Permit GraphShortlistSan Francisco building permits since 2000

Mark Hogan

License
C33268
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C33268 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, engineer
Firm
Openscope Studio
Based in
San Francisco
On San Francisco permits
Nov 2015 to Nov 2026

181 permits since 2000 (architect on 178 permits, engineer on 2 permits, authorized agent-others on 1 permit): 85 completed, 37 in progress, 42 never finaled, 17 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
J S Builders Llc (11), L E C A Construction Llc (6), Ps2 Inc (5), Sandbank Construction, Inc (5), O'dwyer Construction Inc (4), Rescom Realty And Development Llc (4), Rei Build Up Construction Corp (3), Current Construction (2), Doherty Restoration, Inc. (2), Perez Construction Llc. (2), Stone And Stryder Llc (2), Trim Fit Constr. - O'reilly Engineering (2), 2b Living Inc, All Best Buildrs.Inc./All Trusty Bldrs., Appetite For Construction Inc, Ashbury Gen Constructing & Eng, Aspect Builders Llc., Axa Construction, B-Side Inc., Bao Hengda Inc, Blackline Construction, D M Ravano Construction, Dmg Enterprises Inc, Emcor Services/Mesa Energy Systems Inc, Frontside Construction, G J Chavez Inc, Hl81 Construction Inc., Lawrence Fraser Construction, Nomellini Construction * Ask For Id *, Ray Tom Construction Inc, Rozen Home Builders Inc, Silverman Green Development, Speedy Building And Construction
Architects
Jason Powers
Engineers
Max E Saiidnias (7), Skot Mcdaniel (5), David Hensel (3), Ali Afrasiabi (2), Joseph Gulden (2), Parviz Saeednia (2), Don David, Donald David, Dustin Muhn, Kevin O'sullivan, Michael O'brien, Parviz Saeednia, Rod Massoudi, Ryan Bogart, Shaun Moynahan

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

Showing the 100 most recent of 181.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 10, 2026In progress
issued Nov 2026
2833 Fillmore Stabatement of 2019-019760enf and 2026-007932enf front fence and gate replacement and deck demolition.
Details
Permit
202611100575
Permit issued
Nov 10, 2026

abatement of 2019-019760enf and 2026-007932enf front fence and gate replacement and deck demolition.

Open the permit page

$5,000
Sep 30, 2026In progress
filed Sep 2026, not yet issued
2033 Leavenworth Stunit b: 9.6sf addition to unit b, under (e) roof.
Details
Permit
202609308839

unit b: 9.6sf addition to unit b, under (e) roof.

Open the permit page

$1,000
Sep 18, 2026In progress
issued Oct 2026
1801 California StStone And Stryder Llcrevision to 201811206437, creating minor layout revisions to units 34 and 35. no work proposed at exterior.
Details
Permit
202609188350
Permit issued
Oct 6, 2026

revision to 201811206437, creating minor layout revisions to units 34 and 35. no work proposed at exterior.

Open the permit page

Sep 14, 2026In progress
issued Oct 2026
1708 Cabrillo StAll Best Buildrs.Inc./All Trusty Bldrs.interior remodel 3fl to kitchen to be relocated one bathroom to be remodeled and one bahtrooom to be added . new electrical heat pump hvac to be installed. 3x (n) skylights to be added , 1 (e) skyulight to be replaced and downsized. no changes to front facade. 2 window replacement in lightwell.
Details
Permit
202609148067
Permit issued
Oct 13, 2026

interior remodel 3fl to kitchen to be relocated one bathroom to be remodeled and one bahtrooom to be added . new electrical heat pump hvac to be installed. 3x (n) skylights to be added , 1 (e) skyulight to be replaced and downsized. no changes to front facade. 2 window replacement in lightwell.

Open the permit page

$250,000
Aug 25, 2026Completed
final sign-off Oct 2026
1813 15th StFrontside Constructionto address complaint #2025006321 enf: unit count restored to 6 units. 2 kitchens reinstalled per permit bpa #201808066527 to their original configuration. additional reconfigure kitchens in 1813 and 1815b and 1817b. englarge bathrooms to add a shower in units 1815b and 1817b
Details
Permit
202608257151
Permit issued
Sep 22, 2026
Final sign-off
Oct 22, 2026

to address complaint #2025006321 enf: unit count restored to 6 units. 2 kitchens reinstalled per permit bpa #201808066527 to their original configuration. additional reconfigure kitchens in 1813 and 1815b and 1817b. englarge bathrooms to add a shower in units 1815b and 1817b

Open the permit page

$40,000
Jul 17, 2026In progress
issued Oct 2026
1801 California StStone And Stryder Llcrev to pa# 2018-1120-6437: reconfigure electrical room, adding a door at the sidewalk, and providing a built up floor in the electrical room to aliegn withthe side walk.
Details
Permit
202607175212
Permit issued
Oct 13, 2026

rev to pa# 2018-1120-6437: reconfigure electrical room, adding a door at the sidewalk, and providing a built up floor in the electrical room to aliegn withthe side walk.

Open the permit page

Jul 15, 2026In progress
filed Jul 2026, not yet issued
1779 46th Av2 story horizontal addition to the rear of the house, partial interior remodel, including a kitchen remodel and powder room, and removal of stair at front facade to relocate the front door at the ground
Details
Permit
202606304362

2 story horizontal addition to the rear of the house, partial interior remodel, including a kitchen remodel and powder room, and removal of stair at front facade to relocate the front door at the ground

Open the permit page

$276,558
Jul 14, 2026In progress
filed Jul 2026, not yet issued
2100 Jackson Strevision to pa# 202502069777. changes to structural floor framing & shear wall design noted as rev 3 on sheets s100, s101 & s301. no architectural changes. pre app notes from original permit included in this set for reference.
Details
Permit
202606304325

revision to pa# 202502069777. changes to structural floor framing & shear wall design noted as rev 3 on sheets s100, s101 & s301. no architectural changes. pre app notes from original permit included in this set for reference.

