrooms.Details
unit #8: renovation of interior of unit #4. remodel of kitchen and 4 bathrooms. | $860,000 |
| Dec 2, 2025 | In progress issued Aug 2026 | 2100 Jackson St | J S Builders Llc | unit 4: renovation of interior, wood window sashes replaced in-kind, remodel of kitchen & 4 bathroomsDetails
unit 4: renovation of interior, wood window sashes replaced in-kind, remodel of kitchen & 4 bathrooms | $260,000 |
| Nov 21, 2025 | Expired or cancelled cancelled Dec 2025 | 2100 Jackson St | renovation of common areas including the addition of a restroom and a lift.construction of ped connection to (e) detached garage and new ped exit. renovation of int unit 1b & 1c including wdws.Details
renovation of common areas including the addition of a restroom and a lift.construction of ped connection to (e) detached garage and new ped exit. renovation of int unit 1b & 1c including wdws. | $1,145,002 | |
| Nov 14, 2025 | In progress issued Jul 2026 | 69 Sharon St | L E C A Construction Llc | interior remodel to include kitchen, bathroom, addition of a bathroom & bedroom. in kind replacements & hydronic heatDetails
interior remodel to include kitchen, bathroom, addition of a bathroom & bedroom. in kind replacements & hydronic heat | $60,000 |
| Oct 31, 2025 | In progress issued Jul 2026 | 67 Sharon St | L E C A Construction Llc | scope of work is an interor remodel to include kitchen, bathroom, and replace doors to rear yard and addition of 2 (n) skylights. windows replaced in kind. no change to front facade .Details
scope of work is an interor remodel to include kitchen, bathroom, and replace doors to rear yard and addition of 2 (n) skylights. windows replaced in kind. no change to front facade . | $65,000 |
| Oct 27, 2025 | In progress issued Jul 2026 | 71 Sharon St | L E C A Construction Llc | interior renovation to 71 sharon st including a kitchen remodel, bathroom addition, laundry room relocation, and expanded building envelope under (e) soffit. seismic strengthening at the ground floor.Details
interior renovation to 71 sharon st including a kitchen remodel, bathroom addition, laundry room relocation, and expanded building envelope under (e) soffit. seismic strengthening at the ground floor. | $64,000 |
| Oct 2, 2025 | Completed final sign-off Feb 2026 | 229 Chattanooga St | Sandbank Construction, Inc | revision to 202508294235 to gas & electrical wall heaters to be replaced w/ heat pump split system. bathrooom layout reconfiguredDetails
revision to 202508294235 to gas & electrical wall heaters to be replaced w/ heat pump split system. bathrooom layout reconfigured | $10,000 |
| Aug 29, 2025 | Completed final sign-off Feb 2026 | 229 Chattanooga St | Sandbank Construction, Inc | interior remodel, including kitchen and bathroom with new finishes, cabinetry and appliances. all new wiring, electric heat pump to replace existing heat. no structural work, no changes visible from street.Details
interior remodel, including kitchen and bathroom with new finishes, cabinetry and appliances. all new wiring, electric heat pump to replace existing heat. no structural work, no changes visible from street. | $43,000 |
| Aug 1, 2025 | In progress filed Aug 2025, not yet issued | 1485 Clay St | revision to permit 202211166652. fire damage repair. no new rooms, renovation of 11 apartments. replace in kind kitchen + bathrooms, lighting, electric w/all heating, windows. revision: add washer/dryers to every unit, remove wall b/w kitchne + lving and add closets to units 3,8 and 9. infillDetails
revision to permit 202211166652. fire damage repair. no new rooms, renovation of 11 apartments. replace in kind kitchen + bathrooms, lighting, electric w/all heating, windows. revision: add washer/dryers to every unit, remove wall b/w kitchne + lving and add closets to units 3,8 and 9. infill | ||
| Jun 27, 2025 | Completed final sign-off Jun 2026 | 906 Broadway | permit to abate nov 202421513 & 2024-002795 enf to remove masaic tile on facade, waterproof & reinstall mosaic tile per preservationDetails
