Block 0618, lot 009
1950 Franklin St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 4
- Units
- 17
- Rooms
- 17 bathrooms
- Building
- 13,230 sq ft
- Lot
- 6,830 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 15, 2025 | Completed final sign-off Oct 2025 | 1950 Franklin St | Redlog Flooring Services Corp | apt 6 interior: plaster replace/repair on (2) cracked closets. all work in-kind.Details
apt 6 interior: plaster replace/repair on (2) cracked closets. all work in-kind. | $6,000 |
| Sep 9, 2025 | Completed final sign-off Sep 2025 | 1950 Franklin St | Redlog Flooring Services Corp | plaster repairs in kind, ceilings on bedrooms, hallway and kitchen, one wall in kitchen.Details
plaster repairs in kind, ceilings on bedrooms, hallway and kitchen, one wall in kitchen. | $20,000 |
| May 19, 2023 | Completed final sign-off Sep 2023 | 1950 Franklin St | Brighter Bay Builders Inc | apt 9: convert (e) kitchen to bedroom. relocate (e) kitchen, rehab (e) bathroom, install 2nd bathroom, install washer/dryer.Details
apt 9: convert (e) kitchen to bedroom. relocate (e) kitchen, rehab (e) bathroom, install 2nd bathroom, install washer/dryer. | $60,000 |
| Dec 14, 2021 | Never finaled issued Dec 2022, no final | 1950 Franklin St | Doherty Restoration, Inc. | addition of 4 new accessory dwelling units (adus) to an existing garage per ca state adu law and renovate an existing storage space to relocate parking. site permit: noDetails
addition of 4 new accessory dwelling units (adus) to an existing garage per ca state adu law and renovate an existing storage space to relocate parking. site permit: no | $345,000 |
| Aug 18, 2021 | Completed final sign-off Apr 2022 | 1950 Franklin St | S L M Development Inc. | apt 5 - 3rd flr: revision to 2021 0624 3098 (kitchen & bath only w/o plans). convert (e) kitchen to study. reloc kitchen. rehab (e) bath. install 2nd bath. install washer/gas dryer. convert (e) bed to living room. convert (e) living room to bedroom.Details
apt 5 - 3rd flr: revision to 2021 0624 3098 (kitchen & bath only w/o plans). convert (e) kitchen to study. reloc kitchen. rehab (e) bath. install 2nd bath. install washer/gas dryer. convert (e) bed to living room. convert (e) living room to bedroom. | $35,000 |
| Jun 24, 2021 | Completed final sign-off Apr 2022 | 1950 Franklin St | B-Side Inc. | unit #5: remodeling kitchen remodeling bathroomDetails
unit #5: remodeling kitchen remodeling bathroom | $25,000 |
| May 18, 2021 | Completed final sign-off Apr 2022 | 1950 Franklin St | B-Side Inc. | unit# 3(2nd flr) - convert (e) kitchen to study. convert (e) bedroom to living rm. rehab (e) kitchen. rehab (e) bathroom. install washer & dryer. relocate kitchen.Details
unit# 3(2nd flr) - convert (e) kitchen to study. convert (e) bedroom to living rm. rehab (e) kitchen. rehab (e) bathroom. install washer & dryer. relocate kitchen. | $49,000 |
| Sep 5, 2020 | Completed final sign-off Sep 2021 | 1950 Franklin St | All Systems Approved Inc | install a 13r automatic wet-pipe sprinkler system on the ground (egress only). 1st, 2nd, 3rd fl of a 4-story building.Details
install a 13r automatic wet-pipe sprinkler system on the ground (egress only). 1st, 2nd, 3rd fl of a 4-story building. | $53,000 |
| Sep 2, 2020 | Never finaled issued Sep 2020, no final | 1950 Franklin St | Au Electric Corporation/Aec Alarms | upgrade the extg fire alarm system to comply with sffc 1103.7.6.1 and nfpa 72Details
upgrade the extg fire alarm system to comply with sffc 1103.7.6.1 and nfpa 72 | $30,000 |
| Aug 6, 2020 | Never finaled filed Aug 2020, never issued | 1950 Franklin St | street spaceDetails
street space | ||
| Jun 26, 2020 | Expired or cancelled withdrawn Apr 2021 | 1950 Franklin St | add 4 new accessory dwelling units to the (e) garage per no. 95-17 and renovate an (e) storage space into parking. maher n/a.Details