Open the permit page

Jun 26, 2026In progress
filed Jun 2026, not yet issued
1801 California Stunit 31: a revision to permit 201808096953 - a remodel of the (e) ground floor unit 31. expanding the unit into the (e) adjacent storage areas. no change to front facade.
Details
Permit
202606264047

unit 31: a revision to permit 201808096953 - a remodel of the (e) ground floor unit 31. expanding the unit into the (e) adjacent storage areas. no change to front facade.

Open the permit page

$60,000
Jun 25, 2026In progress
issued Jul 2026
3763 Cesar Chavez StSpeedy Building And Constructionfront bldg - remodeling unit 3763 including reconfiguring the kitchen; converting the sunroom into a bedroom, replace existing transom & doors to the rear deck; remodeling the (e) bathroom and adding another @ 2nd floor.
Details
Permit
202606253919
Permit issued
Jul 17, 2026

front bldg - remodeling unit 3763 including reconfiguring the kitchen; converting the sunroom into a bedroom, replace existing transom & doors to the rear deck; remodeling the (e) bathroom and adding another @ 2nd floor.

Open the permit page

$50,000
Jun 5, 2026In progress
issued Sep 2026
906 BroadwayL E C A Construction Llcconditional use authorization per 2024-002799prj, converting a vacant church from an institutional use to event space. cou to general entertainment. scope includes removal of (e) non conforming rr at rear yard, add of n rrs in basement remoce e stair from rear yard to basement, add n int stair
Details
Permit
202606052670
Permit issued
Sep 3, 2026

conditional use authorization per 2024-002799prj, converting a vacant church from an institutional use to event space. cou to general entertainment. scope includes removal of (e) non conforming rr at rear yard, add of n rrs in basement remoce e stair from rear yard to basement, add n int stair

Open the permit page

$220,000
Jun 3, 2026In progress
filed Jun 2026, not yet issued
259 Maynard Stadd an interior stair connecting the (e) level 1 with the (e) basement. convert the storage area in the basement into habitable space. replace the (e) furnace & water heater & remove the (e) exteior wd stair at the rear yard.
Details
Permit
202604300437

add an interior stair connecting the (e) level 1 with the (e) basement. convert the storage area in the basement into habitable space. replace the (e) furnace & water heater & remove the (e) exteior wd stair at the rear yard.

Open the permit page

$181,000
May 28, 2026In progress
issued Jun 2026
943 South Van Ness AvL E C A Construction Llcreplacing 4 bedroom windows to meet sill ht & eero requipments. window sizes and materials to match similar existing windows on 3rd floor.
Details
Permit
202605282095
Permit issued
Jun 2, 2026

replacing 4 bedroom windows to meet sill ht & eero requipments. window sizes and materials to match similar existing windows on 3rd floor.

Open the permit page

$18,000
Feb 19, 2026In progress
filed Feb 2026, not yet issued
1485 Clay Stadd four adu's to the ground floor. repair of the (e) brick facade in conjunction with the seismic retrofit, under separate permit.
Details
Permit
202512303035

add four adu's to the ground floor. repair of the (e) brick facade in conjunction with the seismic retrofit, under separate permit.

Open the permit page

$800,000
Jan 29, 2026In progress
issued Jul 2026
320 14th StHl81 Construction Inc.legalization of 2 units: 320 & 324, through the adu program (sfpc 207.1).
Details
Permit
202512040944
Permit issued
Jul 2, 2026

legalization of 2 units: 320 & 324, through the adu program (sfpc 207.1).

Open the permit page

$134,000
Jan 13, 2026In progress
issued Aug 2026
2100 Jackson StJ S Builders Llcrenovation of common areas including the addition of a restroom and a lift and construction of a pedestrian connection to existing detached garage. creation of new pedestrian exit from the garage. renoof interiors of units 1b and 1c, including replacement windows.
Details
Permit
202512161861
Permit issued
Aug 7, 2026

renovation of common areas including the addition of a restroom and a lift and construction of a pedestrian connection to existing detached garage. creation of new pedestrian exit from the garage. renoof interiors of units 1b and 1c, including replacement windows.

Open the permit page

$1,145,002
Dec 17, 2025In progress
issued Sep 2026
2100 Jackson StJ S Builders Llcunit 9; renovation of including one kitchen, one bathroom, one powder room. addition of three non-street facing windows and improvments to existing roof deck. replacment of existing windows and patio door.
Details
Permit
202512171996
Permit issued
Sep 1, 2026

unit 9; renovation of including one kitchen, one bathroom, one powder room. addition of three non-street facing windows and improvments to existing roof deck. replacment of existing windows and patio door.

Open the permit page

$118,954
Dec 12, 2025In progress
issued Sep 2026
2100 Jackson StJ S Builders Llcunit #7: non-structural, interior remodel of unit #7 including remodel of 1 kitchen and 4 bathrooms.
Details
Permit
202512121677
Permit issued
Sep 1, 2026

unit #7: non-structural, interior remodel of unit #7 including remodel of 1 kitchen and 4 bathrooms.

Open the permit page

$464,000
Dec 12, 2025In progress
issued Aug 2026
2100 Jackson StJ S Builders Llcunit #5: interior remodel of unit #5. remodel of 1 kitchen and 3 bathrooms.
Details
Permit
202512121668
Permit issued
Aug 5, 2026

unit #5: interior remodel of unit #5. remodel of 1 kitchen and 3 bathrooms.

Open the permit page

$444,000
Dec 12, 2025In progress
issued Sep 2026
2100 Jackson StJ S Builders Llcunit #6: interior remodel of unit #6. remodel of 1 kitchen and 4 bathrooms.
Details
Permit
202512121676
Permit issued
Sep 1, 2026

unit #6: interior remodel of unit #6. remodel of 1 kitchen and 4 bathrooms.

