Reza & Amir Nabipour
- Listed as
- authorized agent-others, contractor
- Firm
- Nabi Construction & Engineering Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Sep 2026
400 permits since 2000 (contractor on 400 permits, authorized agent-others on 8 permits): 336 completed, 10 in progress, 24 never finaled, 30 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 400.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 3679 Fillmore St | Nabi Construction & Engineering Inc | exploratory demolition and repair in kind of sheet rock in interior of both units. approx. 80 numbers of 5 feet by 5 feet. approx. 2,000 sq ft.Details
exploratory demolition and repair in kind of sheet rock in interior of both units. approx. 80 numbers of 5 feet by 5 feet. approx. 2,000 sq ft. | $8,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 2100 Pine St | Nabi Construction & Engineering Inc | exploratory demoliton of sheetrock, replace in kindDetails
exploratory demoliton of sheetrock, replace in kind | $8,000 |
| Aug 21, 2026 | In progress issued Aug 2026 | 1321 Cole St | Nabi Construction & Engineering Inc | exploratory demo only of sheetrock replace in kindDetails
exploratory demo only of sheetrock replace in kind | $8,000 |
| Jul 8, 2026 | In progress issued Aug 2026 | 2001 Fillmore St | Nabi Construction & Engineering Inc | @ e uft shaft @ ground fl: remove e lift. remove e wood post @ lift area. provide new steel columns, n steel columns, new beam at 2nd fl. new lift by others.Details
@ e uft shaft @ ground fl: remove e lift. remove e wood post @ lift area. provide new steel columns, n steel columns, new beam at 2nd fl. new lift by others. | $45,000 |
| May 27, 2026 | In progress issued Jun 2026 | 250 El Camino Del Mar | Nabi Construction & Engineering Inc | 1) demo (e) stairs & storage and build (n) stair & storage between grid lines b & d. 2) demo (e) stair and build (n) stair & deck between grid lines f & g. to comply with nov 202314852.Details
1) demo (e) stairs & storage and build (n) stair & storage between grid lines b & d. 2) demo (e) stair and build (n) stair & deck between grid lines f & g. to comply with nov 202314852. | $35,000 |
| May 13, 2026 | In progress issued May 2026 | 2220 Fillmore St | Nabi Construction & Engineering Inc | revision to pa# 202508042264: add (n) 2x8 @ 16" o.c to 2nd floor framing to support additional (n) clg. wt. of 10psf at 2nd floor as shown on plans.Details
revision to pa# 202508042264: add (n) 2x8 @ 16" o.c to 2nd floor framing to support additional (n) clg. wt. of 10psf at 2nd floor as shown on plans. | $10,000 |
| Apr 29, 2026 | In progress issued Apr 2026 | 2207 Fillmore St | Nabi Construction & Engineering Inc | commericial retail: exploratory demo for commerical space ground floor. explroration for structural information and will stay open to close with a new permit to patch existing to compliance.Details
commericial retail: exploratory demo for commerical space ground floor. explroration for structural information and will stay open to close with a new permit to patch existing to compliance. | $1,500 |
| Apr 1, 2026 | Expired or cancelled withdrawn Apr 2026 | 2065 Ofarrell St | Nabi Construction & Engineering Inc | to obtain final inspection for pa# 202501148324. all work is complete.Details
to obtain final inspection for pa# 202501148324. all work is complete. | |
| Mar 27, 2026 | Completed final sign-off May 2026 | 160 Noe St | Nabi Construction & Engineering Inc | to obtain final inspection for work approved under pa# 202409170954 & 202405081684. all work is complete.Details
to obtain final inspection for work approved under pa# 202409170954 & 202405081684. all work is complete. | |
| Mar 26, 2026 | Expired or cancelled withdrawn Sep 2026 | 2259 Fillmore St | Nabi Construction & Engineering Inc | new bearing wall & footing. remove (e) column and provide new column. assessibility deferred under future ti per ab-017.Details
new bearing wall & footing. remove (e) column and provide new column. assessibility deferred under future ti per ab-017. | $24,000 |
| Feb 24, 2026 | Completed final sign-off Jul 2026 | 1729 Polk St | Nabi Construction & Engineering Inc | g/f: demo (e) portion of 1/f courtyard and replace with new floor. remove portion of (e) concrete topping and replace with new topping as shown on plan. deck is for residential use only.Details
g/f: demo (e) portion of 1/f courtyard and replace with new floor. remove portion of (e) concrete topping and replace with new topping as shown on plan. deck is for residential use only. | $15,000 |
