Back to kitchen remodel contractors
Dmg Enterprises Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to Feb 2026
- Last 24 months
- 4 permits filed
24 permits since 2000: 16 completed, 4 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2025 | In progress issued May 2025 | 265 Otsego Av | replace kitchen cabinet with new - same layout, add countertop receptaclesDetails
replace kitchen cabinet with new - same layout, add countertop receptacles | $12,000 |
| May 9, 2022 | Completed final sign-off Nov 2022 | 2075 46th Av | replace kitchen cabinet and counter top, new appliance, all of same location, replace vanity, water closets in 2 bathrooms.Details
replace kitchen cabinet and counter top, new appliance, all of same location, replace vanity, water closets in 2 bathrooms. | $45,000 |
| Aug 20, 2021 | Never finaled issued Nov 2021, no final | 620 La Grande Av | new wet bar & office & bath @ 1st/f. remodel kitchen & bathrooms. relocate interior staircase, replace (e) windows w/ glass doors in rear of house. replace (e) window in-kind. repair dry rot front deck. new glass door & glass guardrail @ front.Details
new wet bar & office & bath @ 1st/f. remodel kitchen & bathrooms. relocate interior staircase, replace (e) windows w/ glass doors in rear of house. replace (e) window in-kind. repair dry rot front deck. new glass door & glass guardrail @ front. | $290,000 |
| Jul 11, 2019 | Completed final sign-off Jan 2020 | 250 Lobos St | replace kitchen cabinets & countertop, all electrical/plumbing to remain, no change in layout. no removal of walls.Details
replace kitchen cabinets & countertop, all electrical/plumbing to remain, no change in layout. no removal of walls. | $4,500 |
| Dec 7, 2007 | Completed final sign-off Apr 2008 | 2739 Balboa St | remodel kitchen: replace cabs, lights and counter top. remodel bathroom: replace bathtub, pedestal sink and toilet, add new shower pan. all work on 2ndfloorDetails
remodel kitchen: replace cabs, lights and counter top. remodel bathroom: replace bathtub, pedestal sink and toilet, add new shower pan. all work on 2ndfloor | $9,000 |
| Mar 1, 2007 | Completed final sign-off Jul 2007 | 346 Funston Av | new millwork in kitchen, new tub + vanity & toilet in restrooms, new ceiling. replace windows installation,new light fixtures. insulate at ceilings. new 5/8 type "x" gyp at ceiling. recessed cans to be wrapped w/ 5/8 type "x" gyp no structural windows at front wood to wood.Details
new millwork in kitchen, new tub + vanity & toilet in restrooms, new ceiling. replace windows installation,new light fixtures. insulate at ceilings. new 5/8 type "x" gyp at ceiling. recessed cans to be wrapped w/ 5/8 type "x" gyp no structural windows at front wood to wood. | $40,000 |
| Mar 1, 2007 | Completed final sign-off Jul 2007 | 348 Funston Av | new millwork in kitchen, new tub & vanity & toilet in restrooms, new ceiling installation new light fixtures. replace windows at front wood to wood. insulate ceilinge. new 5/8 type "x" gyp. at ceiling. recessed cans to be wrapped with 5/8 type "x" exp. no structureal work.Details
new millwork in kitchen, new tub & vanity & toilet in restrooms, new ceiling installation new light fixtures. replace windows at front wood to wood. insulate ceilinge. new 5/8 type "x" gyp. at ceiling. recessed cans to be wrapped with 5/8 type "x" exp. no structureal work. | $40,000 |