Open the permit page

$464,000
Dec 12, 2025In progress
issued Mar 2026
1995 Union StRescom Realty And Development Llcrevision to pa 202411205363 removing the staff room & installing dedicated men & women dressing rooms with 2 showers in each room no changes proposed to exterior
Details
Permit
202512121642
Permit issued
Mar 24, 2026

revision to pa 202411205363 removing the staff room & installing dedicated men & women dressing rooms with 2 showers in each room no changes proposed to exterior

Open the permit page

$71,000
Dec 10, 2025In progress
issued Jul 2026
2100 Jackson StJ S Builders Llcunit#3: renovation of the interior of unit#3. remodel of one kitchen and four bathrooms
Details
Permit
202512101424
Permit issued
Jul 31, 2026

unit#3: renovation of the interior of unit#3. remodel of one kitchen and four bathrooms

Open the permit page

$393,000
Dec 9, 2025In progress
issued Jul 2026
2100 Jackson StJ S Builders Llcunit 2- remodel interior to include remodel kitchen and 4 bathrooms
Details
Permit
202512091343
Permit issued
Jul 31, 2026

unit 2- remodel interior to include remodel kitchen and 4 bathrooms

Open the permit page

$393,000
Dec 5, 2025In progress
issued Jul 2026
2100 Jackson StJ S Builders Llcunit 1a: interior remodel including remodel of kitchen and 1 bathroom. no exterior or structural work.
Details
Permit
202512051109
Permit issued
Jul 31, 2026

unit 1a: interior remodel including remodel of kitchen and 1 bathroom. no exterior or structural work.

Open the permit page

$165,000
Dec 5, 2025In progress
issued Jul 2026
2100 Jackson StJ S Builders Llcunit 1: interior remodel including remodel of kitchen and 3 bathrooms. no exterior or structural work.
Details
Permit
202512051106
Permit issued
Jul 31, 2026

unit 1: interior remodel including remodel of kitchen and 3 bathrooms. no exterior or structural work.

Open the permit page

$189,000
Dec 4, 2025In progress
issued Sep 2026
2100 Jackson StJ S Builders Llcunit #8: renovation of interior of unit #4. remodel of kitchen and 4 bathrooms.
Details
Permit
202512041002
Permit issued
Sep 1, 2026

unit #8: renovation of interior of unit #4. remodel of kitchen and 4 bathrooms.

Open the permit page

$860,000
Dec 2, 2025In progress
issued Aug 2026
2100 Jackson StJ S Builders Llcunit 4: renovation of interior, wood window sashes replaced in-kind, remodel of kitchen & 4 bathrooms
Details
Permit
202512020768
Permit issued
Aug 5, 2026

unit 4: renovation of interior, wood window sashes replaced in-kind, remodel of kitchen & 4 bathrooms

Open the permit page

$260,000
Nov 21, 2025Expired or cancelled
cancelled Dec 2025
2100 Jackson Strenovation of common areas including the addition of a restroom and a lift.construction of ped connection to (e) detached garage and new ped exit. renovation of int unit 1b & 1c including wdws.
Details
Permit
202511210159

renovation of common areas including the addition of a restroom and a lift.construction of ped connection to (e) detached garage and new ped exit. renovation of int unit 1b & 1c including wdws.

Open the permit page

$1,145,002
Nov 14, 2025In progress
issued Jul 2026
69 Sharon StL E C A Construction Llcinterior remodel to include kitchen, bathroom, addition of a bathroom & bedroom. in kind replacements & hydronic heat
Details
Permit
202511149702
Permit issued
Jul 28, 2026

interior remodel to include kitchen, bathroom, addition of a bathroom & bedroom. in kind replacements & hydronic heat

Open the permit page

$60,000
Oct 31, 2025In progress
issued Jul 2026
67 Sharon StL E C A Construction Llcscope of work is an interor remodel to include kitchen, bathroom, and replace doors to rear yard and addition of 2 (n) skylights. windows replaced in kind. no change to front facade .
Details
Permit
202510318677
Permit issued
Jul 28, 2026

scope of work is an interor remodel to include kitchen, bathroom, and replace doors to rear yard and addition of 2 (n) skylights. windows replaced in kind. no change to front facade .

Open the permit page

$65,000
Oct 27, 2025In progress
issued Jul 2026
71 Sharon StL E C A Construction Llcinterior renovation to 71 sharon st including a kitchen remodel, bathroom addition, laundry room relocation, and expanded building envelope under (e) soffit. seismic strengthening at the ground floor.
Details
Permit
202509034461
Permit issued
Jul 27, 2026

interior renovation to 71 sharon st including a kitchen remodel, bathroom addition, laundry room relocation, and expanded building envelope under (e) soffit. seismic strengthening at the ground floor.

Open the permit page

$64,000
Oct 2, 2025Completed
final sign-off Feb 2026
229 Chattanooga StSandbank Construction, Increvision to 202508294235 to gas & electrical wall heaters to be replaced w/ heat pump split system. bathrooom layout reconfigured
Details
Permit
202510026627
Permit issued
Jan 27, 2026
Final sign-off
Feb 20, 2026

revision to 202508294235 to gas & electrical wall heaters to be replaced w/ heat pump split system. bathrooom layout reconfigured

Open the permit page

$10,000
Aug 29, 2025Completed
final sign-off Feb 2026
229 Chattanooga StSandbank Construction, Incinterior remodel, including kitchen and bathroom with new finishes, cabinetry and appliances. all new wiring, electric heat pump to replace existing heat. no structural work, no changes visible from street.
Details
Permit
202508294235
Permit issued
Sep 9, 2025
Final sign-off
Feb 20, 2026

interior remodel, including kitchen and bathroom with new finishes, cabinetry and appliances. all new wiring, electric heat pump to replace existing heat. no structural work, no changes visible from street.