| Jan 13, 2026 | Completed final sign-off Apr 2026 | 1650 Jones St | Nabi Construction & Engineering Inc | revision to 202505065918: replace e) footing as shown on detail 1 &2. remove damaged 3 x 4 studs & replace w/ new 4 x 6 stud as requires at lightwellDetails
revision to 202505065918: replace e) footing as shown on detail 1 &2. remove damaged 3 x 4 studs & replace w/ new 4 x 6 stud as requires at lightwell | |
| Dec 23, 2025 | Completed final sign-off Apr 2026 | 1650 Jones St | Nabi Construction & Engineering Inc | revision to 202505065918. revise shear walls at grid lines d and e as per field conditionsDetails
revision to 202505065918. revise shear walls at grid lines d and e as per field conditions | |
| Dec 3, 2025 | Completed final sign-off Mar 2026 | 1373 Clay St | Nabi Construction & Engineering Inc | remove existing slab on grade in electrical room and lower slap on grade by 2'-0"Details
remove existing slab on grade in electrical room and lower slap on grade by 2'-0" | $35,000 |
| Oct 27, 2025 | In progress issued Oct 2025 | 2220 Fillmore St | Nabi Construction & Engineering Inc | revision to pa # 2025-0804-2264. provide new steel beam at 2nd fl midspan between grid line 3.2 & 4Details
revision to pa # 2025-0804-2264. provide new steel beam at 2nd fl midspan between grid line 3.2 & 4 | |
| Aug 4, 2025 | In progress issued Aug 2025 | 2220 Fillmore St | Nabi Construction & Engineering Inc | lower floor at back at vacant space for future t.i. accessiblity deferred per ab17. lower portion of (e) first floor between grid line 3 & 4 and provide new steel moment frame.Details
lower floor at back at vacant space for future t.i. accessiblity deferred per ab17. lower portion of (e) first floor between grid line 3 & 4 and provide new steel moment frame. | $55,000 |
| May 21, 2025 | Completed final sign-off Apr 2026 | 1650 Jones St | Nabi Construction & Engineering Inc | mandatory soft story retrofit in accordance with city ordinance 66-13, following 2022 cebc chapter 4d and appendix a-4.Details
mandatory soft story retrofit in accordance with city ordinance 66-13, following 2022 cebc chapter 4d and appendix a-4. | $85,000 |
| Mar 25, 2025 | Completed final sign-off Oct 2026 | 2065 Ofarrell St | Nabi Construction & Engineering Inc | interior remodel: remodel existing kitchen and baths, add bath at each unit. open wall @ kitchen.Details
interior remodel: remodel existing kitchen and baths, add bath at each unit. open wall @ kitchen. | $464,000 |
| Jan 28, 2025 | Completed final sign-off Aug 2025 | 1396 Pacific Av | Nabi Construction & Engineering Inc | revision 202411205887 (bathroom remodel) to include additional bathroom remodel kitchen and add closet to bedroomDetails
revision 202411205887 (bathroom remodel) to include additional bathroom remodel kitchen and add closet to bedroom | $70,000 |
| Jan 14, 2025 | Completed final sign-off Sep 2026 | 2065 Ofarrell St | Nabi Construction & Engineering Inc | remove (e) wood beam and wood post and replace with (n) steel beam and (n) steal column at grid line (b) at second floor framing located in garage onlyDetails
remove (e) wood beam and wood post and replace with (n) steel beam and (n) steal column at grid line (b) at second floor framing located in garage only | $20,000 |
| Dec 23, 2024 | In progress issued Jan 2025 | 4172 23rd St | Nabi Construction & Engineering Inc | remodel sfd: convert first story storage area to habitable bedroom, bath & laundry closet with (n) stair. remove bath @ 2nd story, add powder room. add bathroom @ top fl & remodel (e) bath. replace aluminum windows at front facadeDetails
remodel sfd: convert first story storage area to habitable bedroom, bath & laundry closet with (n) stair. remove bath @ 2nd story, add powder room. add bathroom @ top fl & remodel (e) bath. replace aluminum windows at front facade | $328,000 |
| Sep 17, 2024 | Expired or cancelled expired Mar 2026 | 160 Noe St | Nabi Construction & Engineering Inc | revision to pa 202406245066 minor reconfiguration of bathroms, closets kitchens 160 & 162. add rear deck and associated firewall. replace rear windows @ dining with door. structural upgrades to rear volumeDetails
revision to pa 202406245066 minor reconfiguration of bathroms, closets kitchens 160 & 162. add rear deck and associated firewall. replace rear windows @ dining with door. structural upgrades to rear volume | $44,000 |
| Aug 1, 2024 | Completed final sign-off Dec 2024 | 558 Capp St | Ken O'sullivan Construction And Renovati, Nabi Construction & Engineering Inc | replace existing stairs with new concrete in same configuration. exterior shall be smooth stucco. existing hardship addressed in completed permit application pa#202212299396Details
