Broad Oaks Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Aug 2014 to Aug 2026
- Last 24 months
- 3 permits filed
35 permits since 2000: 29 completed, 2 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2026 | In progress issued Aug 2026 | 4 Presidio Tr | kitchen remodel to remove wall between kitchen and dining room. new cabinets, countertops, fixtures, appliances, and wood floor. meps under seperate permitDetails
kitchen remodel to remove wall between kitchen and dining room. new cabinets, countertops, fixtures, appliances, and wood floor. meps under seperate permit | $250,000 |
| Jul 24, 2025 | Completed final sign-off Feb 2026 | 3600 Jackson St | remodel kitchen: new countertops, fixtures, flooring, appliances, replace window in-kind (not visible from the street). plumbing + electrical on separate permits. like for like.Details
remodel kitchen: new countertops, fixtures, flooring, appliances, replace window in-kind (not visible from the street). plumbing + electrical on separate permits. like for like. | $150,000 |
| Jan 3, 2025 | Completed final sign-off Jul 2025 | 95 Capistrano Av | replace front stairs in kind w/ different material, replace non complianct guardrail. dry rot repair of entry portch, replace front door in kimd. replace 5 front windows in kind w/ marvin ultimate series, replace stuccoDetails
replace front stairs in kind w/ different material, replace non complianct guardrail. dry rot repair of entry portch, replace front door in kimd. replace 5 front windows in kind w/ marvin ultimate series, replace stucco | $10,000 |
| Sep 27, 2024 | Completed final sign-off Feb 2025 | 950 Steiner St | unit #6: remodel kitchen w/ new cabinets, countertops, fixtures, and appliances. remodel bathroom: replace vanity, tub/shower combo, plumbing fixtures, tile, and toilet in kind. electrical and plumbing under separate permit. all work on 3rd flr.Details
unit #6: remodel kitchen w/ new cabinets, countertops, fixtures, and appliances. remodel bathroom: replace vanity, tub/shower combo, plumbing fixtures, tile, and toilet in kind. electrical and plumbing under separate permit. all work on 3rd flr. | $49,000 |
| Aug 23, 2024 | Completed final sign-off Dec 2024 | 190 Ewing Tr | remodel 1 bathroom, replace vanity, shower, plumbing, fixtures, tile, and toilet in kind. electrical and plumbing under separate permitDetails
remodel 1 bathroom, replace vanity, shower, plumbing, fixtures, tile, and toilet in kind. electrical and plumbing under separate permit | $40,000 |
| May 31, 2024 | In progress issued Aug 2024 | 270 Beacon St | remodel bathrooms, voluntary structural work, partial remodel of finishes/rooms, replacement windows and doors, new electrical, new mechanical, remove windows, no additional sf, replace exterior siding.Details
remodel bathrooms, voluntary structural work, partial remodel of finishes/rooms, replacement windows and doors, new electrical, new mechanical, remove windows, no additional sf, replace exterior siding. | $190,000 |
| May 2, 2024 | Expired or cancelled cancelled Oct 2024 | 3447 Clay St | remodel bathroom: replace vanity, tub/shower, plumbing fixtures, tile, and toilet in-kind. electrical and plumbing under seperate permit. non structural.Details
remodel bathroom: replace vanity, tub/shower, plumbing fixtures, tile, and toilet in-kind. electrical and plumbing under seperate permit. non structural. | $40,000 |
| Feb 7, 2024 | Completed final sign-off Aug 2025 | 1032 Broadway | replace exterior doors in-kind to watch existing. 8 doors. proposed project consists of the replacement of non-historic, multilite wood doors with new multilite wood doors matching the material, configuration and operation of the (e) doors in the (e) openings at 5 locations at the south and west eleDetails
replace exterior doors in-kind to watch existing. 8 doors. proposed project consists of the replacement of non-historic, multilite wood doors with new multilite wood doors matching the material, configuration and operation of the (e) doors in the (e) openings at 5 locations at the south and west ele | $35,000 |