Open the permit page

$43,000
Aug 1, 2025In progress
filed Aug 2025, not yet issued
1485 Clay Strevision to permit 202211166652. fire damage repair. no new rooms, renovation of 11 apartments. replace in kind kitchen + bathrooms, lighting, electric w/all heating, windows. revision: add washer/dryers to every unit, remove wall b/w kitchne + lving and add closets to units 3,8 and 9. infill
Details
Permit
202508012171

revision to permit 202211166652. fire damage repair. no new rooms, renovation of 11 apartments. replace in kind kitchen + bathrooms, lighting, electric w/all heating, windows. revision: add washer/dryers to every unit, remove wall b/w kitchne + lving and add closets to units 3,8 and 9. infill

Open the permit page

Jun 27, 2025Completed
final sign-off Jun 2026
906 Broadwaypermit to abate nov 202421513 & 2024-002795 enf to remove masaic tile on facade, waterproof & reinstall mosaic tile per preservation
Details
Permit
202506279697
Permit issued
Jul 24, 2025
Final sign-off
Jun 23, 2026

permit to abate nov 202421513 & 2024-002795 enf to remove masaic tile on facade, waterproof & reinstall mosaic tile per preservation

Open the permit page

$25,000
Apr 14, 2025In progress
issued Jun 2025
1801 California StSandbank Construction, Increvision to pa# 201811206437: removing a bedroom in unit #34 and adding a trash room in that location - no work proposed at exterior at public way.
Details
Permit
202504144388
Permit issued
Jun 3, 2025

revision to pa# 201811206437: removing a bedroom in unit #34 and adding a trash room in that location - no work proposed at exterior at public way.

Open the permit page

$7,500
Mar 11, 2025In progress
issued Jun 2026
2100 Jackson StD M Ravano Constructionscope of work is to perform a voluntary seismic retrofit of the existing multifamily building at 2100 jackson st.
Details
Permit
202502069777
Permit issued
Jun 16, 2026

scope of work is to perform a voluntary seismic retrofit of the existing multifamily building at 2100 jackson st.

Open the permit page

$904,000
Nov 20, 2024In progress
issued Jan 2025
1995 Union StRescom Realty And Development Llct.i. change of use from bank to gym (b to a-3 occupancy) no changes proposed to exterior. addition of 3 dressing rms, 1 staff rm, 1 water bottle fill station at ground fl. no juice bar & no hot tub.
Details
Permit
202411205363
Permit issued
Jan 6, 2025

t.i. change of use from bank to gym (b to a-3 occupancy) no changes proposed to exterior. addition of 3 dressing rms, 1 staff rm, 1 water bottle fill station at ground fl. no juice bar & no hot tub.

Open the permit page

$15,000
Oct 2, 2024Completed
final sign-off Dec 2024
3949 21st Stinterior remodel of upper unit to rearrance kitchen and bathroom layouts. no exterior changes proposed
Details
Permit
202410022128
Permit issued
Oct 7, 2024
Final sign-off
Dec 23, 2024

interior remodel of upper unit to rearrance kitchen and bathroom layouts. no exterior changes proposed

Open the permit page

$100,000
Aug 15, 2024Completed
final sign-off Jan 2025
1512 Irving StRescom Realty And Development Llcthe scope of work is to remove and replace the (e) entry doors to power to retail space at ground floor and provide power door operators at door per da-04/05 to comply w/the sf abe program. ref abe 201912169966
Details
Permit
202408158788
Permit issued
Sep 19, 2024
Final sign-off
Jan 14, 2025

the scope of work is to remove and replace the (e) entry doors to power to retail space at ground floor and provide power door operators at door per da-04/05 to comply w/the sf abe program. ref abe 201912169966

Open the permit page

$3,500
Aug 15, 2024Completed
final sign-off Jan 2025
1500 Irving StRescom Realty And Development Llcthe scope of work is to remove and replace the (e) entry doors to power to the restaurant at ground floor and provide power door operators at door per da-04/05 to comply w/the sf abe program. ref abe 201912169965
Details
Permit
202408158784
Permit issued
Sep 19, 2024
Final sign-off
Jan 14, 2025

the scope of work is to remove and replace the (e) entry doors to power to the restaurant at ground floor and provide power door operators at door per da-04/05 to comply w/the sf abe program. ref abe 201912169965

Open the permit page

$3,500
Aug 14, 2024Completed
final sign-off Mar 2025
154 Tiffany Avrev 201910023377- maintain original occupancy of r-3 per fs 12 and update the code standard to 2022 codes. deferred sprinkler design per ab-20 under separate permit. ground floor sprinklered to nfpa 13d voluntarily.
Details
Permit
202408148612
Permit issued
Sep 16, 2024
Final sign-off
Mar 24, 2025

rev 201910023377- maintain original occupancy of r-3 per fs 12 and update the code standard to 2022 codes. deferred sprinkler design per ab-20 under separate permit. ground floor sprinklered to nfpa 13d voluntarily.

Open the permit page

Jun 17, 2024Expired or cancelled
withdrawn Jun 2026
3763 Cesar Chavez Stunit remodel with remodeled kitchen & 2 baths.
Details
Permit
202406174648

unit remodel with remodeled kitchen & 2 baths.

Open the permit page

$50,000
Mar 25, 2024In progress
filed Mar 2024, not yet issued
154 Tiffany Avrevision to pa #20191002337 adminstrative permit to correct occupancy class from r-2 to r-3 per fs-12 and remove sprinkler scope.
Details
Permit
202403258572

revision to pa #20191002337 adminstrative permit to correct occupancy class from r-2 to r-3 per fs-12 and remove sprinkler scope.

Open the permit page

Feb 29, 2024Completed
final sign-off Jul 2024
1310 Mission Strevision to correct previously permitted occupant loads at 2nd floor, previous pa# 202305238363. add wall at reception and repair mezzanine stair.
Details
Permit
202402296793
Permit issued
Mar 12, 2024
Final sign-off
Jul 22, 2024

revision to correct previously permitted occupant loads at 2nd floor, previous pa# 202305238363. add wall at reception and repair mezzanine stair.

Open the permit page

Feb 8, 2024In progress
issued Apr 2024
688 Guerrero StAppetite For Construction Increnovate unit 688. kitchen remodel. addition of second bathroom. replace windows facing rear uard with patio door. in kind replacement of front door. all work at the ground floor unit.
Details
Permit
202402085518
Permit issued
Apr 11, 2024

renovate unit 688. kitchen remodel. addition of second bathroom. replace windows facing rear uard with patio door. in kind replacement of front door. all work at the ground floor unit.