replace existing stairs with new concrete in same configuration. exterior shall be smooth stucco. existing hardship addressed in completed permit application pa#202212299396 | $25,000 |
| Jul 26, 2024 | Completed final sign-off Mar 2025 | 900 Pine St | Nabi Construction & Engineering Inc | revision to pa # 202407106178: at gridline 2: remove (e) wood wall between 1/f & 2/f, provide new beam at 2/f w/ new post and footing.Details
revision to pa # 202407106178: at gridline 2: remove (e) wood wall between 1/f & 2/f, provide new beam at 2/f w/ new post and footing. | $5,000 |
| Jul 11, 2024 | Completed final sign-off Nov 2024 | 565 Chenery St | Nabi Construction & Engineering Inc | legalize a 2-story, 246 sq. ft. +/-, rear yard-facing addition to a sfr that was built without a permit, perform sterngthening of existing vertical and lateral force resisting elements to be in compliance with current building code requirements.Details
legalize a 2-story, 246 sq. ft. +/-, rear yard-facing addition to a sfr that was built without a permit, perform sterngthening of existing vertical and lateral force resisting elements to be in compliance with current building code requirements. | $15,000 |
| Jul 10, 2024 | Completed final sign-off Mar 2025 | 900 Pine St | Nabi Construction & Engineering Inc | voluntary seismic upgrade for soft story as per san francisco (e) building code chapter 4d and appendix a-4. new accessible restroom at ground level.Details
voluntary seismic upgrade for soft story as per san francisco (e) building code chapter 4d and appendix a-4. new accessible restroom at ground level. | $140,000 |
| Jun 24, 2024 | Completed final sign-off May 2026 | 160 Noe St | Nabi Construction & Engineering Inc | remodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living areaDetails
remodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living area | $433,000 |
| May 8, 2024 | Expired or cancelled expired Mar 2026 | 160 Noe St | Nabi Construction & Engineering Inc | removal of (e) wood colums and (e) wood beams under 2nd fl. and provide new steel colums and beams. volutary seismic strenthing of (e) buildingDetails
removal of (e) wood colums and (e) wood beams under 2nd fl. and provide new steel colums and beams. volutary seismic strenthing of (e) building | $40,000 |
| Apr 23, 2024 | Completed final sign-off Oct 2024 | 1350 Washington St | Nabi Construction & Engineering Inc | 1) remove portion extg damaged retaining wall and replace with new pour in place concrete retaining wall at grid line a. 2) remove extg damaged footing and replace with new pour in place concrete footing at grid line bDetails
1) remove portion extg damaged retaining wall and replace with new pour in place concrete retaining wall at grid line a. 2) remove extg damaged footing and replace with new pour in place concrete footing at grid line b | $40,000 |
| Mar 28, 2024 | Completed final sign-off Jul 2024 | 595 Diamond St | Nabi Construction & Engineering Inc | new deck over existing garage roofDetails
new deck over existing garage roof | $25,000 |
| Feb 21, 2024 | Completed final sign-off Apr 2024 | 2660 Webster St | Nabi Construction & Engineering Inc | revision to 202312041843. repair (e) balcony, replace (e) framing w/ new framing in kind on ground fl unit onlyDetails
revision to 202312041843. repair (e) balcony, replace (e) framing w/ new framing in kind on ground fl unit only | $5,000 |
| Dec 15, 2023 | Completed final sign-off May 2024 | 49 Linda St | Nabi Construction & Engineering Inc | remove existing exterior stairs and replace in kind with new stairsDetails
remove existing exterior stairs and replace in kind with new stairs | $20,000 |
| Dec 11, 2023 | Completed final sign-off Apr 2024 | 808 Cabrillo St | Nabi Construction & Engineering Inc | structural stengthening of existing building (voluntary).Details
structural stengthening of existing building (voluntary). | $20,000 |
| Dec 4, 2023 | Completed final sign-off Apr 2024 | 2660 Webster St | Nabi Construction & Engineering Inc | remove (e) damaged 5 ft height retaining wall with new pour in place concrete retaining wall at grid line a.Details
remove (e) damaged 5 ft height retaining wall with new pour in place concrete retaining wall at grid line a. | $10,000 |
| Nov 14, 2023 | Completed final sign-off Feb 2024 | 406 Clayton St | Nabi Construction & Engineering Inc | remove e 3 columns under 2nd fl and portion of e wood beam at 2nd fl at line b. add 3 hss steel column and steel beam. no exterior work.Details