| Nov 13, 2023 | Completed final sign-off Jan 2024 | 405 Buchanan St | remodel bathroom: replace vanity, tub, shower, plumbing fixtures, tile, toilet in kind. electrical and plumbing under separate permit.Details
remodel bathroom: replace vanity, tub, shower, plumbing fixtures, tile, toilet in kind. electrical and plumbing under separate permit. | $40,000 |
| Sep 8, 2023 | Completed final sign-off Nov 2023 | 618 25th Av | to comply w/ physical inspection report #cc-8608. (no construction work allowed under this permit)Details
to comply w/ physical inspection report #cc-8608. (no construction work allowed under this permit) | $20,000 |
| Feb 2, 2023 | Never finaled issued Mar 2023, no final | 4248 23rd St | in kind remodel of 2 (e) restrooms & 1 kitchen on 2nd fl. new paint & finishes. widen (e) door opening btw living and kitchen.Details
in kind remodel of 2 (e) restrooms & 1 kitchen on 2nd fl. new paint & finishes. widen (e) door opening btw living and kitchen. | $50,000 |
| Feb 2, 2023 | Completed final sign-off Jan 2024 | 4248 23rd St | t.i. on ground fl: demo of (e) interior partitions, electrical, plumbing and new finishes thruout, use to remain as (e)Details
t.i. on ground fl: demo of (e) interior partitions, electrical, plumbing and new finishes thruout, use to remain as (e) | $125,000 |
| Nov 28, 2022 | Completed final sign-off Aug 2023 | 806 32nd Av | convert 330 sq ft of e unconditioned storage space into habitable space on gr fl garage level of e 1926 3 story dwelling. work includes a sleeping/living area, a wet bar, and bath. no change to footprint or openings. no work visible from street.Details
convert 330 sq ft of e unconditioned storage space into habitable space on gr fl garage level of e 1926 3 story dwelling. work includes a sleeping/living area, a wet bar, and bath. no change to footprint or openings. no work visible from street. | $200,000 |
| Nov 21, 2022 | Completed final sign-off Sep 2023 | 3580 Washington St | 2/f: replace handrails @ (e) stairs. demolish (e) secondary stair. patch w/ new partitions & ceiling. 3rd fl: demo n.w. stairwell to 4/f. patch w/ new floor. new laundry closet. new lighting in (e) ceilings. demo (e) ceiling for new stair opening. extend stair stairwell (s.e. side) to 4/f. 4/f: demoDetails
2/f: replace handrails @ (e) stairs. demolish (e) secondary stair. patch w/ new partitions & ceiling. 3rd fl: demo n.w. stairwell to 4/f. patch w/ new floor. new laundry closet. new lighting in (e) ceilings. demo (e) ceiling for new stair opening. extend stair stairwell (s.e. side) to 4/f. 4/f: demo | $42,000 |
| Jul 28, 2022 | Completed final sign-off Sep 2023 | 3580 Washington St | work on the second floor: demolition of (e0 kitchen, demolition of (e) partition, (n) openig in (e) partition, (n) kitchen cabinets and finishes inplace. (n) lighting & electrical at kitchen & dining rm, window & door replacement @ north side of bldg. not visible.Details
work on the second floor: demolition of (e0 kitchen, demolition of (e) partition, (n) openig in (e) partition, (n) kitchen cabinets and finishes inplace. (n) lighting & electrical at kitchen & dining rm, window & door replacement @ north side of bldg. not visible. | $57,305 |
| Jul 18, 2022 | Completed final sign-off Sep 2023 | 3580 Washington St | remodel 3rd floor bathroom and replace vanity, shower, plumbing fixtures, tile, and toilet in kind. plumbing and electrical on seperate permits.Details
remodel 3rd floor bathroom and replace vanity, shower, plumbing fixtures, tile, and toilet in kind. plumbing and electrical on seperate permits. | $40,000 |
| Aug 27, 2021 | Completed final sign-off Feb 2022 | 1586 Funston Av | kitchen remodel: new cabinets, fixtures, countertops and appliances. remodel hall barhroom: replace vanity, tub/shower combo, plumbing fixtures, tile and toliet in kind. remodel en-suite bathroom: replace vanity, tile, plumbing fixtures, toilet in kind. electrical and plumbing on separate permits.Details