Open the permit page

$222,967
Feb 2, 2024Completed
final sign-off Apr 2024
3439 Sacramento StO'dwyer Construction Incunit 403 revision to 202210255112 and 202310279700. changes include addition of 2 glass guardrail adjustments to planter and bench configuration.
Details
Permit
202402025178
Permit issued
Feb 5, 2024
Final sign-off
Apr 2, 2024

unit 403 revision to 202210255112 and 202310279700. changes include addition of 2 glass guardrail adjustments to planter and bench configuration.

Open the permit page

Jan 23, 2024Expired or cancelled
withdrawn Mar 2024
154 Tiffany Avrevision to bpa#201910023377 to remove sprinklers from scope per fs-12
Details
Permit
202401234453

revision to bpa#201910023377 to remove sprinklers from scope per fs-12

Open the permit page

Dec 8, 2023Completed
final sign-off Mar 2024
3763 Cesar Chavez StPs2 Increplace heating w/mini split 6 units. all less than 250lbs. replace gas appliances w/ electric. no work visible from street. mep work only.
Details
Permit
202312082220
Permit issued
Jan 3, 2024
Final sign-off
Mar 4, 2024

replace heating w/mini split 6 units. all less than 250lbs. replace gas appliances w/ electric. no work visible from street. mep work only.

Open the permit page

$25,000
Dec 7, 2023Completed
final sign-off Dec 2025
4042 Fulton StBlackline Constructionthe scope of work is the add 1 adu to the storage area at the ground floor per sfpc 207(c)(4).
Details
Permit
202312072116
Permit issued
Aug 8, 2024
Final sign-off
Dec 1, 2025

the scope of work is the add 1 adu to the storage area at the ground floor per sfpc 207(c)(4).

Open the permit page

$110,000
Dec 1, 2023Completed
final sign-off Dec 2024
227 Chattanooga StSandbank Construction, Incbasement storage area to be connected via internal stair to unit above, adding 2 bedrooms, 1 office, 2 baths.
Details
Permit
202312011796
Permit issued
Feb 28, 2024
Final sign-off
Dec 23, 2024

basement storage area to be connected via internal stair to unit above, adding 2 bedrooms, 1 office, 2 baths.

Open the permit page

$213,538
Oct 27, 2023Completed
final sign-off Apr 2024
3439 Sacramento StO'dwyer Construction Increvision to pa 2022-1025-5112 changes include addition of a glass guardrail, adjustments to planter and bench configuration
Details
Permit
202310279700
Permit issued
Nov 10, 2023
Final sign-off
Apr 2, 2024

revision to pa 2022-1025-5112 changes include addition of a glass guardrail, adjustments to planter and bench configuration

Open the permit page

Oct 18, 2023Never finaled
filed Oct 2023, never issued
433 Baden StCurrent Constructionremoval of property line windows, and removal of chimney and eaves built over the property line to allow for construction of a new home on the adjacent parcel. new adjacent home approved under pa# 201807063945.
Details
Permit
202310188909

removal of property line windows, and removal of chimney and eaves built over the property line to allow for construction of a new home on the adjacent parcel. new adjacent home approved under pa# 201807063945.

Open the permit page

$6,000
Sep 14, 2023Completed
final sign-off Jan 2024
4350 Kirkham St2b Living Inc#306: like for like kitchen renovation, like for like bathroom renovation, new electrical for new circuits, extend to new locations, insulation (r-15) on exterior facing wall. (interior work only).
Details
Permit
202309146592
Permit issued
Sep 14, 2023
Final sign-off
Jan 19, 2024

#306: like for like kitchen renovation, like for like bathroom renovation, new electrical for new circuits, extend to new locations, insulation (r-15) on exterior facing wall. (interior work only).

Open the permit page

$60,000
May 1, 2023In progress
issued May 2024
1964 Post Stadd two (2) new adu to the ground floor of the building under ordinance 162-16.
Details
Permit
202305016787
Permit issued
May 31, 2024

add two (2) new adu to the ground floor of the building under ordinance 162-16.

Open the permit page

$309,148
Apr 27, 2023Completed
final sign-off Oct 2025
4350 Kirkham StL E C A Construction Llcadd six new accessory dwelling units to the ground floor of the bldg under ordinance 162-16 and planning code section 207(c)(4)
Details
Permit
202304276564
Permit issued
Feb 13, 2024
Final sign-off
Oct 15, 2025

add six new accessory dwelling units to the ground floor of the bldg under ordinance 162-16 and planning code section 207(c)(4)

Open the permit page

$716,872
Apr 26, 2023Completed
final sign-off Apr 2024
3439 Sacramento StO'dwyer Construction Incunit #403: remove & replace existing windscreen at roof.
Details
Permit
202304266545
Permit issued
Nov 10, 2023
Final sign-off
Apr 2, 2024

unit #403: remove & replace existing windscreen at roof.

Open the permit page

$10,000
Mar 27, 2023Never finaled
filed Mar 2023, never issued
1920 Franklin Staddition of 2 adus to ground floor per sfpc 207(c)(4).
Details
Permit
202303274453

addition of 2 adus to ground floor per sfpc 207(c)(4).

Open the permit page

$171,600
Mar 27, 2023Never finaled
filed Mar 2023, never issued
1920 Franklin Staddition of 2 adus to rear carport per sfpc 207(c)(4).
Details
Permit
202303274454

addition of 2 adus to rear carport per sfpc 207(c)(4).

Open the permit page

$163,400
Feb 27, 2023Completed
final sign-off May 2024
1284 Page StAspect Builders Llc.legalization of dwelling unit installed without a permit per ordinance no.43-14
Details
Permit
202302272680
Permit issued
Jul 11, 2023
Final sign-off
May 30, 2024

legalization of dwelling unit installed without a permit per ordinance no.43-14

Open the permit page

$15,000
Feb 6, 2023Completed
final sign-off Jul 2023
390 29th AvPs2 Increvision to pa# 202006068211, adding step outisde unit.
Details
Permit
202302061469
Permit issued
Jun 13, 2023
Final sign-off
Jul 3, 2023

revision to pa# 202006068211, adding step outisde unit.

