Dmg Enterprises Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to Feb 2026
- Last 24 months
- 4 permits filed
24 permits since 2000: 16 completed, 4 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2026 | Expired or cancelled cancelled Mar 2026 | 1827 Jennings St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Jan 21, 2026 | Completed final sign-off Jun 2026 | 15 Eagle St | revision to permit 202509024351. relocate ahu from garage floor to suspended from garage ceiling. omit (2) fire rated property line windows and install (1) 45m fire rated fixed/non operable window in wall b/t store room and garage. install new shear at store room (ext) wall. install new ripped...Details
revision to permit 202509024351. relocate ahu from garage floor to suspended from garage ceiling. omit (2) fire rated property line windows and install (1) 45m fire rated fixed/non operable window in wall b/t store room and garage. install new shear at store room (ext) wall. install new ripped... | |
| Sep 2, 2025 | Completed final sign-off Jun 2026 | 15 Eagle St | lower/l: demo part of e) toilet & full steam rm & create new bathroom w/ shower, convert part of unconditional e) mep/laundry into new store room. upper/l: replace balcony beams & make guardrail code compliantDetails
lower/l: demo part of e) toilet & full steam rm & create new bathroom w/ shower, convert part of unconditional e) mep/laundry into new store room. upper/l: replace balcony beams & make guardrail code compliant | $30,000 |
| May 30, 2025 | In progress issued May 2025 | 265 Otsego Av | replace kitchen cabinet with new - same layout, add countertop receptaclesDetails
replace kitchen cabinet with new - same layout, add countertop receptacles | $12,000 |
| Jul 10, 2024 | In progress issued Jul 2024 | 291 10th St | demo existing roof mounter equipment, install floor gratting on existing steel frame structure.Details
demo existing roof mounter equipment, install floor gratting on existing steel frame structure. | $32,000 |
| May 3, 2024 | In progress issued May 2024 | 620 La Grande Av | to obtain a final inspection for work approved under pa #202102194998 & 202108206838. all work is complete.Details
to obtain a final inspection for work approved under pa #202102194998 & 202108206838. all work is complete. | |
| Apr 19, 2024 | In progress issued Apr 2024 | 620 La Grande Av | rev 202108206838- relocate laundry area from upper level to lower level, add partition wall between media and office area at lower level, change use of second level bedrooms into office and study rooms. add ballard in garage and vents for garage door.Details
rev 202108206838- relocate laundry area from upper level to lower level, add partition wall between media and office area at lower level, change use of second level bedrooms into office and study rooms. add ballard in garage and vents for garage door. | $2,000 |
| Apr 25, 2023 | Completed final sign-off Jul 2023 | 2075 46th Av | to comply w/nov# 202306924, replace existing entry staircase due to dry rot. replace damaged framing and stone w/new. replace in-kindDetails
to comply w/nov# 202306924, replace existing entry staircase due to dry rot. replace damaged framing and stone w/new. replace in-kind | $8,000 |
| Jan 31, 2023 | Expired or cancelled cancelled Jan 2026 | 2395 39th Av | install ada operator with press to opern access operator door. inside and outside (abe#202205241013)Details
install ada operator with press to opern access operator door. inside and outside (abe#202205241013) | |
| Jul 20, 2022 | Never finaled issued Sep 2022, no final | 620 La Grande Av | otc deck permit to build cantilevered deck for primary bedroom. rear sliding glass door & window replacement under separate permit 2021 0820 6838.Details
otc deck permit to build cantilevered deck for primary bedroom. rear sliding glass door & window replacement under separate permit 2021 0820 6838. | $15,000 |
| Jun 29, 2022 | Completed final sign-off Oct 2022 | 2075 46th Av | install new deck at backyard.Details
install new deck at backyard. | $12,000 |
| May 9, 2022 | Completed final sign-off Nov 2022 | 2075 46th Av | replace kitchen cabinet and counter top, new appliance, all of same location, replace vanity, water closets in 2 bathrooms.Details
replace kitchen cabinet and counter top, new appliance, all of same location, replace vanity, water closets in 2 bathrooms. | $45,000 |
| Dec 16, 2021 | Completed final sign-off Dec 2023 | 57 Rosemont Pl | revision to permit 202011189218. to add showers to home office restrooms and replace additional 11 windows.Details
