Sarah Ebner
- Listed as
- architect
- Firm
- See Architect
- Based in
- Berkeley
- On San Francisco permits
- Aug 2017 to Dec 2025
12 permits since 2000 (architect on 12 permits): 5 completed, 2 in progress, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 8, 2025 | In progress filed Dec 2025, not yet issued | 4633 19th St | Norwood Construction | renovation of (e) single family residence including rear addition.Details
renovation of (e) single family residence including rear addition. | $450,000 |
| Jul 31, 2024 | In progress issued Jul 2024 | 371 Prospect Av | Mosvaler Construction Inc | revision to pa#202310128484 and 202209283359. modification specifications for the front (street facing) glass guardrail. replace frosted glass with clear, non reflective glass. no changes proposed to the size, location or structural properties of the guardrail.Details
revision to pa#202310128484 and 202209283359. modification specifications for the front (street facing) glass guardrail. replace frosted glass with clear, non reflective glass. no changes proposed to the size, location or structural properties of the guardrail. | |
| Apr 25, 2024 | Expired or cancelled cancelled Aug 2024 | 3877 Jackson St | Custom Construction Enterprises | remodel of (e) 3-story, 2-unit historic bldg w/ udu including legalization of udu to adu, new interior finishes, fixtures, & lighting, replacement of (e) windows (except front windows), new roofing, removal of (e) rear decks, code upgrades to stairs & path of egress, paint & repair exterior finishesDetails
remodel of (e) 3-story, 2-unit historic bldg w/ udu including legalization of udu to adu, new interior finishes, fixtures, & lighting, replacement of (e) windows (except front windows), new roofing, removal of (e) rear decks, code upgrades to stairs & path of egress, paint & repair exterior finishes | $2,581,520 |
| Oct 12, 2023 | Expired or cancelled expired Apr 2026 | 371 Prospect Av | Mosvaler Construction Inc | revision to 202209283359. new foundation to support existing structure due to unforseen conditions. additional revisions include: changes to the interior partition layout, changes to the sunroom floor elevation (no additional cost incurred)Details
revision to 202209283359. new foundation to support existing structure due to unforseen conditions. additional revisions include: changes to the interior partition layout, changes to the sunroom floor elevation (no additional cost incurred) | $8,900 |
| Oct 4, 2022 | Completed final sign-off May 2023 | 1395 Newcomb Av | Anstirman Construction | revision to 202006128517. re-locate & installation of new electric meter & construction new concrete landing encroaching on public sidewalk to allow servicing of this meter per pge greenbook req.Details
revision to 202006128517. re-locate & installation of new electric meter & construction new concrete landing encroaching on public sidewalk to allow servicing of this meter per pge greenbook req. | $10,000 |
| Sep 28, 2022 | Never finaled issued Jul 2023, no final | 371 Prospect Av | Mosvaler Construction Inc | residential remodel & addition. (n) garage door. infill addition of a sun room to connect (e) garage structure to house in the rear. (n) master suite addition above (e) garage (bedroom, home office & bathroom) remodel (e) 2nd flr arears to remove 1 (e) bedrm & reconfigure kitchen & dining rm.Details
residential remodel & addition. (n) garage door. infill addition of a sun room to connect (e) garage structure to house in the rear. (n) master suite addition above (e) garage (bedroom, home office & bathroom) remodel (e) 2nd flr arears to remove 1 (e) bedrm & reconfigure kitchen & dining rm. | $372,133 |
| Jun 14, 2022 | Completed final sign-off Sep 2022 | 2860 Washington St | Greenport Construction Inc | interior kitchen remodel including replacing all kitchen cabinets, plumbing fixtures and appliances, and the demolition of a portion of an interior non-bearing wall and some ceiling soffits.Details
interior kitchen remodel including replacing all kitchen cabinets, plumbing fixtures and appliances, and the demolition of a portion of an interior non-bearing wall and some ceiling soffits. | $100,000 |
| Apr 8, 2021 | Completed final sign-off Oct 2023 | 2419 42nd Av | Ken O'sullivan Construction And Renovati | remodel of (e) kitchen and living room including relocation of (e) gas range, appliances, plumbing fixtures, electrical fixtures, and the addition of 1 skylight. demolition of framing members and (e) dropped ceiling. new lighting, finishes, appliances, and fixtures thrughout.Details
remodel of (e) kitchen and living room including relocation of (e) gas range, appliances, plumbing fixtures, electrical fixtures, and the addition of 1 skylight. demolition of framing members and (e) dropped ceiling. new lighting, finishes, appliances, and fixtures thrughout. | $40,000 |
| Dec 10, 2018 | Never finaled issued May 2019, no final | 760 De Haro St | renovation and reconfiguration of units along with upgrades to all mep and exterior recladding and new windows, facing streetDetails
renovation and reconfiguration of units along with upgrades to all mep and exterior recladding and new windows, facing street | $150,000 | |
| Jul 12, 2018 | Expired or cancelled expired Apr 2026 | 2868 Bush St | Terry Mc Daniel Construction, Redoak Construction, Custom Construction Enterprises | addition (n) 3rd floor & horizontal addition @ rear of (e) sfd. @ ground fl: restore (e) entry stair per hist reference, remove (e) & provide (n) interior stair & partitions. @ 2nd fl: restore (e) entryway, remove & reconfigure walls,provide (n) walls,stairs to 3rd fl.Details
addition (n) 3rd floor & horizontal addition @ rear of (e) sfd. @ ground fl: restore (e) entry stair per hist reference, remove (e) & provide (n) interior stair & partitions. @ 2nd fl: restore (e) entryway, remove & reconfigure walls,provide (n) walls,stairs to 3rd fl. | $1,100,000 |
| Nov 14, 2017 | Completed final sign-off Mar 2018 | 713 San Bruno Av | Bay Metro Corporation | lower unit bathroom remodel - relocate tub & vanity, new fixtures & tile.Details
lower unit bathroom remodel - relocate tub & vanity, new fixtures & tile. | $25,000 |
| Aug 22, 2017 | Completed final sign-off Oct 2017 | 2234 California St | Terry Mc Daniel Construction | unit a - turn closet into laundry room, demo cabinet walls and ceiling as needed for plumbing and electrical. add ceiling vent fan and washer/dryer stack. new sheetrock as needed and paint. no structural workDetails
unit a - turn closet into laundry room, demo cabinet walls and ceiling as needed for plumbing and electrical. add ceiling vent fan and washer/dryer stack. new sheetrock as needed and paint. no structural work | $13,000 |