Open the permit page

$1,000
Feb 3, 2023Expired or cancelled
withdrawn Jun 2023
224 Kirkham Stdemolition of 2-story, type vb, single family dwelling.
Details
Permit
202302031333

demolition of 2-story, type vb, single family dwelling.

Open the permit page

$26,000
Feb 3, 2023Expired or cancelled
withdrawn Jun 2023
224 Kirkham Sterect 4-story over zero basement, type va, residential building with 2 units and 1 adu at ground floor.
Details
Permit
202302031340

erect 4-story over zero basement, type va, residential building with 2 units and 1 adu at ground floor.

Open the permit page

$1,025,200
Dec 23, 2022Never finaled
filed Dec 2022, never issued
2619 Mission Stadd 8(n) dwellings units to the basement & level 1, demo & rebuild part of the fl @ level1;excavate the rear yard 10ft to the level of the (e)basement & add an extra stair for access to the lowered rear yard;add a laundry room to the basement,add a bike room to the basement,add a trash room @ level1
Details
Permit
202212239067

add 8(n) dwellings units to the basement & level 1, demo & rebuild part of the fl @ level1;excavate the rear yard 10ft to the level of the (e)basement & add an extra stair for access to the lowered rear yard;add a laundry room to the basement,add a bike room to the basement,add a trash room @ level1

Open the permit page

$1,350,000
Dec 22, 2022Never finaled
filed Dec 2022, never issued
5235 Diamond Heights Bladd 7 new adus to the garage of building #2.per ordinance 162-16
Details
Permit
202212228998

add 7 new adus to the garage of building #2.per ordinance 162-16

Open the permit page

$630,000
Dec 21, 2022Never finaled
issued Sep 2023, no final
433 Baden StCurrent Constructionreplace (e) rear patio door & clerestory windows w/ new 3 stacking-sliding panel door; replace rear facade lighting in-kind; repair roof as req. in area work; repair (e) deck (less than 36" above grade) in-kind
Details
Permit
202212218881
Permit issued
Sep 19, 2023

replace (e) rear patio door & clerestory windows w/ new 3 stacking-sliding panel door; replace rear facade lighting in-kind; repair roof as req. in area work; repair (e) deck (less than 36" above grade) in-kind

Open the permit page

$15,000
Dec 20, 2022Never finaled
issued May 2023, no final
775 Geary StRei Build Up Construction Corpstructural revision to permit 201612215550. clarification of structural support for relocated fire escaped drop down ladder that is previously permitted under 201612215550.
Details
Permit
202212208755
Permit issued
May 22, 2023

structural revision to permit 201612215550. clarification of structural support for relocated fire escaped drop down ladder that is previously permitted under 201612215550.

Open the permit page

$7,000
Dec 6, 2022Completed
final sign-off Jan 2026
2898 Vallejo StRay Tom Construction Inc, Ashbury Gen Constructing & Engto abate planning code violation 2022-008073 enf and dbi nov 202293015 to remove the unpermitted 5th floor dormer at the north elevation and restore to approved condition in permit no. 201702239544 s/r2.
Details
Permit
202212067720
Permit issued
Jan 3, 2023
Final sign-off
Jan 12, 2026

to abate planning code violation 2022-008073 enf and dbi nov 202293015 to remove the unpermitted 5th floor dormer at the north elevation and restore to approved condition in permit no. 201702239544 s/r2.

Open the permit page

$10,000
Nov 29, 2022Completed
final sign-off Jan 2024
5285 Diamond Heights BlG J Chavez Increnovate (e) leasing office, business center & fitness areas, remodel 2 ada bathrooms, remove misc partitons, install millwork at entry hall and business center and replace 2 doors at entry
Details
Permit
202211297300
Permit issued
Dec 19, 2022
Final sign-off
Jan 11, 2024

renovate (e) leasing office, business center & fitness areas, remodel 2 ada bathrooms, remove misc partitons, install millwork at entry hall and business center and replace 2 doors at entry

Open the permit page

$64,000
Nov 29, 2022Never finaled
issued Sep 2023, no final
5285 Diamond Heights BlB-Side Inc.add exterior ada lift adjacent to diamond heights blvd sidewalk. no changes to sidewalk or public way proposed
Details
Permit
202211297298
Permit issued
Sep 15, 2023

add exterior ada lift adjacent to diamond heights blvd sidewalk. no changes to sidewalk or public way proposed

Open the permit page

$30,000
Nov 10, 2022Never finaled
filed Nov 2022, never issued
419 Baden Stconvert (e) crawl space to addtional living space & associated structural work. remodel of upper floors.
Details
Permit
202211106263

convert (e) crawl space to addtional living space & associated structural work. remodel of upper floors.

Open the permit page

$360,766
Oct 25, 2022Completed
final sign-off Apr 2024
3439 Sacramento StO'dwyer Construction Incste.403: demo and reinstall (e) roof deck for the purpose of reroofing. ref permit 202209122261
Details
Permit
202210255112
Permit issued
Mar 22, 2023
Final sign-off
Apr 2, 2024

ste.403: demo and reinstall (e) roof deck for the purpose of reroofing. ref permit 202209122261

Open the permit page

$22,000
Aug 1, 2022Completed
final sign-off Dec 2022
839 Broderick StAxa Constructionunit 1: remodel (1) bedroom into (3) bedrooms w/ remodeled kitchen & bathroom, (1) new additional bathroom.
Details
Permit
202208019653
Permit issued
Aug 19, 2022
Final sign-off
Dec 16, 2022

unit 1: remodel (1) bedroom into (3) bedrooms w/ remodeled kitchen & bathroom, (1) new additional bathroom.

