Block 3508, lot 019
1310 Mission St
- City’s use
- Commercial Office
- Built
- 1946
- Stories
- 2
- Units
- 1
- Rooms
- 3 bathrooms
- Building
- 5,320 sq ft
- Lot
- 3,798 sq ft
- Zoning
- C3G
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 2, 2024 | Completed final sign-off Aug 2024 | 1310 Mission St | recognize building as 2 story plus mezzamine assembly occupancy a-2, max occupants total 239. ref pa# 202305238363 & 202402296793Details
recognize building as 2 story plus mezzamine assembly occupancy a-2, max occupants total 239. ref pa# 202305238363 & 202402296793 | ||
| Jul 1, 2024 | Completed final sign-off Jul 2024 | 1310 Mission St | Project Contractor Inc | modify sprinkler system to accommodate ceiling obstruction at ground fl. (by 5 year sprinkler maintaenance report) total: add (1) sprinkler headDetails
modify sprinkler system to accommodate ceiling obstruction at ground fl. (by 5 year sprinkler maintaenance report) total: add (1) sprinkler head | $900 |
| Feb 29, 2024 | Completed final sign-off Jul 2024 | 1310 Mission St | revision to correct previously permitted occupant loads at 2nd floor, previous pa# 202305238363. add wall at reception and repair mezzanine stair.Details
revision to correct previously permitted occupant loads at 2nd floor, previous pa# 202305238363. add wall at reception and repair mezzanine stair. | ||
| May 23, 2023 | Completed final sign-off Jul 2024 | 1310 Mission St | change of use, create walls to enclose kitchen area, new office area. no massageDetails
change of use, create walls to enclose kitchen area, new office area. no massage | $10,000 | |
| Sep 16, 2016 | Completed final sign-off Sep 2016 | 1310 Mission St | Occidental Express | complying with nov 201608871 soft demo work by tenant complying with ab-07.Details
complying with nov 201608871 soft demo work by tenant complying with ab-07. | $2,000 |
| Aug 26, 2009 | Completed final sign-off Sep 2009 | 1310 Mission St | Station 1 Fire Protection | add 6-fire sprinkler to under new seating area.Details
add 6-fire sprinkler to under new seating area. | $3,500 |
| Jun 29, 2009 | Completed final sign-off Oct 2009 | 1310 Mission St | removal of existing seating tiers in room 111. replace with new seating tiers with sprinklers below per fire department inspector. fire sprinkler under separate permit.Details
removal of existing seating tiers in room 111. replace with new seating tiers with sprinklers below per fire department inspector. fire sprinkler under separate permit. | $40,000 | |
| Jun 22, 2007 | Completed final sign-off Apr 2008 | 1310 Mission St | Cahill Contractors Inc | temporary underpinning existing bldg; ref pa#200606144063sDetails
temporary underpinning existing bldg; ref pa#200606144063s | $18,000 |
| Jan 25, 2005 | Completed final sign-off May 2005 | 1310 Mission St | Fire Protection Retrofit Specialist | to install fire sprinker system w/nfpa-13 reqs. as built dwg for 2004110458511Details
to install fire sprinker system w/nfpa-13 reqs. as built dwg for 2004110458511 | |
| Jan 13, 2005 | Completed final sign-off May 2005 | 1310 Mission St | lighting and mechanical work for existing dance school refer to app #200410298042Details
lighting and mechanical work for existing dance school refer to app #200410298042 | $20,000 | |
| Nov 4, 2004 | Completed final sign-off May 2005 | 1310 Mission St | Fire Protection Retrofit Specialist | install fire sprinkler system to comply with nfpa 13 requirementDetails
install fire sprinkler system to comply with nfpa 13 requirement | $20,600 |
| Oct 29, 2004 | Completed final sign-off May 2005 | 1310 Mission St | remodel & change of use of existing ground flr vacant retail space to dance school for adults.Details
remodel & change of use of existing ground flr vacant retail space to dance school for adults. | $100,000 | |
| Jan 11, 2002 | Expired or cancelled expired Mar 2003 | 1310 Mission St | int remodel demo nonbearing partitions, rmv plstr ceiling,insulate ceiling,disabl toilet,rough plumbDetails
int remodel demo nonbearing partitions, rmv plstr ceiling,insulate ceiling,disabl toilet,rough plumb | $19,500 | |
| May 21, 2001 | Expired or cancelled expired Sep 2001 | 1310 Mission St | Nielsen Aire Construction | renewal of pa#2000/11/02/4698 to complete repair & final inspectionDetails
renewal of pa#2000/11/02/4698 to complete repair & final inspection | $700 |
| Nov 2, 2000 | Expired or cancelled expired Mar 2001 | 1310 Mission St | Nielsen Aire Construction | repair ceiling in storage area, structural joist are in sound conditions, remove loose install leverDetails
repair ceiling in storage area, structural joist are in sound conditions, remove loose install lever | $2,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Fire Protection Retrofit Specialist (2), Nielsen Aire Construction (2), Cahill Contractors Inc, Occidental Express, Project Contractor Inc, Station 1 Fire Protection
- Architects
- Gary Struthers (2), Zachary Nathan Architect (2), Mark Hogan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.