permit to abate nov 202421513 & 2024-002795 enf to remove masaic tile on facade, waterproof & reinstall mosaic tile per preservation | $25,000 | |
| Apr 14, 2025 | In progress issued Jun 2025 | 1801 California St | Sandbank Construction, Inc | revision to pa# 201811206437: removing a bedroom in unit #34 and adding a trash room in that location - no work proposed at exterior at public way.Details
revision to pa# 201811206437: removing a bedroom in unit #34 and adding a trash room in that location - no work proposed at exterior at public way. | $7,500 |
| Mar 11, 2025 | In progress issued Jun 2026 | 2100 Jackson St | D M Ravano Construction | scope of work is to perform a voluntary seismic retrofit of the existing multifamily building at 2100 jackson st.Details
scope of work is to perform a voluntary seismic retrofit of the existing multifamily building at 2100 jackson st. | $904,000 |
| Nov 20, 2024 | In progress issued Jan 2025 | 1995 Union St | Rescom Realty And Development Llc | t.i. change of use from bank to gym (b to a-3 occupancy) no changes proposed to exterior. addition of 3 dressing rms, 1 staff rm, 1 water bottle fill station at ground fl. no juice bar & no hot tub.Details
t.i. change of use from bank to gym (b to a-3 occupancy) no changes proposed to exterior. addition of 3 dressing rms, 1 staff rm, 1 water bottle fill station at ground fl. no juice bar & no hot tub. | $15,000 |
| Oct 2, 2024 | Completed final sign-off Dec 2024 | 3949 21st St | interior remodel of upper unit to rearrance kitchen and bathroom layouts. no exterior changes proposedDetails
interior remodel of upper unit to rearrance kitchen and bathroom layouts. no exterior changes proposed | $100,000 | |
| Aug 15, 2024 | Completed final sign-off Jan 2025 | 1512 Irving St | Rescom Realty And Development Llc | the scope of work is to remove and replace the (e) entry doors to power to retail space at ground floor and provide power door operators at door per da-04/05 to comply w/the sf abe program. ref abe 201912169966Details
the scope of work is to remove and replace the (e) entry doors to power to retail space at ground floor and provide power door operators at door per da-04/05 to comply w/the sf abe program. ref abe 201912169966 | $3,500 |
| Aug 15, 2024 | Completed final sign-off Jan 2025 | 1500 Irving St | Rescom Realty And Development Llc | the scope of work is to remove and replace the (e) entry doors to power to the restaurant at ground floor and provide power door operators at door per da-04/05 to comply w/the sf abe program. ref abe 201912169965Details
the scope of work is to remove and replace the (e) entry doors to power to the restaurant at ground floor and provide power door operators at door per da-04/05 to comply w/the sf abe program. ref abe 201912169965 | $3,500 |
| Aug 14, 2024 | Completed final sign-off Mar 2025 | 154 Tiffany Av | rev 201910023377- maintain original occupancy of r-3 per fs 12 and update the code standard to 2022 codes. deferred sprinkler design per ab-20 under separate permit. ground floor sprinklered to nfpa 13d voluntarily.Details
rev 201910023377- maintain original occupancy of r-3 per fs 12 and update the code standard to 2022 codes. deferred sprinkler design per ab-20 under separate permit. ground floor sprinklered to nfpa 13d voluntarily. | ||
| Jun 17, 2024 | Expired or cancelled withdrawn Jun 2026 | 3763 Cesar Chavez St | unit remodel with remodeled kitchen & 2 baths.Details
unit remodel with remodeled kitchen & 2 baths. | $50,000 | |
| Mar 25, 2024 | In progress filed Mar 2024, not yet issued | 154 Tiffany Av | revision to pa #20191002337 adminstrative permit to correct occupancy class from r-2 to r-3 per fs-12 and remove sprinkler scope.Details
revision to pa #20191002337 adminstrative permit to correct occupancy class from r-2 to r-3 per fs-12 and remove sprinkler scope. | ||
| Feb 29, 2024 | Completed final sign-off Jul 2024 | 1310 Mission St | revision to correct previously permitted occupant loads at 2nd floor, previous pa# 202305238363. add wall at reception and repair mezzanine stair.Details