Open the permit page

$43,000
Jul 22, 2022In progress
issued Mar 2024
1965 Page Stadd 3 adu to the rear carports of the bldg per ordinance 162-16.
Details
Permit
202207229178
Permit issued
Mar 19, 2024

add 3 adu to the rear carports of the bldg per ordinance 162-16.

Open the permit page

$390,000
Mar 24, 2022Completed
final sign-off Jan 2024
1023 Stanyan Stchange of use from retail grocery to retail professional services. no work/no construction.
Details
Permit
202203240785
Permit issued
Mar 24, 2022
Final sign-off
Jan 18, 2024

change of use from retail grocery to retail professional services. no work/no construction.

Open the permit page

Mar 22, 2022Never finaled
issued Mar 2022, no final
775 Geary StRei Build Up Construction Corprevision to bpa# 201612215550-s1. adjustments needed in path of travel due to site conditions found during construction & storage areas.
Details
Permit
202203220543
Permit issued
Mar 29, 2022

revision to bpa# 201612215550-s1. adjustments needed in path of travel due to site conditions found during construction & storage areas.

Open the permit page

Feb 28, 2022Completed
final sign-off May 2022
1677 Bush StTrim Fit Constr. - O'reilly Engineeringunits 7,14,21: interior remodel to move kitchens and convert to bedrooms. no change to exterior.
Details
Permit
202202288841
Permit issued
Mar 15, 2022
Final sign-off
May 11, 2022

units 7,14,21: interior remodel to move kitchens and convert to bedrooms. no change to exterior.

Open the permit page

$44,525
Feb 11, 2022Never finaled
issued Feb 2022, no final
901 Valencia StNomellini Construction * Ask For Id *apt 9: relocate (e) kitchen to other side of wall. revision to pa#202110210901
Details
Permit
202202117797
Permit issued
Feb 18, 2022

apt 9: relocate (e) kitchen to other side of wall. revision to pa#202110210901

Open the permit page

Feb 4, 2022Completed
final sign-off Jan 2024
1013 Stanyan StLawrence Fraser Constructionremodel ground floor to add partitions & accessible restrooms, one restroom in unit #1013 & one restroom in unit #1023. powered door operators @ entrances permitted in bpa#201908068028. framing & other work under bpa#202009265126
Details
Permit
202202047405
Permit issued
Feb 15, 2022
Final sign-off
Jan 18, 2024

remodel ground floor to add partitions & accessible restrooms, one restroom in unit #1013 & one restroom in unit #1023. powered door operators @ entrances permitted in bpa#201908068028. framing & other work under bpa#202009265126

Open the permit page

$27,000
Dec 28, 2021Completed
final sign-off Jul 2023
390 29th AvPs2 Increvision to pa 202006068211 and includes the addition of a range and dishwasher to the kitchen at unit b.
Details
Permit
202112285109
Permit issued
Jun 13, 2023
Final sign-off
Jul 3, 2023

revision to pa 202006068211 and includes the addition of a range and dishwasher to the kitchen at unit b.

Open the permit page

Dec 16, 2021Completed
final sign-off Dec 2023
57 Rosemont PlDmg Enterprises Increvision to permit 202011189218. to add showers to home office restrooms and replace additional 11 windows.
Details
Permit
202112164573
Permit issued
Sep 12, 2022
Final sign-off
Dec 22, 2023

revision to permit 202011189218. to add showers to home office restrooms and replace additional 11 windows.

Open the permit page

$4,000
Dec 14, 2021Never finaled
issued Dec 2022, no final
1950 Franklin StDoherty Restoration, Inc.addition of 4 new accessory dwelling units (adus) to an existing garage per ca state adu law and renovate an existing storage space to relocate parking. site permit: no
Details
Permit
202112144367
Permit issued
Dec 1, 2022

addition of 4 new accessory dwelling units (adus) to an existing garage per ca state adu law and renovate an existing storage space to relocate parking. site permit: no

Open the permit page

$345,000
Nov 23, 2021Completed
final sign-off May 2023
3035 Baker StDoherty Restoration, Inc.revision to 202008081395: adding an office to unit c, removing the court @ the notrth. reducing the size of the sunken patio in rear yard. change in mech system from ridiators to hini splits
Details
Permit
202111233078
Permit issued
Jan 6, 2022
Final sign-off
May 12, 2023

revision to 202008081395: adding an office to unit c, removing the court @ the notrth. reducing the size of the sunken patio in rear yard. change in mech system from ridiators to hini splits

Open the permit page

Sep 20, 2021Completed
final sign-off Oct 2021
2350 Washington Stadministrative permit to update unit count. pa 201803295045 (legalization) and 201805017882 (adu) are both finished. there are now 11 total units in the building. original cfc336293 is 9 units.
Details
Permit
202109208788
Permit issued
Sep 24, 2021
Final sign-off
Oct 7, 2021

administrative permit to update unit count. pa 201803295045 (legalization) and 201805017882 (adu) are both finished. there are now 11 total units in the building. original cfc336293 is 9 units.

Open the permit page

Aug 12, 2021Completed
final sign-off Jul 2022
1686 Market StEmcor Services/Mesa Energy Systems Increvision of structural element to pa #2019 0509 0211.
Details
Permit
202108126346
Permit issued
Aug 18, 2021
Final sign-off
Jul 25, 2022

revision of structural element to pa #2019 0509 0211.

Open the permit page

$1,000
Jul 21, 2021Never finaled
issued Mar 2022, no final
150 Anzavista AvBao Hengda Incthe scope of work is to convert an existing recreation room into an adu per the multi-family ministerial state adu law. no waivers required. sprinkler under separate permit.
Details
Permit
202107214868
Permit issued
Mar 14, 2022

the scope of work is to convert an existing recreation room into an adu per the multi-family ministerial state adu law. no waivers required. sprinkler under separate permit.

Open the permit page

$90,000
Mar 23, 2021Never finaled
issued May 2021, no final
371 Turk StTrim Fit Constr. - O'reilly Engineeringremove windows at property line.
Details
Permit
202103237144
Permit issued
May 12, 2021

remove windows at property line.

