Ricardo Arellano
- Based in
- San Francisco
- On San Francisco permits
- Mar 2011 to Oct 2026
- Last 24 months
- 1 permit filed
10 permits since 2000: 7 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 530 Page St | replace 3 windows in kind, wood for wood. windows are street facing.Details
replace 3 windows in kind, wood for wood. windows are street facing. | $19,000 |
| Sep 4, 2024 | In progress issued Nov 2024 | 71 Douglass St | replace front exterior windows in kind.Details
replace front exterior windows in kind. | $2,000 |
| Sep 4, 2024 | In progress issued Nov 2024 | 69 Douglass St | replace front exterior windows in kind.Details
replace front exterior windows in kind. | $2,000 |
| Feb 15, 2017 | Completed final sign-off Feb 2017 | 16 Beaver St | revision to permit # 2016.1106.2940 to replace in unit 14 (5) windows in front and (3) not visible form street; and in unit 16, (4) windows in front, all windows wood with ogee lugs.Details
revision to permit # 2016.1106.2940 to replace in unit 14 (5) windows in front and (3) not visible form street; and in unit 16, (4) windows in front, all windows wood with ogee lugs. | |
| Nov 16, 2016 | Completed final sign-off Feb 2017 | 14 Beaver St | legalize upstairs windows (4) and replace 3 downstairs windows (3) to match upstairs, wood with ogee lugs.Details
legalize upstairs windows (4) and replace 3 downstairs windows (3) to match upstairs, wood with ogee lugs. | $9,000 |
| Oct 20, 2015 | Completed final sign-off Jan 2016 | 843 Capp St | 7 new double pane sash sets with ogee lugs to be installed (wood); 6 of 7 sets visible to the street. u-factor of the windows will be 0.32 max.Details
7 new double pane sash sets with ogee lugs to be installed (wood); 6 of 7 sets visible to the street. u-factor of the windows will be 0.32 max. | $9,757 |
| Jul 22, 2015 | Completed final sign-off Nov 2015 | 743 Arguello Bl | (8) new double pane low-e wood sashes w/ogee lugs to be installed. visible from street.Details
(8) new double pane low-e wood sashes w/ogee lugs to be installed. visible from street. | $13,880 |
| Mar 9, 2015 | Completed final sign-off Mar 2015 | 1940 Anza St | replace old wood windows with / replica sash energy efficent wood windows / sash / laminated glass. visable from the street.Details
replace old wood windows with / replica sash energy efficent wood windows / sash / laminated glass. visable from the street. | $8,902 |
| Sep 11, 2012 | Completed final sign-off Jan 2013 | 1485 Clay St | replace windows to have proper egress access & tempered bathroom glass replacement. 4 windows in front will changed from vinyl/aluminum to wood, 8 windows in back changed from aluminum to vinyl.Details
replace windows to have proper egress access & tempered bathroom glass replacement. 4 windows in front will changed from vinyl/aluminum to wood, 8 windows in back changed from aluminum to vinyl. | $9,000 |
| Mar 4, 2011 | Completed final sign-off Feb 2012 | 2523 Harrison St | replace four front windows in-kind, no rough opening changes. u-factor shall not exceed 0.40Details
replace four front windows in-kind, no rough opening changes. u-factor shall not exceed 0.40 | $5,486 |