remove e 3 columns under 2nd fl and portion of e wood beam at 2nd fl at line b. add 3 hss steel column and steel beam. no exterior work. | $25,000 |
| Sep 21, 2023 | Completed final sign-off Apr 2024 | 3575 Fillmore St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sf existing 2022 building code chapter 4d and appendix a4 to comply with nov 202302582Details
seismic upgrade for soft story as per sf existing 2022 building code chapter 4d and appendix a4 to comply with nov 202302582 | $45,000 |
| Aug 22, 2023 | Completed final sign-off Sep 2023 | 332 Presidio Av | Nabi Construction & Engineering Inc | revision to permit application 202307071699. add new concrete footing to new wall panel to strengthen (e) damaged retaining wall to comply with nov 202200131.Details
revision to permit application 202307071699. add new concrete footing to new wall panel to strengthen (e) damaged retaining wall to comply with nov 202200131. | |
| Jul 7, 2023 | Completed final sign-off Aug 2023 | 2525 Fillmore St | Nabi Construction & Engineering Inc | revision to 202301300975: move down shear wall at gridline 1. shift shear wall from gridline c to c.5. new foundation for shear wall at gridline d. modify moment frame top connection at gridline eDetails
revision to 202301300975: move down shear wall at gridline 1. shift shear wall from gridline c to c.5. new foundation for shear wall at gridline d. modify moment frame top connection at gridline e | |
| Jul 7, 2023 | Completed final sign-off Sep 2023 | 332 Presidio Av | Nabi Construction & Engineering Inc | provide new concrete wall panel to strenghten existing damage retaining wall to comply with nov 202200131Details
provide new concrete wall panel to strenghten existing damage retaining wall to comply with nov 202200131 | $10,000 |
| Jul 5, 2023 | Completed final sign-off Jan 2024 | 1136 Kearny St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4 | $45,000 |
| Jun 29, 2023 | Completed final sign-off Jun 2024 | 3263 Mission St | Nabi Construction & Engineering Inc | to comply w/ nov #202304518 remove (e) illegal additon at back of building. inatall resilient channel 5/8 dej wall over e) plastered ceiling for sound @ 3265 mission. horizontal addition under pa2015-1118-3037 to be recognized by planningDetails
to comply w/ nov #202304518 remove (e) illegal additon at back of building. inatall resilient channel 5/8 dej wall over e) plastered ceiling for sound @ 3265 mission. horizontal addition under pa2015-1118-3037 to be recognized by planning | $10,000 |
| May 10, 2023 | Completed final sign-off Jun 2023 | 1400 17th St | Nabi Construction & Engineering Inc | revision to close out permit 202106142352. record on plan all completed work for bpa 202106142352 (interior and exterior ramps, interior and exterior steps - all within property line). bldg to remain unoccuiped until future ti is applied. t-24 calculation should be provided with future ti.Details
revision to close out permit 202106142352. record on plan all completed work for bpa 202106142352 (interior and exterior ramps, interior and exterior steps - all within property line). bldg to remain unoccuiped until future ti is applied. t-24 calculation should be provided with future ti. | |
| May 5, 2023 | Expired or cancelled cancelled Jan 2026 | 1000 Mariposa St | Nabi Construction & Engineering Inc | replace in-kind of existing wood framing damaged by fire at existing loading dock.Details
replace in-kind of existing wood framing damaged by fire at existing loading dock. | $5,000 |
| Jan 30, 2023 | Completed final sign-off Sep 2023 | 2525 Fillmore St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per san francisco bldg code chapter 4d, 2019 cebc appendiz a-4.Details
seismic upgrade for soft story as per san francisco bldg code chapter 4d, 2019 cebc appendiz a-4. | $45,000 |
| Dec 22, 2022 | Never finaled issued Dec 2022, no final | 2200 Jerrold Av | Nabi Construction & Engineering Inc | anchor existing concrete walls with exsting roof diaphargm for out-of-place lateral loadsDetails
anchor existing concrete walls with exsting roof diaphargm for out-of-place lateral loads | $150,000 |
| Oct 6, 2022 | Completed final sign-off Oct 2024 | 837 Fillmore St | Nabi Construction & Engineering Inc | revision to pa# 201809190801 and 201809170549. modification on foundation and posts due to (e) condition.Details
revision to pa# 201809190801 and 201809170549. modification on foundation and posts due to (e) condition. | |
| Sep 16, 2022 | Completed final sign-off Mar 2023 | 282 09th St | Nabi Construction & Engineering Inc | to comply with accessible business entrance ordinance 51-16 at four commercial addresses. to install power door operator at each store. ref. abe # 201901144282, 201901234616, 201901154332, 201901234617.Details
