Meagan Holmes
- Listed as
- architect
- Firm
- Min+ Architecture
- Based in
- St Louis
- On San Francisco permits
- Aug 2016 to Dec 2025
12 permits since 2000 (architect on 12 permits): 7 completed, 3 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 16, 2025 | In progress issued Feb 2026 | 3352 Market St | Citidev Inc. | interior renovation and small rear addition totaling 32 sq ft. this work includes new finishes, fixtures, casework, lighting, plumbing, and electircal at the kitchen, bath #1 and bath #2. will required electrical panel upgrade and full remodel of knob and tube. new siding at the facade attached to..Details
interior renovation and small rear addition totaling 32 sq ft. this work includes new finishes, fixtures, casework, lighting, plumbing, and electircal at the kitchen, bath #1 and bath #2. will required electrical panel upgrade and full remodel of knob and tube. new siding at the facade attached to.. | $650,000 |
| Sep 30, 2024 | In progress filed Sep 2024, not yet issued | 4248 23rd St | remove non-conforming existing exterior stair to upper unit back entrance & replace w/elongated, conforming stair. sidewalk entry door & upper unit back entry door to be replaced to accommodate new stair run. door at street face elevation stays in same location. new railing & siding as needed.Details
remove non-conforming existing exterior stair to upper unit back entrance & replace w/elongated, conforming stair. sidewalk entry door & upper unit back entry door to be replaced to accommodate new stair run. door at street face elevation stays in same location. new railing & siding as needed. | $15,000 | |
| Aug 6, 2024 | Expired or cancelled expired Jul 2026 | 4245 23rd St | Saturn Construction Co | revision to pa#202210285454 to include removal of roof deck, update to rear exterior finishes. south wall expansion 10'" furnther south, updated window types and the addition of a skylight and stacked washer/dryer at hall bath.Details
revision to pa#202210285454 to include removal of roof deck, update to rear exterior finishes. south wall expansion 10'" furnther south, updated window types and the addition of a skylight and stacked washer/dryer at hall bath. | |
| Jul 12, 2024 | In progress issued Jul 2024 | 2085 Greenwich St | minor interior renvations of an existing ground level interior room. as required to bring previously un permitted finish work into code-compliance allowing for legal use of this existing room as a conditioned home office/closet.Details
minor interior renvations of an existing ground level interior room. as required to bring previously un permitted finish work into code-compliance allowing for legal use of this existing room as a conditioned home office/closet. | $15,000 | |
| Apr 28, 2023 | Completed final sign-off Mar 2025 | 393 Arlington St | Green Construction Builder Corp | replacing & expanding existing main floor deck & new ground lvl flat work to integrate new deck. demo of (e) deck, replacement of (e) property line fire wall & n concrete footings. (n) larger deck will align to the (e) bi-fold door sill. (n) extisting metal spiral stair.Details
replacing & expanding existing main floor deck & new ground lvl flat work to integrate new deck. demo of (e) deck, replacement of (e) property line fire wall & n concrete footings. (n) larger deck will align to the (e) bi-fold door sill. (n) extisting metal spiral stair. | $80,000 |
| Oct 28, 2022 | Completed final sign-off Aug 2026 | 4245 23rd St | Saturn Construction Co | interior renovation of(e)garage level laundry room & storage room,1st level kitchen & living room,2nd level hall bath & bedrooms.exterior rear addition to add a bedroom on the garage level,enlarge the 2nd level.scope of work also includes(n)interior stair to(n)roof deck.Details
interior renovation of(e)garage level laundry room & storage room,1st level kitchen & living room,2nd level hall bath & bedrooms.exterior rear addition to add a bedroom on the garage level,enlarge the 2nd level.scope of work also includes(n)interior stair to(n)roof deck. | $1,200,000 |
| Jul 1, 2021 | Completed final sign-off Mar 2022 | 4245 23rd St | Broad Oaks Construction Inc | fixtures, new vanity and finishes. scope of demolition is non structural, down to subfloor and backer board as required for new finishes. no changes to (e) walls and no new walls. no add. plumbing fixtures.Details
fixtures, new vanity and finishes. scope of demolition is non structural, down to subfloor and backer board as required for new finishes. no changes to (e) walls and no new walls. no add. plumbing fixtures. | $40,000 |
| Apr 27, 2021 | Never finaled filed Apr 2021, never issued | 3363 22nd St | excavate 67 cubic yards of earth, to enable conversion of existing unfinished lower level to living space. renovate existing upper level. remove existing exterior staircase and build new interior staircase to connect floors.Details
excavate 67 cubic yards of earth, to enable conversion of existing unfinished lower level to living space. renovate existing upper level. remove existing exterior staircase and build new interior staircase to connect floors. | $150,000 | |
| Mar 12, 2018 | Completed final sign-off Nov 2019 | 218 Anza St | Mosvaler Construction Inc | demo (e) unpermitted rear sunroom of unit# 218 & deteriorated wood deck of unit# 220. new 2 story, rear addition to be new great room for both units. renovate (e) kitchen & (e) full bath & add 2nd bedroom. washer & dryer closetfor both units within (e) footprint.Details
demo (e) unpermitted rear sunroom of unit# 218 & deteriorated wood deck of unit# 220. new 2 story, rear addition to be new great room for both units. renovate (e) kitchen & (e) full bath & add 2nd bedroom. washer & dryer closetfor both units within (e) footprint. | $200,000 |
| Oct 24, 2017 | Completed final sign-off Jun 2018 | 218 Anza St | remove (e) non-historical vinyl windows & replace w/(2) single swing doors of same height & width as (e) windows in (e) openings. (e) exterior standing trim & overhang to remain. doors to be full-lite, wood frame to maintain (e) appearance of front facade from sidewalk.Details
remove (e) non-historical vinyl windows & replace w/(2) single swing doors of same height & width as (e) windows in (e) openings. (e) exterior standing trim & overhang to remain. doors to be full-lite, wood frame to maintain (e) appearance of front facade from sidewalk. | $800 | |
| Feb 8, 2017 | Completed final sign-off Nov 2019 | 220 Anza St | interior renovatoin of (e) bedroom & living room, including reconfiguration of closets & th additoin of new full bathroom within the (e) house footprint & enevlop. demo & replacement of wood flooring including gypcrete with per tubes for hydronic radiant heat.Details
interior renovatoin of (e) bedroom & living room, including reconfiguration of closets & th additoin of new full bathroom within the (e) house footprint & enevlop. demo & replacement of wood flooring including gypcrete with per tubes for hydronic radiant heat. | $8,000 | |
| Aug 24, 2016 | Completed final sign-off Nov 2019 | 218 Anza St | demo (e) entry door to 218 anza located underneath stairs to entry for 220 anza.infill w/painted wood siding to match adj finish. dmeo & reframe opening for (e) double hung window at ktichen to accomodate relocated entry door. add full bath with (e) house footprint. rebuild (e) wood stairs to entryDetails
demo (e) entry door to 218 anza located underneath stairs to entry for 220 anza.infill w/painted wood siding to match adj finish. dmeo & reframe opening for (e) double hung window at ktichen to accomodate relocated entry door. add full bath with (e) house footprint. rebuild (e) wood stairs to entry | $8,000 |