Open the permit page

$20,000
Feb 5, 2021Never finaled
issued Jul 2021, no final
2255 Judah StPs2 Incthe scope of work is to install signage to the storefront of a learning center.
Details
Permit
202102054153
Permit issued
Jul 12, 2021

the scope of work is to install signage to the storefront of a learning center.

Open the permit page

$500
Jan 28, 2021Completed
final sign-off Sep 2022
24 Jasper PlPerez Construction Llc.the scope of the project is to add one new accessory dwelling unit to the existing ground level as per ordinance no. 162-16.
Details
Permit
202101283530
Permit issued
Mar 16, 2022
Final sign-off
Sep 20, 2022

the scope of the project is to add one new accessory dwelling unit to the existing ground level as per ordinance no. 162-16.

Open the permit page

$49,970
Jan 19, 2021Never finaled
filed Jan 2021, never issued
954 Geary StSilverman Green Developmentadd one streamlined attached accessory dwelling unit within an existing multi-family dwelling per section 65852.2 of the ca government code.
Details
Permit
202101192889

add one streamlined attached accessory dwelling unit within an existing multi-family dwelling per section 65852.2 of the ca government code.

Open the permit page

$83,000
Dec 8, 2020Completed
final sign-off Feb 2024
1720 Leavenworth StSandbank Construction, Incthe scope of the work is to add three new accessory dwelling units to the ground floor per ordinance no. 162-16. there will be two studio units and one one-bedroom unit.
Details
Permit
202012080517
Permit issued
Nov 30, 2021
Final sign-off
Feb 13, 2024

the scope of the work is to add three new accessory dwelling units to the ground floor per ordinance no. 162-16. there will be two studio units and one one-bedroom unit.

Open the permit page

$210,000
Nov 23, 2020Never finaled
filed Nov 2020, never issued
325 09th Avadd 2 new adus to the rear portion of level 1 per ordinance no. 162-16.
Details
Permit
202011239542

add 2 new adus to the rear portion of level 1 per ordinance no. 162-16.

Open the permit page

$345,000
Nov 18, 2020Completed
final sign-off Dec 2023
57 Rosemont Plconversion of storage space into home offices plus two half baths.
Details
Permit
202011189218
Permit issued
Mar 23, 2021
Final sign-off
Dec 22, 2023

conversion of storage space into home offices plus two half baths.

Open the permit page

$105,000
Nov 18, 2020Completed
final sign-off Jul 2021
839 Broderick StPs2 Incunit #2: remodel a one bedroom unit into a 3-bedroom unit with remodeled kitchen, bathroom and new additional bathroom.
Details
Permit
202011189146
Permit issued
Feb 5, 2021
Final sign-off
Jul 1, 2021

unit #2: remodel a one bedroom unit into a 3-bedroom unit with remodeled kitchen, bathroom and new additional bathroom.

Open the permit page

$43,000
Nov 18, 2020Never finaled
issued Dec 2020, no final
775 Geary StRei Build Up Construction Corprevision to pa 201612215550. adu heating systems changed to electric resistance heaters compliant w/ ca energy code exceptions 3 & 4 of section 140.4 g
Details
Permit
202011189174
Permit issued
Dec 30, 2020

revision to pa 201612215550. adu heating systems changed to electric resistance heaters compliant w/ ca energy code exceptions 3 & 4 of section 140.4 g

Open the permit page

Nov 13, 2020Never finaled
issued Sep 2022, no final
660 Clipper Stalter site to permit project application number 201612225672, an addition of adus (9 units) at the ground level per ordinance 162-16.
Details
Permit
202011138869
Permit issued
Sep 27, 2022

alter site to permit project application number 201612225672, an addition of adus (9 units) at the ground level per ordinance 162-16.

Open the permit page

$1,030,000
Nov 12, 2020Never finaled
filed Nov 2020, never issued
301 Valencia Stthe scope of the work is to add 4 new accessory dwelling units to the rear portion of the basement per ordinance no. 162-16. a courtyard will be added in the rear yard to provide exposure for the units.
Details
Permit
202011128750

the scope of the work is to add 4 new accessory dwelling units to the rear portion of the basement per ordinance no. 162-16. a courtyard will be added in the rear yard to provide exposure for the units.

Open the permit page

$597,440
Nov 12, 2020Completed
final sign-off Jun 2022
123 Ripley Strevision to bpa#2016-1115-2705. the scope of the work is to add one accessory dwelling unit to level 1 of the rear area of north portion of the building per section 65852.2 of the ca government code. no waivers required. this permit will superseding permit 2016-1115-2705 work scope.
Details
Permit
202011128735
Permit issued
Jul 21, 2021
Final sign-off
Jun 23, 2022

revision to bpa#2016-1115-2705. the scope of the work is to add one accessory dwelling unit to level 1 of the rear area of north portion of the building per section 65852.2 of the ca government code. no waivers required. this permit will superseding permit 2016-1115-2705 work scope.

Open the permit page

$111,720
Oct 17, 2020Completed
final sign-off Jul 2022
24 Jasper PlPerez Construction Llc.revision to 3 ground floor adus permitted under pa 201608054342 & 201702088949. no revisions visible from the street.
Details
Permit
202010176769
Permit issued
Apr 20, 2021
Final sign-off
Jul 26, 2022

revision to 3 ground floor adus permitted under pa 201608054342 & 201702088949. no revisions visible from the street.

Open the permit page

Oct 17, 2020Completed
final sign-off Oct 2022
156 Tiffany AvRozen Home Builders Incadd 6 dormers in compliance to zoning administrator bulletin no.3 and an interior remodel of the 4th floor. and kitchen renovation at the 3rd floor (sep permit 202009214611).
Details
Permit
202010176749
Permit issued
Apr 26, 2021
Final sign-off
Oct 27, 2022

add 6 dormers in compliance to zoning administrator bulletin no.3 and an interior remodel of the 4th floor. and kitchen renovation at the 3rd floor (sep permit 202009214611).

Open the permit page

$110,000