revision to correct previously permitted occupant loads at 2nd floor, previous pa# 202305238363. add wall at reception and repair mezzanine stair. | ||
| Feb 8, 2024 | In progress issued Apr 2024 | 688 Guerrero St | Appetite For Construction Inc | renovate unit 688. kitchen remodel. addition of second bathroom. replace windows facing rear uard with patio door. in kind replacement of front door. all work at the ground floor unit.Details
renovate unit 688. kitchen remodel. addition of second bathroom. replace windows facing rear uard with patio door. in kind replacement of front door. all work at the ground floor unit. | $222,967 |
| Feb 2, 2024 | Completed final sign-off Apr 2024 | 3439 Sacramento St | O'dwyer Construction Inc | unit 403 revision to 202210255112 and 202310279700. changes include addition of 2 glass guardrail adjustments to planter and bench configuration.Details
unit 403 revision to 202210255112 and 202310279700. changes include addition of 2 glass guardrail adjustments to planter and bench configuration. | |
| Jan 23, 2024 | Expired or cancelled withdrawn Mar 2024 | 154 Tiffany Av | revision to bpa#201910023377 to remove sprinklers from scope per fs-12Details
revision to bpa#201910023377 to remove sprinklers from scope per fs-12 | ||
| Dec 8, 2023 | Completed final sign-off Mar 2024 | 3763 Cesar Chavez St | Ps2 Inc | replace heating w/mini split 6 units. all less than 250lbs. replace gas appliances w/ electric. no work visible from street. mep work only.Details
replace heating w/mini split 6 units. all less than 250lbs. replace gas appliances w/ electric. no work visible from street. mep work only. | $25,000 |
| Dec 7, 2023 | Completed final sign-off Dec 2025 | 4042 Fulton St | Blackline Construction | the scope of work is the add 1 adu to the storage area at the ground floor per sfpc 207(c)(4).Details
the scope of work is the add 1 adu to the storage area at the ground floor per sfpc 207(c)(4). | $110,000 |
| Dec 1, 2023 | Completed final sign-off Dec 2024 | 227 Chattanooga St | Sandbank Construction, Inc | basement storage area to be connected via internal stair to unit above, adding 2 bedrooms, 1 office, 2 baths.Details
basement storage area to be connected via internal stair to unit above, adding 2 bedrooms, 1 office, 2 baths. | $213,538 |
| Oct 27, 2023 | Completed final sign-off Apr 2024 | 3439 Sacramento St | O'dwyer Construction Inc | revision to pa 2022-1025-5112 changes include addition of a glass guardrail, adjustments to planter and bench configurationDetails
revision to pa 2022-1025-5112 changes include addition of a glass guardrail, adjustments to planter and bench configuration | |
| Oct 18, 2023 | In progress filed Oct 2023, not yet issued | 433 Baden St | Current Construction | removal of property line windows, and removal of chimney and eaves built over the property line to allow for construction of a new home on the adjacent parcel. new adjacent home approved under pa# 201807063945.Details
removal of property line windows, and removal of chimney and eaves built over the property line to allow for construction of a new home on the adjacent parcel. new adjacent home approved under pa# 201807063945. | $6,000 |
| Sep 14, 2023 | Completed final sign-off Jan 2024 | 4350 Kirkham St | 2b Living Inc | #306: like for like kitchen renovation, like for like bathroom renovation, new electrical for new circuits, extend to new locations, insulation (r-15) on exterior facing wall. (interior work only).Details
#306: like for like kitchen renovation, like for like bathroom renovation, new electrical for new circuits, extend to new locations, insulation (r-15) on exterior facing wall. (interior work only). | $60,000 |
| May 1, 2023 | In progress issued May 2024 | 1964 Post St | add two (2) new adu to the ground floor of the building under ordinance 162-16.Details
add two (2) new adu to the ground floor of the building under ordinance 162-16. | $309,148 | |
| Apr 27, 2023 | Completed final sign-off Oct 2025 | 4350 Kirkham St | L E C A Construction Llc | add six new accessory dwelling units to the ground floor of the bldg under ordinance 162-16 and planning code section 207(c)(4)Details