to comply with accessible business entrance ordinance 51-16 at four commercial addresses. to install power door operator at each store. ref. abe # 201901144282, 201901234616, 201901154332, 201901234617. | $45,000 |
| Aug 2, 2022 | Completed final sign-off Aug 2023 | 900 Pine St | Nabi Construction & Engineering Inc | to comply w/accessible business entrance program per ordinance 51-16. abe201901144277. comply w/ada requirement @ front door. special inspections & tests are required as per building code section 1701Details
to comply w/accessible business entrance program per ordinance 51-16. abe201901144277. comply w/ada requirement @ front door. special inspections & tests are required as per building code section 1701 | $45,000 |
| May 24, 2022 | Completed final sign-off Sep 2023 | 1170 Powell St | Nabi Construction & Engineering Inc | accessible business entrance program per ordinance 51-16. comply to ada work requirement in the front doorDetails
accessible business entrance program per ordinance 51-16. comply to ada work requirement in the front door | $35,000 |
| Apr 19, 2022 | Completed final sign-off Jul 2022 | 529 Broderick St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfbc ch 4d, 2019 cebc appendix a-4Details
seismic upgrade for soft story as per sfbc ch 4d, 2019 cebc appendix a-4 | $75,000 |
| Mar 10, 2022 | Completed final sign-off Jun 2023 | 1400 17th St | Nabi Construction & Engineering Inc | revision to pa# 202106142352. demo (e) concrete slab on grade & replace with new concrete slab on grade.Details
revision to pa# 202106142352. demo (e) concrete slab on grade & replace with new concrete slab on grade. | $30,000 |
| Jan 5, 2022 | Never finaled issued Jan 2022, no final | 3527 18th St | Nabi Construction & Engineering Inc | fire department review only on pa #201901180801(missed on routing)ref# 201403271860.Details
fire department review only on pa #201901180801(missed on routing)ref# 201403271860. | |
| Oct 21, 2021 | Completed final sign-off May 2022 | 1040 Mason St | Nabi Construction & Engineering Inc | replace of existing 8" brick and concrete wall with new concrete wall. not visible from street.Details
replace of existing 8" brick and concrete wall with new concrete wall. not visible from street. | $20,000 |
| Aug 17, 2021 | Completed final sign-off Sep 2022 | 695 33rd Av | Nabi Construction & Engineering Inc | replace plywood shear walls with steel moment frame in the garage. revision to app#201809130147.Details
replace plywood shear walls with steel moment frame in the garage. revision to app#201809130147. | $10,000 |
| Jun 14, 2021 | Completed final sign-off Jun 2023 | 1400 17th St | Nabi Construction & Engineering Inc | t.i.: demo of (e) non-complying store front, (e) rollup garage door and (n) constructoin of new partiions, new finishes, (n) finishes and accessible restrooms, (n) accessible ramp, (n) accessible main entry, (n) accessible rear yard entrance.deferred f/a, l/s, meps.Details
t.i.: demo of (e) non-complying store front, (e) rollup garage door and (n) constructoin of new partiions, new finishes, (n) finishes and accessible restrooms, (n) accessible ramp, (n) accessible main entry, (n) accessible rear yard entrance.deferred f/a, l/s, meps. | $120,000 |
| Jun 2, 2021 | Completed final sign-off Dec 2021 | 230 Sanchez St | Nabi Construction & Engineering Inc | rev to pa #202011098537 (residential). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5.Details
rev to pa #202011098537 (residential). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5. | |
| Jun 2, 2021 | Completed final sign-off Dec 2021 | 230 Sanchez St | Nabi Construction & Engineering Inc | rev to pa #202011098538 (commercial). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5.Details
rev to pa #202011098538 (commercial). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5. | |
| Feb 10, 2021 | Completed final sign-off Jul 2021 | 772 06th Av | Nabi Construction & Engineering Inc | revision to pa# 202003126906. modify moment frame connection. replace (e) brick with (n) cont ftg. add (n) conc ftg to (e) brick ftg. modify shear wall ftg.Details
revision to pa# 202003126906. modify moment frame connection. replace (e) brick with (n) cont ftg. add (n) conc ftg to (e) brick ftg. modify shear wall ftg. | $5,000 |
| Nov 9, 2020 | Completed final sign-off Dec 2021 | 230 Sanchez St | Nabi Construction & Engineering Inc | revision to pa 201809129917 (residential) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098538.Details
