Block 0219, lot 017
1485 Clay St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 3
- Units
- 12
- Rooms
- 11 bathrooms
- Building
- 8,625 sq ft
- Lot
- 3,881 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
31 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 19, 2026 | In progress filed Feb 2026, not yet issued | 1485 Clay St | add four adu's to the ground floor. repair of the (e) brick facade in conjunction with the seismic retrofit, under separate permit.Details
add four adu's to the ground floor. repair of the (e) brick facade in conjunction with the seismic retrofit, under separate permit. | $800,000 | |
| Dec 28, 2025 | In progress filed Dec 2025, not yet issued | 1485 Clay St | complete seismic retrofit on an existing soft story buildiong. (adu under separate permit)Details
complete seismic retrofit on an existing soft story buildiong. (adu under separate permit) | $700,000 | |
| Aug 1, 2025 | In progress filed Aug 2025, not yet issued | 1485 Clay St | revision to permit 202211166652. fire damage repair. no new rooms, renovation of 11 apartments. replace in kind kitchen + bathrooms, lighting, electric w/all heating, windows. revision: add washer/dryers to every unit, remove wall b/w kitchne + lving and add closets to units 3,8 and 9. infillDetails
revision to permit 202211166652. fire damage repair. no new rooms, renovation of 11 apartments. replace in kind kitchen + bathrooms, lighting, electric w/all heating, windows. revision: add washer/dryers to every unit, remove wall b/w kitchne + lving and add closets to units 3,8 and 9. infill | ||
| Jun 10, 2025 | In progress issued Jul 2025 | 1485 Clay St | administrative revision to building permit #202206226798 to include "to comply with nov 202295209." including all necessary reframing of floors 1 and 2 and roof, as well as seismic work.Details
administrative revision to building permit #202206226798 to include "to comply with nov 202295209." including all necessary reframing of floors 1 and 2 and roof, as well as seismic work. | ||
| Dec 4, 2023 | In progress issued Dec 2023 | 1485 Clay St | Halyard Inc | revision to approved fire alarm upgrade permit 202308023577. show (e) sprinkler system at common hallways on residentail levels. remove new fire alarm system in basement lvl commercial spaceDetails
revision to approved fire alarm upgrade permit 202308023577. show (e) sprinkler system at common hallways on residentail levels. remove new fire alarm system in basement lvl commercial space | |
| Aug 2, 2023 | In progress issued Oct 2023 | 1485 Clay St | Halyard Inc | upgrade fire alarm system to current codes, nfpa 70 (2022), to comply with sffc sec. 1103.7.6.1 to provide low frequency sounders in sleeping areas.Details
upgrade fire alarm system to current codes, nfpa 70 (2022), to comply with sffc sec. 1103.7.6.1 to provide low frequency sounders in sleeping areas. | $5,000 |
| Nov 16, 2022 | Never finaled issued Sep 2023, no final | 1485 Clay St | fire damage repair. no new rooms, replace in-kind for all units: replace kitchen/bathroom in-kind. replace plumbing fixtures in-kind. repair/repl elec wall heaters in-kind. replace in-kind lighting. add washer/ dryer in unit 4&10. comply w/ nov 202183384. struct work under separate permit.Details
fire damage repair. no new rooms, replace in-kind for all units: replace kitchen/bathroom in-kind. replace plumbing fixtures in-kind. repair/repl elec wall heaters in-kind. replace in-kind lighting. add washer/ dryer in unit 4&10. comply w/ nov 202183384. struct work under separate permit. | $495,000 | |
| Jun 22, 2022 | Never finaled issued Aug 2023, no final | 1485 Clay St | Halyard Inc | reconstruction of portions of structure severely damaged by fire. structural alterations are required for like repair with modern available wood products. significant portions of interior finishes will need to be replaced with drywall due to removal of plaster finishes during environmentalDetails