add six new accessory dwelling units to the ground floor of the bldg under ordinance 162-16 and planning code section 207(c)(4) | $716,872 |
| Apr 26, 2023 | Completed final sign-off Apr 2024 | 3439 Sacramento St | O'dwyer Construction Inc | unit #403: remove & replace existing windscreen at roof.Details
unit #403: remove & replace existing windscreen at roof. | $10,000 |
| Mar 27, 2023 | Never finaled filed Mar 2023, never issued | 1920 Franklin St | addition of 2 adus to ground floor per sfpc 207(c)(4).Details
addition of 2 adus to ground floor per sfpc 207(c)(4). | $171,600 | |
| Mar 27, 2023 | Never finaled filed Mar 2023, never issued | 1920 Franklin St | addition of 2 adus to rear carport per sfpc 207(c)(4).Details
addition of 2 adus to rear carport per sfpc 207(c)(4). | $163,400 | |
| Feb 27, 2023 | Completed final sign-off May 2024 | 1284 Page St | Aspect Builders Llc. | legalization of dwelling unit installed without a permit per ordinance no.43-14Details
legalization of dwelling unit installed without a permit per ordinance no.43-14 | $15,000 |
| Feb 6, 2023 | Completed final sign-off Jul 2023 | 390 29th Av | Ps2 Inc | revision to pa# 202006068211, adding step outisde unit.Details
revision to pa# 202006068211, adding step outisde unit. | $1,000 |
| Feb 3, 2023 | Expired or cancelled withdrawn Jun 2023 | 224 Kirkham St | demolition of 2-story, type vb, single family dwelling.Details
demolition of 2-story, type vb, single family dwelling. | $26,000 | |
| Feb 3, 2023 | Expired or cancelled withdrawn Jun 2023 | 224 Kirkham St | erect 4-story over zero basement, type va, residential building with 2 units and 1 adu at ground floor.Details
erect 4-story over zero basement, type va, residential building with 2 units and 1 adu at ground floor. | $1,025,200 | |
| Dec 23, 2022 | Never finaled filed Dec 2022, never issued | 2619 Mission St | add 8(n) dwellings units to the basement & level 1, demo & rebuild part of the fl @ level1;excavate the rear yard 10ft to the level of the (e)basement & add an extra stair for access to the lowered rear yard;add a laundry room to the basement,add a bike room to the basement,add a trash room @ level1Details
add 8(n) dwellings units to the basement & level 1, demo & rebuild part of the fl @ level1;excavate the rear yard 10ft to the level of the (e)basement & add an extra stair for access to the lowered rear yard;add a laundry room to the basement,add a bike room to the basement,add a trash room @ level1 | $1,350,000 | |
| Dec 22, 2022 | Never finaled filed Dec 2022, never issued | 5235 Diamond Heights Bl | add 7 new adus to the garage of building #2.per ordinance 162-16Details
add 7 new adus to the garage of building #2.per ordinance 162-16 | $630,000 | |
| Dec 21, 2022 | Never finaled issued Sep 2023, no final | 433 Baden St | Current Construction | replace (e) rear patio door & clerestory windows w/ new 3 stacking-sliding panel door; replace rear facade lighting in-kind; repair roof as req. in area work; repair (e) deck (less than 36" above grade) in-kindDetails
replace (e) rear patio door & clerestory windows w/ new 3 stacking-sliding panel door; replace rear facade lighting in-kind; repair roof as req. in area work; repair (e) deck (less than 36" above grade) in-kind | $15,000 |
| Dec 20, 2022 | Never finaled issued May 2023, no final | 775 Geary St | Rei Build Up Construction Corp | structural revision to permit 201612215550. clarification of structural support for relocated fire escaped drop down ladder that is previously permitted under 201612215550.Details
structural revision to permit 201612215550. clarification of structural support for relocated fire escaped drop down ladder that is previously permitted under 201612215550. | $7,000 |
| Dec 6, 2022 | Completed final sign-off Jan 2026 | 2898 Vallejo St | Ray Tom Construction Inc, Ashbury Gen Constructing & Eng | to abate planning code violation 2022-008073 enf and dbi nov 202293015 to remove the unpermitted 5th floor dormer at the north elevation and restore to approved condition in permit no. 201702239544 s/r2.Details