kitchen remodel: new cabinets, fixtures, countertops and appliances. remodel hall barhroom: replace vanity, tub/shower combo, plumbing fixtures, tile and toliet in kind. remodel en-suite bathroom: replace vanity, tile, plumbing fixtures, toilet in kind. electrical and plumbing on separate permits. | $65,000 |
| Jul 1, 2021 | Completed final sign-off Mar 2022 | 4245 23rd St | fixtures, new vanity and finishes. scope of demolition is non structural, down to subfloor and backer board as required for new finishes. no changes to (e) walls and no new walls. no add. plumbing fixtures.Details
fixtures, new vanity and finishes. scope of demolition is non structural, down to subfloor and backer board as required for new finishes. no changes to (e) walls and no new walls. no add. plumbing fixtures. | $40,000 |
| Apr 7, 2021 | Completed final sign-off Jul 2022 | 637 Brussels St | removal of walls to open living space, new kitchen remodel, addition of 2 bathrooms and 1 bedroom. demolition of structural and non structural partitions, removal of floor for new openings and added stair. addition of windows, walls and doors.Details
removal of walls to open living space, new kitchen remodel, addition of 2 bathrooms and 1 bedroom. demolition of structural and non structural partitions, removal of floor for new openings and added stair. addition of windows, walls and doors. | $80,000 |
| Dec 15, 2020 | Completed final sign-off May 2021 | 458 35th Av | remodel kitchen & new cabinets countertops, fixtures, appliances, and floor tile, remodel 1 bathroom: replace tub/shower combo with shower, replace toilet, plumbing fixtues, vanity and tile in kind, plumbing and elec and electrial on sep permits.Details
remodel kitchen & new cabinets countertops, fixtures, appliances, and floor tile, remodel 1 bathroom: replace tub/shower combo with shower, replace toilet, plumbing fixtues, vanity and tile in kind, plumbing and elec and electrial on sep permits. | $42,000 |
| Dec 10, 2020 | Completed final sign-off May 2021 | 1960 Ellis St | remodel kitchen new cabinets, countertops, fixtures, appliances. remodel baths, replace shower, vanity, toilet, plumbing fixtures, tile in kind. replace bath window in kind. plumbing and elec on separate permitDetails
remodel kitchen new cabinets, countertops, fixtures, appliances. remodel baths, replace shower, vanity, toilet, plumbing fixtures, tile in kind. replace bath window in kind. plumbing and elec on separate permit | $45,000 |
| Dec 2, 2020 | Completed final sign-off Apr 2021 | 715 46th Av | remodel kitchen: new cabinets, countertops, fixtures, appliances, replace window in-kind not visible from street; remodel bathroom: replace vanity, tub/shower combo, plumbing fixtures, tile, toilet in-kind, replace window in-kind not visible from streetDetails
remodel kitchen: new cabinets, countertops, fixtures, appliances, replace window in-kind not visible from street; remodel bathroom: replace vanity, tub/shower combo, plumbing fixtures, tile, toilet in-kind, replace window in-kind not visible from street | $48,000 |
| Dec 2, 2020 | Completed final sign-off Mar 2021 | 1940 Washington St | (5) sash windows replaced in-kind, wood in, wood out. street facing - to match google photo 2019 having wood and curved sashes and true divided lites.Details
(5) sash windows replaced in-kind, wood in, wood out. street facing - to match google photo 2019 having wood and curved sashes and true divided lites. | $7,500 |
| Nov 10, 2020 | Completed final sign-off Feb 2022 | 2313 Jones St | interior remodel at unit #2, (3rd fl). work to include new bathroom adjacent to bedroom. remodel kitchen and existing bathroom. turn wc into full vanity at foyer. strengthen roof and provide new b.u. roofing.Details
interior remodel at unit #2, (3rd fl). work to include new bathroom adjacent to bedroom. remodel kitchen and existing bathroom. turn wc into full vanity at foyer. strengthen roof and provide new b.u. roofing. | $45,000 |