reconstruction of portions of structure severely damaged by fire. structural alterations are required for like repair with modern available wood products. significant portions of interior finishes will need to be replaced with drywall due to removal of plaster finishes during environmental | $715,000 |
| Jan 12, 2022 | Completed final sign-off Mar 2023 | 1485 Clay St | Halyard Inc | temporary shoring to facilitate safe abatement of fire damaged building.Details
temporary shoring to facilitate safe abatement of fire damaged building. | $15,000 |
| Feb 26, 2021 | Expired or cancelled withdrawn Dec 2025 | 1485 Clay St | adding three (3) units on basement & first level per ordinance 162-16. convert existing basement into new dwelling units within (e) envelope. 5 new bedrooms, 6.5 new bathrooms, 2 new offices, 3 new dishwashers, 3 new washer/dryers. new street facing windows.Details
adding three (3) units on basement & first level per ordinance 162-16. convert existing basement into new dwelling units within (e) envelope. 5 new bedrooms, 6.5 new bathrooms, 2 new offices, 3 new dishwashers, 3 new washer/dryers. new street facing windows. | $175,000 | |
| Dec 4, 2019 | Expired or cancelled cancelled Jan 2026 | 1485 Clay St | comply w/ accessible business entrance program. construct a power door operator in lieu of level landings adjoining exterior & interior doors of existing building required to be made accessible to persons with disabilities. automatic doors to comply w/ ansi/bhma a156.19Details
comply w/ accessible business entrance program. construct a power door operator in lieu of level landings adjoining exterior & interior doors of existing building required to be made accessible to persons with disabilities. automatic doors to comply w/ ansi/bhma a156.19 | $8,000 | |
| Jul 10, 2019 | Expired or cancelled cancelled Jan 2026 | 1485 Clay St | residential: soft story retrofit per sfevc chapter 4d: 2016 cebc appendix a-ieDetails
residential: soft story retrofit per sfevc chapter 4d: 2016 cebc appendix a-ie | $80,000 | |
| Jul 10, 2019 | Expired or cancelled cancelled Jan 2026 | 1485 Clay St | commercial: soft story retrofit per sfevc chapter 4d: 2016 cebc appendix a-4Details
commercial: soft story retrofit per sfevc chapter 4d: 2016 cebc appendix a-4 | $40,000 | |
| Apr 17, 2019 | Completed final sign-off Apr 2019 | 1485 Clay St | to obtain final inspetions for work approve dunder pa 201201252891/201203287075/201408133751. all work is complete.Details
to obtain final inspetions for work approve dunder pa 201201252891/201203287075/201408133751. all work is complete. | ||
| Nov 23, 2016 | Expired or cancelled cancelled Oct 2022 | 1485 Clay St | Sf Twin Boys Corp. Dba Master Builders | add 3 accessory dwelling units (1 bedroom & 1 bath each) per ordinance# 162-16. remodel existing laundromatDetails
add 3 accessory dwelling units (1 bedroom & 1 bath each) per ordinance# 162-16. remodel existing laundromat | $120,000 |
| Dec 17, 2014 | Completed final sign-off Apr 2015 | 1485 Clay St | board of appeal # 14-151, dated 11/25/14. special conditions permit for board of appeals case 14-151. bathroom remodel unit 10. match (e) floor level. infill wall between unit 9 & 10. elec & plumb work will be under separate permit. ref appl 2014-08-13-3751.Details
board of appeal # 14-151, dated 11/25/14. special conditions permit for board of appeals case 14-151. bathroom remodel unit 10. match (e) floor level. infill wall between unit 9 & 10. elec & plumb work will be under separate permit. ref appl 2014-08-13-3751. | $18,000 | |
| Aug 13, 2014 | Expired or cancelled expired Apr 2019 | 1485 Clay St | M H M Construction | apt #10. renovation kitchen and bathroom all in kind. no walls remove, all plumbing and electrical as needed. bathroom 5x6. kitchen 7x9Details