to abate planning code violation 2022-008073 enf and dbi nov 202293015 to remove the unpermitted 5th floor dormer at the north elevation and restore to approved condition in permit no. 201702239544 s/r2. | $10,000 |
| Nov 29, 2022 | Completed final sign-off Jan 2024 | 5285 Diamond Heights Bl | G J Chavez Inc | renovate (e) leasing office, business center & fitness areas, remodel 2 ada bathrooms, remove misc partitons, install millwork at entry hall and business center and replace 2 doors at entryDetails
renovate (e) leasing office, business center & fitness areas, remodel 2 ada bathrooms, remove misc partitons, install millwork at entry hall and business center and replace 2 doors at entry | $64,000 |
| Nov 29, 2022 | Never finaled issued Sep 2023, no final | 5285 Diamond Heights Bl | B-Side Inc. | add exterior ada lift adjacent to diamond heights blvd sidewalk. no changes to sidewalk or public way proposedDetails
add exterior ada lift adjacent to diamond heights blvd sidewalk. no changes to sidewalk or public way proposed | $30,000 |
| Nov 10, 2022 | Never finaled filed Nov 2022, never issued | 419 Baden St | convert (e) crawl space to addtional living space & associated structural work. remodel of upper floors.Details
convert (e) crawl space to addtional living space & associated structural work. remodel of upper floors. | $360,766 | |
| Oct 25, 2022 | Completed final sign-off Apr 2024 | 3439 Sacramento St | O'dwyer Construction Inc | ste.403: demo and reinstall (e) roof deck for the purpose of reroofing. ref permit 202209122261Details
ste.403: demo and reinstall (e) roof deck for the purpose of reroofing. ref permit 202209122261 | $22,000 |
| Aug 1, 2022 | Completed final sign-off Dec 2022 | 839 Broderick St | Axa Construction | unit 1: remodel (1) bedroom into (3) bedrooms w/ remodeled kitchen & bathroom, (1) new additional bathroom.Details
unit 1: remodel (1) bedroom into (3) bedrooms w/ remodeled kitchen & bathroom, (1) new additional bathroom. | $43,000 |
| Jul 22, 2022 | In progress issued Mar 2024 | 1965 Page St | add 3 adu to the rear carports of the bldg per ordinance 162-16.Details
add 3 adu to the rear carports of the bldg per ordinance 162-16. | $390,000 | |
| Mar 24, 2022 | Completed final sign-off Jan 2024 | 1023 Stanyan St | change of use from retail grocery to retail professional services. no work/no construction.Details
change of use from retail grocery to retail professional services. no work/no construction. | ||
| Mar 22, 2022 | Never finaled issued Mar 2022, no final | 775 Geary St | Rei Build Up Construction Corp | revision to bpa# 201612215550-s1. adjustments needed in path of travel due to site conditions found during construction & storage areas.Details
revision to bpa# 201612215550-s1. adjustments needed in path of travel due to site conditions found during construction & storage areas. | |
| Feb 28, 2022 | Completed final sign-off May 2022 | 1677 Bush St | Trim Fit Constr. - O'reilly Engineering | units 7,14,21: interior remodel to move kitchens and convert to bedrooms. no change to exterior.Details
units 7,14,21: interior remodel to move kitchens and convert to bedrooms. no change to exterior. | $44,525 |
| Feb 11, 2022 | Never finaled issued Feb 2022, no final | 901 Valencia St | Nomellini Construction * Ask For Id * | apt 9: relocate (e) kitchen to other side of wall. revision to pa#202110210901Details
apt 9: relocate (e) kitchen to other side of wall. revision to pa#202110210901 | |
| Feb 4, 2022 | Completed final sign-off Jan 2024 | 1013 Stanyan St | Lawrence Fraser Construction | remodel ground floor to add partitions & accessible restrooms, one restroom in unit #1013 & one restroom in unit #1023. powered door operators @ entrances permitted in bpa#201908068028. framing & other work under bpa#202009265126Details
remodel ground floor to add partitions & accessible restrooms, one restroom in unit #1013 & one restroom in unit #1023. powered door operators @ entrances permitted in bpa#201908068028. framing & other work under bpa#202009265126 | $27,000 |
