Aws Salahaldin
- Listed as
- engineer
- Firm
- Aaa Engineering Design
- Based in
- Signal Hill
- On San Francisco permits
- Mar 2025 to Aug 2026
6 permits since 2000 (engineer on 6 permits): 6 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 155 Hartford St | Arise Remodeling | construction of a 1-story residential type v-b detacched adu in rear of lot.Details
construction of a 1-story residential type v-b detacched adu in rear of lot. | $110,000 |
| May 28, 2026 | In progress filed May 2026, not yet issued | 1619 43rd Av | Di Build Llc | partial garage conversion to habitable space with bedroom and sitting area, office and bathroom. maintain 20' deep garage. construct new deck off the primary bedroom on the main floor. replace (e) single pane aluminum windows @ rear on main flr with fiberglass egress windows.Details
partial garage conversion to habitable space with bedroom and sitting area, office and bathroom. maintain 20' deep garage. construct new deck off the primary bedroom on the main floor. replace (e) single pane aluminum windows @ rear on main flr with fiberglass egress windows. | $120,000 |
| May 5, 2026 | In progress issued May 2026 | 2040 Oakdale Av | Elio Marroquin Construction | structural revision to pa 202010066034Details
structural revision to pa 202010066034 | |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 1678 23rd Av | garage conversion and utility room encompassing (e) bathroom and part of the garage into living space. remove interior stairs. installation and modification of selected windows to comply with energy code. 2nd fl infill of former stair opening and create storage room.Details
garage conversion and utility room encompassing (e) bathroom and part of the garage into living space. remove interior stairs. installation and modification of selected windows to comply with energy code. 2nd fl infill of former stair opening and create storage room. | $160,000 | |
| Oct 21, 2025 | In progress issued Dec 2025 | 35 Brewster St | We Do Construction Inc., Jr Santos Co | interior renovations, facade upgrades. new cladding and improve to main entrance. 1st flr-master bathroom remodel, replace interior and exterior doors & windows. relocate ahu and add new laundry closet. 2nd flr bathroom remodeling partial remodeling partial remodel of kitchen. structural upgradeDetails
interior renovations, facade upgrades. new cladding and improve to main entrance. 1st flr-master bathroom remodel, replace interior and exterior doors & windows. relocate ahu and add new laundry closet. 2nd flr bathroom remodeling partial remodeling partial remodel of kitchen. structural upgrade | $95,000 |
| Mar 19, 2025 | In progress filed Mar 2025, not yet issued | 674 London St | bakcyard landscape construction (n) patio with pavers, retaining wall, wood deck & stairs & 7' tall wood fence. install new planting and drip irrigation system. install low voltage lighting fixturesDetails
bakcyard landscape construction (n) patio with pavers, retaining wall, wood deck & stairs & 7' tall wood fence. install new planting and drip irrigation system. install low voltage lighting fixtures | $200,000 |