apt #10. renovation kitchen and bathroom all in kind. no walls remove, all plumbing and electrical as needed. bathroom 5x6. kitchen 7x9 | $18,000 |
| Oct 1, 2012 | Never finaled filed Oct 2012, never issued | 1485 Clay St | streetspaceDetails
streetspace | ||
| Oct 1, 2012 | Never finaled issued Oct 2012, no final | 1485 Clay St | streetspaceDetails
streetspace | ||
| Sep 11, 2012 | Completed final sign-off Jan 2013 | 1485 Clay St | Ricardo Arellano | replace windows to have proper egress access & tempered bathroom glass replacement. 4 windows in front will changed from vinyl/aluminum to wood, 8 windows in back changed from aluminum to vinyl.Details
replace windows to have proper egress access & tempered bathroom glass replacement. 4 windows in front will changed from vinyl/aluminum to wood, 8 windows in back changed from aluminum to vinyl. | $9,000 |
| Aug 13, 2012 | Never finaled issued Aug 2012, no final | 1485 Clay St | street space permit.Details
street space permit. | ||
| Jun 22, 2012 | Never finaled issued Jun 2012, no final | 1485 Clay St | street spaceDetails
street space | ||
| May 15, 2012 | Never finaled issued May 2012, no final | 1485 Clay St | street spaceDetails
street space | ||
| Mar 28, 2012 | Expired or cancelled expired Apr 2019 | 1485 Clay St | D C S Construction Services Inc | remove bearing wall at apt 1 & 4. revision to pa #201201252892 and pa #201201252893Details
remove bearing wall at apt 1 & 4. revision to pa #201201252892 and pa #201201252893 | $3,500 |
| Mar 5, 2012 | Never finaled issued Mar 2012, no final | 1485 Clay St | street space permitDetails
street space permit | ||
| Mar 5, 2012 | Completed final sign-off Jan 2013 | 1485 Clay St | D C S Construction Services Inc | to repair and replace portion of rear stairs not to exceed 50% and to repair related walkway at base of stairsDetails
to repair and replace portion of rear stairs not to exceed 50% and to repair related walkway at base of stairs | $15,000 |
| Jan 25, 2012 | Expired or cancelled expired Apr 2019 | 1485 Clay St | D C S Construction Services Inc | unit #7, remodel kitchen & bathroom in kind. upgrade electrical & plumbing. no structural work. high efficiency lighting.Details
unit #7, remodel kitchen & bathroom in kind. upgrade electrical & plumbing. no structural work. high efficiency lighting. | $20,000 |
| Jan 25, 2012 | Completed final sign-off Jan 2013 | 1485 Clay St | D C S Construction Services Inc | unit #2: remodel kitchen and bathroom in kind. no structural work. upgrade electrical & plumbubg, high efficacy lightingDetails
unit #2: remodel kitchen and bathroom in kind. no structural work. upgrade electrical & plumbubg, high efficacy lighting | $18,000 |
| Jan 25, 2012 | Completed final sign-off Jan 2013 | 1485 Clay St | D C S Construction Services Inc | unit #4, remodel kitchen & bathroom in kind. upgrade electrical & plumbing. no structural work. high efficiency lighting.Details
unit #4, remodel kitchen & bathroom in kind. upgrade electrical & plumbing. no structural work. high efficiency lighting. | $20,000 |
| Jan 25, 2012 | Completed final sign-off Jan 2013 | 1485 Clay St | D C S Construction Services Inc | unit 1, remodel kitchen & bathroom in kind. upgrade electrical & plumbing. no structural work. high efficiency lighting.Details
unit 1, remodel kitchen & bathroom in kind. upgrade electrical & plumbing. no structural work. high efficiency lighting. | $20,000 |
| Jan 24, 2012 | Never finaled issued Jan 2012, no final | 1485 Clay St | street space permitDetails
street space permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D C S Construction Services Inc (6), Halyard Inc (4), M H M Construction, Ricardo Arellano, Sf Twin Boys Corp. Dba Master Builders
- Architects
- Jacob Herczeg (4), Mark Hogan (2), Jeanne Liem
- Engineers
- Darren Wong (2), Tyler Moser (2), David Hensel, Emmanuel Pun, Jia Hui Pan, John Dal Pino, Michael O'brien
Find contractors for work like this