| Dec 28, 2021 | Completed final sign-off Jul 2023 | 390 29th Av | Ps2 Inc | revision to pa 202006068211 and includes the addition of a range and dishwasher to the kitchen at unit b.Details
revision to pa 202006068211 and includes the addition of a range and dishwasher to the kitchen at unit b. | |
| Dec 16, 2021 | Completed final sign-off Dec 2023 | 57 Rosemont Pl | Dmg Enterprises Inc | revision to permit 202011189218. to add showers to home office restrooms and replace additional 11 windows.Details
revision to permit 202011189218. to add showers to home office restrooms and replace additional 11 windows. | $4,000 |
| Dec 14, 2021 | Never finaled issued Dec 2022, no final | 1950 Franklin St | Doherty Restoration, Inc. | addition of 4 new accessory dwelling units (adus) to an existing garage per ca state adu law and renovate an existing storage space to relocate parking. site permit: noDetails
addition of 4 new accessory dwelling units (adus) to an existing garage per ca state adu law and renovate an existing storage space to relocate parking. site permit: no | $345,000 |
| Nov 23, 2021 | Completed final sign-off May 2023 | 3035 Baker St | Doherty Restoration, Inc. | revision to 202008081395: adding an office to unit c, removing the court @ the notrth. reducing the size of the sunken patio in rear yard. change in mech system from ridiators to hini splitsDetails
revision to 202008081395: adding an office to unit c, removing the court @ the notrth. reducing the size of the sunken patio in rear yard. change in mech system from ridiators to hini splits | |
| Sep 20, 2021 | Completed final sign-off Oct 2021 | 2350 Washington St | administrative permit to update unit count. pa 201803295045 (legalization) and 201805017882 (adu) are both finished. there are now 11 total units in the building. original cfc336293 is 9 units.Details
administrative permit to update unit count. pa 201803295045 (legalization) and 201805017882 (adu) are both finished. there are now 11 total units in the building. original cfc336293 is 9 units. | ||
| Aug 12, 2021 | Completed final sign-off Jul 2022 | 1686 Market St | Emcor Services/Mesa Energy Systems Inc | revision of structural element to pa #2019 0509 0211.Details
revision of structural element to pa #2019 0509 0211. | $1,000 |
| Jul 21, 2021 | Never finaled issued Mar 2022, no final | 150 Anzavista Av | Bao Hengda Inc | the scope of work is to convert an existing recreation room into an adu per the multi-family ministerial state adu law. no waivers required. sprinkler under separate permit.Details
the scope of work is to convert an existing recreation room into an adu per the multi-family ministerial state adu law. no waivers required. sprinkler under separate permit. | $90,000 |
| Mar 23, 2021 | Never finaled issued May 2021, no final | 371 Turk St | Trim Fit Constr. - O'reilly Engineering | remove windows at property line.Details
remove windows at property line. | $20,000 |
| Feb 5, 2021 | Never finaled issued Jul 2021, no final | 2255 Judah St | Ps2 Inc | the scope of work is to install signage to the storefront of a learning center.Details
the scope of work is to install signage to the storefront of a learning center. | $500 |
| Jan 28, 2021 | Completed final sign-off Sep 2022 | 24 Jasper Pl | Perez Construction Llc. | the scope of the project is to add one new accessory dwelling unit to the existing ground level as per ordinance no. 162-16.Details
the scope of the project is to add one new accessory dwelling unit to the existing ground level as per ordinance no. 162-16. | $49,970 |
| Jan 19, 2021 | Never finaled filed Jan 2021, never issued | 954 Geary St | Silverman Green Development | add one streamlined attached accessory dwelling unit within an existing multi-family dwelling per section 65852.2 of the ca government code.Details
add one streamlined attached accessory dwelling unit within an existing multi-family dwelling per section 65852.2 of the ca government code. | $83,000 |
| Dec 8, 2020 | Completed final sign-off Feb 2024 | 1720 Leavenworth St | Sandbank Construction, Inc | the scope of the work is to add three new accessory dwelling units to the ground floor per ordinance no. 162-16. there will be two studio units and one one-bedroom unit.Details