add 4 new accessory dwelling units to the (e) garage per no. 95-17 and renovate an (e) storage space into parking. maher n/a. | $325,000 | |
| Feb 12, 2020 | Completed final sign-off Oct 2021 | 1950 Franklin St | Axel8 Construction | unit 4: convert existing 2 bedroom unit to (1) 1 bedroom unit and (1) studio unit for a net increase of (1) dwelling unit. (new unit to be 4a)Details
unit 4: convert existing 2 bedroom unit to (1) 1 bedroom unit and (1) studio unit for a net increase of (1) dwelling unit. (new unit to be 4a) | $30,000 |
| Jan 30, 2020 | Completed final sign-off Feb 2020 | 1950 Franklin St | Markoff Structural Pest Control | markoff structural pest report 19156 item 1 repair base post with concrete cap 4 steel rebar epoxy into e and repair less than 50% proper concrete ancho r bracketDetails
markoff structural pest report 19156 item 1 repair base post with concrete cap 4 steel rebar epoxy into e and repair less than 50% proper concrete ancho r bracket | $49,000 |
| Nov 4, 2019 | Completed final sign-off May 2020 | 1950 Franklin St | B-Side Inc. | apt 2 - convert (e) living room to bedroom, convert (e) bedroom to living room, rehabilitate (e) kitchen and bathroom, install second bathroom and install washer/dryer.Details
apt 2 - convert (e) living room to bedroom, convert (e) bedroom to living room, rehabilitate (e) kitchen and bathroom, install second bathroom and install washer/dryer. | $40,000 |
| Jul 5, 2019 | Completed final sign-off Oct 2021 | 1950 Franklin St | Axel8 Construction | no new conditioned space added, work includes wall, plumbing, & elec relocations, no changes to exterior. 8/23- convert 4 existing 2 bedrrom unit to 4 1 bedroom units and 4 studio units for a net increase of 4 dwelling units n the property.Details
no new conditioned space added, work includes wall, plumbing, & elec relocations, no changes to exterior. 8/23- convert 4 existing 2 bedrrom unit to 4 1 bedroom units and 4 studio units for a net increase of 4 dwelling units n the property. | $20,000 |
| May 30, 2019 | Completed final sign-off Sep 2019 | 1950 Franklin St | Axel8 Construction | #1 - convert (e) kitchento bedroom. rehabilitate bathroom. install w.d relocate kitchenDetails
#1 - convert (e) kitchento bedroom. rehabilitate bathroom. install w.d relocate kitchen | $35,000 |
| May 30, 2019 | Completed final sign-off Oct 2021 | 1950 Franklin St | Axel8 Construction | #8 - convert (e) living rm to bedroom. install 2ns bathroom. rehabilitate (e) kitchen & bathroom. install w.dDetails
#8 - convert (e) living rm to bedroom. install 2ns bathroom. rehabilitate (e) kitchen & bathroom. install w.d | $46,000 |
| Jun 21, 2016 | Completed final sign-off Jun 2017 | 1950 Franklin St | A J O Group Inc | comply w/san francisco wood-frame seismic retrofit program (soft story),sfbc chapter 34b,per 2012 iebc appendix a-4.Details
comply w/san francisco wood-frame seismic retrofit program (soft story),sfbc chapter 34b,per 2012 iebc appendix a-4. | $65,000 |
| Dec 1, 2000 | Completed final sign-off Dec 2000 | 1950 Franklin St | voluntary fastening of mud sill with foundation bolts.Details
voluntary fastening of mud sill with foundation bolts. | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Axel8 Construction (4), B-Side Inc. (3), Redlog Flooring Services Corp (2), A J O Group Inc, All Systems Approved Inc, Au Electric Corporation/Aec Alarms, Brighter Bay Builders Inc, Doherty Restoration, Inc., Markoff Structural Pest Control, S L M Development Inc.
- Architects
- Mark Hogan (2), Nathan C. Simpson (2)
- Engineers
- Joe Win Kon (2), Rod Massoudi (2), Aaron Mcdevitt, Giuseppe Sircana, Joe Kon
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.