revision to pa 201809129917 (residential) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098538. | |
| Nov 9, 2020 | Completed final sign-off Dec 2021 | 230 Sanchez St | Nabi Construction & Engineering Inc | revision to pa 201809129921 (commercial) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098537.Details
revision to pa 201809129921 (commercial) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098537. | |
| Mar 13, 2020 | Completed final sign-off Jan 2021 | 1488 Pine St | Nabi Construction & Engineering Inc | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. residential under pa #202003136992Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. residential under pa #202003136992 | $56,060 |
| Mar 13, 2020 | Completed final sign-off Jan 2021 | 1488 Pine St | Nabi Construction & Engineering Inc | residential soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. commercial under pa #202003136990Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. commercial under pa #202003136990 | $112,140 |
| Mar 12, 2020 | Completed final sign-off Jul 2021 | 772 06th Av | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sf building code 4d, 2016 cebc appendix a-4Details
seismic upgrade for soft story as per sf building code 4d, 2016 cebc appendix a-4 | $110,000 |
| Feb 10, 2020 | Completed final sign-off Mar 2020 | 160 10th St | Nabi Construction & Engineering Inc | a)revision to app#201810233935. b)demo extg ramp and provide new 2 steps at line b. c)change extg door swing at extg restroom.Details
a)revision to app#201810233935. b)demo extg ramp and provide new 2 steps at line b. c)change extg door swing at extg restroom. | |
| Dec 19, 2019 | Never finaled issued Feb 2020, no final | 130 Gough St | Nabi Construction & Engineering Inc | street spaceDetails
street space | |
| Dec 12, 2019 | Completed final sign-off May 2020 | 801 Haight St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. | $95,000 |
| Dec 12, 2019 | Completed final sign-off Mar 2020 | 830 Hayes St | Nabi Construction & Engineering Inc | revision to app#201907095444 for soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. revision at moment frames and relocate shearwall from line 1 to line 1.3Details
revision to app#201907095444 for soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. revision at moment frames and relocate shearwall from line 1 to line 1.3 | |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 1327 Lyon St | Nabi Construction & Engineering Inc | street spaceDetails
street space | |
| Oct 18, 2019 | Completed final sign-off Dec 2019 | 2200 Hyde St | Nabi Construction & Engineering Inc | rev to pa# 20171143881; new curb foundation additional plywoodDetails
rev to pa# 20171143881; new curb foundation additional plywood | |
| Jul 9, 2019 | Completed final sign-off Mar 2020 | 830 Hayes St | Nabi Construction & Engineering Inc | seismic upgrade for soft story per seismic building code chapter 4d, 2016 cebc appendix a4Details
seismic upgrade for soft story per seismic building code chapter 4d, 2016 cebc appendix a4 | $120,000 |
| Jul 9, 2019 | Completed final sign-off Nov 2019 | 860 Divisadero St | Nabi Construction & Engineering Inc | revision to 201904238743 (e), 201004238744 (r), provide new steel frame at line 6 in lieu of shear walls, g.l. 5&6. relocate steel moment frame at line 7 and revise shear transfer detail (commercial retail store)Details
revision to 201904238743 (e), 201004238744 (r), provide new steel frame at line 6 in lieu of shear walls, g.l. 5&6. relocate steel moment frame at line 7 and revise shear transfer detail (commercial retail store) | |
| Jul 9, 2019 | Completed final sign-off Nov 2019 | 860 Divisadero St | Nabi Construction & Engineering Inc | revision to 201904238743 (e), 201004238744 (r), provide new steel frame at line 6 in lieu of shear walls, g.l. 5&6. relocate steel moment frame at line 7 and revise shear transfer detail (residential)Details
revision to 201904238743 (e), 201004238744 (r), provide new steel frame at line 6 in lieu of shear walls, g.l. 5&6. relocate steel moment frame at line 7 and revise shear transfer detail (residential) | |
| Apr 23, 2019 | Completed final sign-off Nov 2019 | 860 Divisadero St | Nabi Construction & Engineering Inc | seismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 residential commercial -201904238744Details
seismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 residential commercial -201904238744 | $84,723 |
