Broad Oaks Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Aug 2014 to Aug 2026
- Last 24 months
- 3 permits filed
35 permits since 2000: 29 completed, 2 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 46 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2025 | Completed final sign-off Jul 2025 | 95 Capistrano Av | replace front stairs in kind w/ different material, replace non complianct guardrail. dry rot repair of entry portch, replace front door in kimd. replace 5 front windows in kind w/ marvin ultimate series, replace stuccoDetails
replace front stairs in kind w/ different material, replace non complianct guardrail. dry rot repair of entry portch, replace front door in kimd. replace 5 front windows in kind w/ marvin ultimate series, replace stucco | $10,000 |
| Nov 21, 2022 | Completed final sign-off Sep 2023 | 3580 Washington St | 2/f: replace handrails @ (e) stairs. demolish (e) secondary stair. patch w/ new partitions & ceiling. 3rd fl: demo n.w. stairwell to 4/f. patch w/ new floor. new laundry closet. new lighting in (e) ceilings. demo (e) ceiling for new stair opening. extend stair stairwell (s.e. side) to 4/f. 4/f: demoDetails
2/f: replace handrails @ (e) stairs. demolish (e) secondary stair. patch w/ new partitions & ceiling. 3rd fl: demo n.w. stairwell to 4/f. patch w/ new floor. new laundry closet. new lighting in (e) ceilings. demo (e) ceiling for new stair opening. extend stair stairwell (s.e. side) to 4/f. 4/f: demo | $42,000 |
| Apr 7, 2021 | Completed final sign-off Jul 2022 | 637 Brussels St | removal of walls to open living space, new kitchen remodel, addition of 2 bathrooms and 1 bedroom. demolition of structural and non structural partitions, removal of floor for new openings and added stair. addition of windows, walls and doors.Details
removal of walls to open living space, new kitchen remodel, addition of 2 bathrooms and 1 bedroom. demolition of structural and non structural partitions, removal of floor for new openings and added stair. addition of windows, walls and doors. | $80,000 |