| Oct 9, 2020 | Completed final sign-off Oct 2020 | 2667 17th Av | voluntary structural work: add additional bolts to secure house to foundation.Details
voluntary structural work: add additional bolts to secure house to foundation. | $1,000 |
| Sep 28, 2020 | Completed final sign-off Jan 2021 | 792 19th Av | unit #792: install stacked washer & dryer. remove 2 chase at kitchen area.Details
unit #792: install stacked washer & dryer. remove 2 chase at kitchen area. | $10,000 |
| Aug 28, 2020 | Completed final sign-off Jan 2021 | 15 Winfield St | remodel bathroom: replace vanity, tub/shower combo, plumbing fixtures, tile, and toilet in-kind, electrical and plumbing under separate permit, kitchen: replace tile on floorDetails
remodel bathroom: replace vanity, tub/shower combo, plumbing fixtures, tile, and toilet in-kind, electrical and plumbing under separate permit, kitchen: replace tile on floor | $15,000 |
| Jul 14, 2020 | Completed final sign-off Oct 2020 | 792 19th Av | remodel kitchen with cabinets, countertops, fixtures, applicances and tile fl. remodel bathrooms: replace vanity, tub/shower, combo,plumbing fixtures, tile and toilet in kind. electrical & plumbing under separate permit.Details
remodel kitchen with cabinets, countertops, fixtures, applicances and tile fl. remodel bathrooms: replace vanity, tub/shower, combo,plumbing fixtures, tile and toilet in kind. electrical & plumbing under separate permit. | $49,000 |
| Dec 9, 2019 | Completed final sign-off May 2020 | 1924 Washington St | 3rd fl: convert two closets: one into a half bath and other into a laundry (no sink).Details
3rd fl: convert two closets: one into a half bath and other into a laundry (no sink). | $8,000 |
| Dec 5, 2019 | Completed final sign-off May 2020 | 1924 Washington St | 2nd floor convert closet to bathroom. 2nd floor convert closet to laundry room.Details
2nd floor convert closet to bathroom. 2nd floor convert closet to laundry room. | $5,800 |
| Nov 8, 2019 | Completed final sign-off May 2020 | 1924 Washington St | repair dry rot. replace sheathing and siding at rear of building. not visible from streetDetails
repair dry rot. replace sheathing and siding at rear of building. not visible from street | $20,000 |
| Oct 25, 2019 | Expired or cancelled cancelled Nov 2021 | 2315 Jones St | remodel kitchen, new cabinets, counter tops, appliances, fixtures. remodel bathroom new countertops, tile, shower tub and fixtures. electrical and plumbing under sep permits.Details
remodel kitchen, new cabinets, counter tops, appliances, fixtures. remodel bathroom new countertops, tile, shower tub and fixtures. electrical and plumbing under sep permits. | $38,700 |
| Oct 11, 2019 | Completed final sign-off May 2020 | 1924 Washington St | renovation of a 2 unit building:each unit: remodel kitchens with new cabinets, counterops, fixtures, appliances, tile floor. replace in-kind the (e) kitchen windows (not visible to street); remodel bathrooms with new vanities, tile show, tub & fixtures, electrical and plumbing under separate permit.Details
renovation of a 2 unit building:each unit: remodel kitchens with new cabinets, counterops, fixtures, appliances, tile floor. replace in-kind the (e) kitchen windows (not visible to street); remodel bathrooms with new vanities, tile show, tub & fixtures, electrical and plumbing under separate permit. | $80,000 |
| Apr 16, 2015 | Completed final sign-off Aug 2015 | 106 Wool St | to comply with complaint #201538381: replace (e) kitchen cabinetry with new. add new appliances, new ceramic tile. replace ceramic tile in bathroom. new bathroom fixtures.Details
to comply with complaint #201538381: replace (e) kitchen cabinetry with new. add new appliances, new ceramic tile. replace ceramic tile in bathroom. new bathroom fixtures. | $45,000 |
| Aug 29, 2014 | Never finaled issued Aug 2014, no final | 1045 Green St | window replacement not visible from strret u-factor not exceed 0.32Details
window replacement not visible from strret u-factor not exceed 0.32 | $7,000 |