| Apr 23, 2019 | Completed final sign-off Nov 2019 | 860 Divisadero St | Nabi Construction & Engineering Inc | seismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 commercial residential - 201904238743Details
seismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 commercial residential - 201904238743 | $20,277 |
| Mar 14, 2019 | Completed final sign-off Jul 2019 | 3527 18th St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $110,000 |
| Feb 12, 2019 | Completed final sign-off Jun 2019 | 1136 Montgomery St | Nabi Construction & Engineering Inc | kitchen remodeling, no change on wallsDetails
kitchen remodeling, no change on walls | $10,000 |
| Feb 7, 2019 | Completed final sign-off Jun 2021 | 435 Hayes St | Nabi Construction & Engineering Inc | seismic upgrade for soft-story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4. residentialDetails
seismic upgrade for soft-story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4. residential | $97,124 |
| Feb 7, 2019 | Completed final sign-off Jun 2021 | 435 Hayes St | Nabi Construction & Engineering Inc | seismic upgrade for soft-story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4. commercialDetails
seismic upgrade for soft-story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4. commercial | $12,876 |
| Jan 24, 2019 | Completed final sign-off Feb 2021 | 1327 Lyon St | Nabi Construction & Engineering Inc | seismic upgrade for soft story per sf building code, chapter 4d, 2016 cebc appendix a4Details
seismic upgrade for soft story per sf building code, chapter 4d, 2016 cebc appendix a4 | $130,000 |
| Jan 18, 2019 | Completed final sign-off Apr 2022 | 3527 18th St | Nabi Construction & Engineering Inc | recommencement and completion of work approved under pa# 201403271860Details
recommencement and completion of work approved under pa# 201403271860 | $20,000 |
| Dec 20, 2018 | Never finaled issued Jan 2019, no final | 1400 17th St | Nabi Construction & Engineering Inc | replace (e) windows by (n) windows at north south and east walls. replace two (e) doors w/(n) doors at south wall. n/a for maher.Details
replace (e) windows by (n) windows at north south and east walls. replace two (e) doors w/(n) doors at south wall. n/a for maher. | $5,000 |
| Dec 17, 2018 | Completed final sign-off Jun 2019 | 20 Leona Tr | Nabi Construction & Engineering Inc | seismic upgade for soft story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4Details
seismic upgade for soft story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4 | $130,000 |
| Dec 3, 2018 | Completed final sign-off May 2021 | 591 Guerrero St | Nabi Construction & Engineering Inc | accessible business entrance alterations. soft story not included under this permit. door actuators to be installed at storefronts. small step to be changed to ramp at 2 stores, tile to be restored.Details
accessible business entrance alterations. soft story not included under this permit. door actuators to be installed at storefronts. small step to be changed to ramp at 2 stores, tile to be restored. | $20,000 |
| Dec 3, 2018 | Completed final sign-off May 2021 | 591 Guerrero St | Nabi Construction & Engineering Inc | mandatory soft story retrofit - residential floor. 2016 cebc appendix a-12037.Details
mandatory soft story retrofit - residential floor. 2016 cebc appendix a-12037. | $30,000 |
| Dec 3, 2018 | Completed final sign-off May 2021 | 591 Guerrero St | Nabi Construction & Engineering Inc | mandatory soft story retrofit - commercial floor. 2016 cebc appendix a-4Details
mandatory soft story retrofit - commercial floor. 2016 cebc appendix a-4 | $50,000 |
| Nov 20, 2018 | Expired or cancelled cancelled Aug 2019 | 2350 Van Ness Av | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na commercial - 201811206488Details
seismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na commercial - 201811206488 | $98,100 |
| Nov 20, 2018 | Expired or cancelled cancelled Aug 2019 | 2350 Van Ness Av | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na residential - 201811206487Details
seismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na residential - 201811206487 | $8,300 |
| Nov 14, 2018 | Completed final sign-off Mar 2019 | 650 Potrero Av | Nabi Construction & Engineering Inc, American Mechanical Inc | mechanincal hvac work for permit 201707273049.supplement to mechanical permit pm20181019894 extending permit pm20170815865 for hvac t.i. work. also combine electrical work form ew201711049071 to upgrade (e) building electrical lightings power , data and alarm. title 24 for mech & ele. maher n/a.Details
