Marco Antonio Camren Campa
- Listed as
- architect
- Firm
- Marco C. Campa
- Based in
- Mountain View
- On San Francisco permits
- Jul 2023 to Aug 2026
19 permits since 2000 (architect on 19 permits): 4 completed, 14 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 155 Hartford St | Arise Remodeling | construction of a 1-story residential type v-b detacched adu in rear of lot.Details
construction of a 1-story residential type v-b detacched adu in rear of lot. | $110,000 |
| Jul 7, 2026 | In progress filed Jul 2026, not yet issued | 3836 San Bruno Av | We Do Construction Inc. | residental ti and soft demo to (e) element reconfiguration of interior spaces and relocation of fixtures includes lmited modifications to certain facade element as needed.Details
residental ti and soft demo to (e) element reconfiguration of interior spaces and relocation of fixtures includes lmited modifications to certain facade element as needed. | $150,000 |
| May 27, 2026 | In progress issued Jun 2026 | 90 Byxbee St | We Do Construction Inc. | interior renovation including partial garage conversion into living space. some demo of certain exiting elements replacement of gas powered system with electric by design; add half bath on main level; demo existing fireplace on main levelDetails
interior renovation including partial garage conversion into living space. some demo of certain exiting elements replacement of gas powered system with electric by design; add half bath on main level; demo existing fireplace on main level | $100,000 |
| Mar 26, 2026 | In progress issued May 2026 | 1363 34th Av | We Do Construction Inc. | the project consists of renovations to the existing single-family dwelling. the first floor scope includes conversion of a portion of the existing garage into conditioned living space and enclosure of an existing rear covered are below the second floor as part of the conditioned space. new side deckDetails
the project consists of renovations to the existing single-family dwelling. the first floor scope includes conversion of a portion of the existing garage into conditioned living space and enclosure of an existing rear covered are below the second floor as part of the conditioned space. new side deck | $140,000 |
| Jan 22, 2026 | In progress filed Jan 2026, not yet issued | 726 30th Av | interior renovation, including the demolition of selected existing elements and a new interior layout. scope also includes limited modifications to certain facade elements as required by the design.Details
interior renovation, including the demolition of selected existing elements and a new interior layout. scope also includes limited modifications to certain facade elements as required by the design. | $256,750 | |
| Jan 14, 2026 | In progress issued Feb 2026 | 457 Oak St | We Do Construction Inc. | revision to pa# 202508193437, add to scope more than 50% stair repair.Details
revision to pa# 202508193437, add to scope more than 50% stair repair. | |
| Dec 22, 2025 | In progress issued Feb 2026 | 747 35th Av | First Step Builders Inc | comply with nov 202543934: residential infill to existing 4 story building located on 1st level, rear. using existing structure and alining with the existing walls above. scope includes new walls, floor finishes. new windows and door.Details
comply with nov 202543934: residential infill to existing 4 story building located on 1st level, rear. using existing structure and alining with the existing walls above. scope includes new walls, floor finishes. new windows and door. | $55,000 |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 1678 23rd Av | garage conversion and utility room encompassing (e) bathroom and part of the garage into living space. remove interior stairs. installation and modification of selected windows to comply with energy code. 2nd fl infill of former stair opening and create storage room.Details
garage conversion and utility room encompassing (e) bathroom and part of the garage into living space. remove interior stairs. installation and modification of selected windows to comply with energy code. 2nd fl infill of former stair opening and create storage room. | $160,000 | |
| Nov 13, 2025 | In progress issued Dec 2025 | 47 Newburg St | We Do Construction Inc. | structural upgrade for installation of a new 8'x7' garage door. no additional plumbing fixturesDetails
structural upgrade for installation of a new 8'x7' garage door. no additional plumbing fixtures | $70,000 |
| Oct 29, 2025 | In progress issued Nov 2025 | 64 Cook St | We Do Construction Inc. | deck extention upgrade of an (e) exterior wood deck including the replacment of structural support, decking railing and stairs as needed located at rearDetails
deck extention upgrade of an (e) exterior wood deck including the replacment of structural support, decking railing and stairs as needed located at rear | $35,000 |
| Oct 21, 2025 | Completed final sign-off Oct 2026 | 1919 Judah St | We Do Construction Inc. | in kind stair replacement. existing non compliant exterior entry stair system bring up to code. new garage door.Details
in kind stair replacement. existing non compliant exterior entry stair system bring up to code. new garage door. | $67,000 |
| Oct 21, 2025 | In progress issued Dec 2025 | 35 Brewster St | We Do Construction Inc., Jr Santos Co | interior renovations, facade upgrades. new cladding and improve to main entrance. 1st flr-master bathroom remodel, replace interior and exterior doors & windows. relocate ahu and add new laundry closet. 2nd flr bathroom remodeling partial remodeling partial remodel of kitchen. structural upgradeDetails
interior renovations, facade upgrades. new cladding and improve to main entrance. 1st flr-master bathroom remodel, replace interior and exterior doors & windows. relocate ahu and add new laundry closet. 2nd flr bathroom remodeling partial remodeling partial remodel of kitchen. structural upgrade | $95,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 550 Broderick St | We Do Construction Inc. | installing new skylights on the existing roof structure.Details
installing new skylights on the existing roof structure. | $8,000 |
| Jul 3, 2025 | Completed final sign-off Mar 2026 | 3100 Moraga St | We Do Construction Inc. | in kind renovation of existing (1) bathroom on 2nd floor. infill the door from bedroom to bathroom, change tub to shower.Details
in kind renovation of existing (1) bathroom on 2nd floor. infill the door from bedroom to bathroom, change tub to shower. | $45,000 |
| Jun 30, 2025 | Completed final sign-off Sep 2025 | 550 Broderick St | We Do Construction Inc. | remodeling the existing primary bathroom and constructing a new full bathroom within the existing closet space.Details
remodeling the existing primary bathroom and constructing a new full bathroom within the existing closet space. | $60,000 |
| Jun 30, 2025 | In progress issued Apr 2026 | 53 Hill St | We Do Construction Inc. | exterior alteration, interior renovation and window upgrades of apartment unitDetails
exterior alteration, interior renovation and window upgrades of apartment unit | $100,000 |
| Mar 11, 2025 | Completed final sign-off Jan 2026 | 3611 22nd St | We Do Construction Inc. | interior remodel for open concept kitchen, living and dining space. more than 50% of existing exterior walls are maintained. project is not considered major remodel.Details
interior remodel for open concept kitchen, living and dining space. more than 50% of existing exterior walls are maintained. project is not considered major remodel. | $90,000 |
| Feb 11, 2025 | In progress issued Mar 2025 | 7 Elsie St | Triond Remodeling Inc | interior remodel, windows upgrade complete kitchen and bathroom remodeling structural upgrades electrcal upgrades. add bath next to (e) office on level 1Details
interior remodel, windows upgrade complete kitchen and bathroom remodeling structural upgrades electrcal upgrades. add bath next to (e) office on level 1 | $90,000 |
| Jul 10, 2023 | Expired or cancelled withdrawn Jan 2025 | 343 Paul Av | conversion of church/assembly space into 4 residential dwelling units.Details
conversion of church/assembly space into 4 residential dwelling units. | $90,000 |