the scope of the work is to add three new accessory dwelling units to the ground floor per ordinance no. 162-16. there will be two studio units and one one-bedroom unit. | $210,000 |
| Nov 23, 2020 | Never finaled filed Nov 2020, never issued | 325 09th Av | add 2 new adus to the rear portion of level 1 per ordinance no. 162-16.Details
add 2 new adus to the rear portion of level 1 per ordinance no. 162-16. | $345,000 | |
| Nov 18, 2020 | Completed final sign-off Dec 2023 | 57 Rosemont Pl | conversion of storage space into home offices plus two half baths.Details
conversion of storage space into home offices plus two half baths. | $105,000 | |
| Nov 18, 2020 | Completed final sign-off Jul 2021 | 839 Broderick St | Ps2 Inc | unit #2: remodel a one bedroom unit into a 3-bedroom unit with remodeled kitchen, bathroom and new additional bathroom.Details
unit #2: remodel a one bedroom unit into a 3-bedroom unit with remodeled kitchen, bathroom and new additional bathroom. | $43,000 |
| Nov 18, 2020 | Never finaled issued Dec 2020, no final | 775 Geary St | Rei Build Up Construction Corp | revision to pa 201612215550. adu heating systems changed to electric resistance heaters compliant w/ ca energy code exceptions 3 & 4 of section 140.4 gDetails
revision to pa 201612215550. adu heating systems changed to electric resistance heaters compliant w/ ca energy code exceptions 3 & 4 of section 140.4 g | |
| Nov 13, 2020 | Never finaled issued Sep 2022, no final | 660 Clipper St | alter site to permit project application number 201612225672, an addition of adus (9 units) at the ground level per ordinance 162-16.Details
alter site to permit project application number 201612225672, an addition of adus (9 units) at the ground level per ordinance 162-16. | $1,030,000 | |
| Nov 12, 2020 | Never finaled filed Nov 2020, never issued | 301 Valencia St | the scope of the work is to add 4 new accessory dwelling units to the rear portion of the basement per ordinance no. 162-16. a courtyard will be added in the rear yard to provide exposure for the units.Details
the scope of the work is to add 4 new accessory dwelling units to the rear portion of the basement per ordinance no. 162-16. a courtyard will be added in the rear yard to provide exposure for the units. | $597,440 | |
| Nov 12, 2020 | Completed final sign-off Jun 2022 | 123 Ripley St | revision to bpa#2016-1115-2705. the scope of the work is to add one accessory dwelling unit to level 1 of the rear area of north portion of the building per section 65852.2 of the ca government code. no waivers required. this permit will superseding permit 2016-1115-2705 work scope.Details
revision to bpa#2016-1115-2705. the scope of the work is to add one accessory dwelling unit to level 1 of the rear area of north portion of the building per section 65852.2 of the ca government code. no waivers required. this permit will superseding permit 2016-1115-2705 work scope. | $111,720 | |
| Oct 17, 2020 | Completed final sign-off Jul 2022 | 24 Jasper Pl | Perez Construction Llc. | revision to 3 ground floor adus permitted under pa 201608054342 & 201702088949. no revisions visible from the street.Details
revision to 3 ground floor adus permitted under pa 201608054342 & 201702088949. no revisions visible from the street. | |
| Oct 17, 2020 | Completed final sign-off Oct 2022 | 156 Tiffany Av | Rozen Home Builders Inc | add 6 dormers in compliance to zoning administrator bulletin no.3 and an interior remodel of the 4th floor. and kitchen renovation at the 3rd floor (sep permit 202009214611).Details
add 6 dormers in compliance to zoning administrator bulletin no.3 and an interior remodel of the 4th floor. and kitchen renovation at the 3rd floor (sep permit 202009214611). | $110,000 |
| Oct 15, 2020 | Never finaled issued Mar 2021, no final | 16 Valencia St | revision to commercial storeront proposed in pa # 201807305921s.Details
revision to commercial storeront proposed in pa # 201807305921s. | $10,000 |