revision to permit 202011189218. to add showers to home office restrooms and replace additional 11 windows. | $4,000 |
| Aug 20, 2021 | Never finaled issued Nov 2021, no final | 620 La Grande Av | new wet bar & office & bath @ 1st/f. remodel kitchen & bathrooms. relocate interior staircase, replace (e) windows w/ glass doors in rear of house. replace (e) window in-kind. repair dry rot front deck. new glass door & glass guardrail @ front.Details
new wet bar & office & bath @ 1st/f. remodel kitchen & bathrooms. relocate interior staircase, replace (e) windows w/ glass doors in rear of house. replace (e) window in-kind. repair dry rot front deck. new glass door & glass guardrail @ front. | $290,000 |
| Jul 11, 2019 | Completed final sign-off Jan 2020 | 250 Lobos St | replace kitchen cabinets & countertop, all electrical/plumbing to remain, no change in layout. no removal of walls.Details
replace kitchen cabinets & countertop, all electrical/plumbing to remain, no change in layout. no removal of walls. | $4,500 |
| Jan 10, 2018 | Completed final sign-off Mar 2018 | 843 40th Av | revision to permit application #201705166758. delete bathtub and shower from scope of work. no change of (e) layout.Details
revision to permit application #201705166758. delete bathtub and shower from scope of work. no change of (e) layout. | |
| May 16, 2017 | Completed final sign-off Mar 2018 | 843 40th Av | remodel (e) (2) side-by-side bathrooms, replace vanity, water closet, bathtub with new in same location, install new tiling, paint.Details
remodel (e) (2) side-by-side bathrooms, replace vanity, water closet, bathtub with new in same location, install new tiling, paint. | $27,882 |
| Mar 13, 2013 | Completed final sign-off May 2013 | 667 Waller St | move water heater approx 4'-0" add rough in for washer/dryer. replace 4" studs with 6" studs. add insulation to wall. work in garage.Details
move water heater approx 4'-0" add rough in for washer/dryer. replace 4" studs with 6" studs. add insulation to wall. work in garage. | $2,800 |
| Feb 20, 2009 | Completed final sign-off Jun 2009 | 42 Mill St | revision to pa# 2007.12.07.9954. add raised flooring subfloor on ground floor for the bedroom and entertainment roomDetails
revision to pa# 2007.12.07.9954. add raised flooring subfloor on ground floor for the bedroom and entertainment room | $2,000 |
| Mar 14, 2008 | Completed final sign-off Apr 2008 | 2739 Balboa St | revision to pa# 2007/12/07/9949 to add a master bath on the 2nd floor.Details
revision to pa# 2007/12/07/9949 to add a master bath on the 2nd floor. | $3,500 |
| Dec 7, 2007 | Completed final sign-off Apr 2008 | 2739 Balboa St | remodel kitchen: replace cabs, lights and counter top. remodel bathroom: replace bathtub, pedestal sink and toilet, add new shower pan. all work on 2ndfloorDetails
remodel kitchen: replace cabs, lights and counter top. remodel bathroom: replace bathtub, pedestal sink and toilet, add new shower pan. all work on 2ndfloor | $9,000 |
| Dec 7, 2007 | Completed final sign-off Jun 2009 | 42 Mill St | add entertainment room, full bathroom and bedroom plus two closets and two new windows at ground floor.Details
add entertainment room, full bathroom and bedroom plus two closets and two new windows at ground floor. | $12,000 |
| Mar 1, 2007 | Completed final sign-off Jul 2007 | 346 Funston Av | new millwork in kitchen, new tub + vanity & toilet in restrooms, new ceiling. replace windows installation,new light fixtures. insulate at ceilings. new 5/8 type "x" gyp at ceiling. recessed cans to be wrapped w/ 5/8 type "x" gyp no structural windows at front wood to wood.Details
new millwork in kitchen, new tub + vanity & toilet in restrooms, new ceiling. replace windows installation,new light fixtures. insulate at ceilings. new 5/8 type "x" gyp at ceiling. recessed cans to be wrapped w/ 5/8 type "x" gyp no structural windows at front wood to wood. | $40,000 |
| Mar 1, 2007 | Completed final sign-off Jul 2007 | 348 Funston Av | new millwork in kitchen, new tub & vanity & toilet in restrooms, new ceiling installation new light fixtures. replace windows at front wood to wood. insulate ceilinge. new 5/8 type "x" gyp. at ceiling. recessed cans to be wrapped with 5/8 type "x" exp. no structureal work.Details
new millwork in kitchen, new tub & vanity & toilet in restrooms, new ceiling installation new light fixtures. replace windows at front wood to wood. insulate ceilinge. new 5/8 type "x" gyp. at ceiling. recessed cans to be wrapped with 5/8 type "x" exp. no structureal work. | $40,000 |