mechanincal hvac work for permit 201707273049.supplement to mechanical permit pm20181019894 extending permit pm20170815865 for hvac t.i. work. also combine electrical work form ew201711049071 to upgrade (e) building electrical lightings power , data and alarm. title 24 for mech & ele. maher n/a. | $45,000 |
| Nov 2, 2018 | Completed final sign-off Mar 2019 | 650 Potrero Av | Nabi Construction & Engineering Inc | construction phase changes to work undeway per 201707273049, 201708023674. add 4 modular workstationsDetails
construction phase changes to work undeway per 201707273049, 201708023674. add 4 modular workstations | $5,000 |
| Oct 23, 2018 | Completed final sign-off Mar 2020 | 160 10th St | Nabi Construction & Engineering Inc | ti for first floor and add new mezzaine- 1) revision to app#201806141910. 2)resized accessible bathroom. 3)add new 249 sq ft mezzanine. n/a for maher -sprinklers separate permit.Details
ti for first floor and add new mezzaine- 1) revision to app#201806141910. 2)resized accessible bathroom. 3)add new 249 sq ft mezzanine. n/a for maher -sprinklers separate permit. | $20,000 |
| Oct 9, 2018 | Completed final sign-off Mar 2019 | 801 28th Av | Nabi Construction & Engineering Inc | rev to pa# 201809271653; relocate moment frame at grid line "c" resize moment frame colums & beam at grid lineDetails
rev to pa# 201809271653; relocate moment frame at grid line "c" resize moment frame colums & beam at grid line | |
| Sep 27, 2018 | Completed final sign-off Feb 2019 | 1400 17th St | Nabi Construction & Engineering Inc | 1)revision to app#201706220136. 2) replace extg windows by nw at north, south & east walls. 3) partially infill 2 wndow openings and replace extg windows w/nw re-sized windows at east wall. 4) replace 2 extg doors w/nw doors at south wall. 5) revise structural det. as per sheets s2.3.n/a for maherDetails
1)revision to app#201706220136. 2) replace extg windows by nw at north, south & east walls. 3) partially infill 2 wndow openings and replace extg windows w/nw re-sized windows at east wall. 4) replace 2 extg doors w/nw doors at south wall. 5) revise structural det. as per sheets s2.3.n/a for maher | $30,000 |
| Sep 27, 2018 | Completed final sign-off Mar 2019 | 801 28th Av | Nabi Construction & Engineering Inc | seismic upgrade for soft story per sf building code chapter 4edDetails
seismic upgrade for soft story per sf building code chapter 4ed | $120,000 |
| Sep 20, 2018 | Completed final sign-off Dec 2018 | 2835 37th Av | Nabi Construction & Engineering Inc | 1)repair in kind extg damaged walls at grid line 1 and a. 2)repair damaged ceiling. to comply with nov#201856711Details
1)repair in kind extg damaged walls at grid line 1 and a. 2)repair damaged ceiling. to comply with nov#201856711 | $25,000 |
| Sep 19, 2018 | Completed final sign-off Feb 2019 | 1134 Montgomery St | Nabi Construction & Engineering Inc | revision to 201709158429, additional 45 ft of founation replacementDetails
revision to 201709158429, additional 45 ft of founation replacement | $10,000 |
| Sep 14, 2018 | Expired or cancelled expired Sep 2024 | 667 Portola Dr | Nabi Construction & Engineering Inc | seismic upgrade for soft story per sf building code ch 4d, 2016 cebc appendix a4 residentialDetails
seismic upgrade for soft story per sf building code ch 4d, 2016 cebc appendix a4 residential | $42,269 |
| Sep 14, 2018 | Expired or cancelled expired Sep 2024 | 667 Portola Dr | Nabi Construction & Engineering Inc | seismic upgrade for soft story per sf buiding code chapter 4d, 2016 cebc appendix a4 (commercial)Details
seismic upgrade for soft story per sf buiding code chapter 4d, 2016 cebc appendix a4 (commercial) | $102,413 |
| Sep 13, 2018 | Completed final sign-off Sep 2022 | 695 33rd Av | Nabi Construction & Engineering Inc | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809130146Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809130146 | $60,000 |
| Sep 13, 2018 | Completed final sign-off Jan 2021 | 1319 Stockton St | Nabi Construction & Engineering Inc, Bai Construction | seismic upgrade for soft story as per san francisco building code sfebc, chapter 4d 2016 cebc appendix a-4 (residential)Details
seismic upgrade for soft story as per san francisco building code sfebc, chapter 4d 2016 cebc appendix a-4 (residential) | $78,957 |
| Sep 13, 2018 | Completed final sign-off Jan 2021 | 1319 Stockton St | Nabi Construction & Engineering Inc, Bai Construction | seismic upgrade for soft story as per san francisco building code sfebc, chapter 4d 2016 cebc appendix a-4 (commercial)Details
seismic upgrade for soft story as per san francisco building code sfebc, chapter 4d 2016 cebc appendix a-4 (commercial) | $41,043 |